Statement of Work.pdf
PDF 95 KB Posted
- Attached to
- FMC Devens - Water Treatment Services
- Solicitation number
- 15B0AT26Q20500003
About this file
This is a Statement of Work (SOW) for water treatment services at the Federal Bureau of Prisons' Federal Medical Center (FMC) Devens in Ayer, Massachusetts. The Federal Bureau of Prisons intends to award a firm-fixed price contract for comprehensive water treatment services, including all chemicals, test kits, testing reagents, laboratory and field services, and chemical feed/control equipment. Services cover three Donlee Boilers, three Trane Chillers, one Trane Cooling Tower, hot water loop, chilled water loop, and a Well/McClain boiler at the warehouse facility.
The contractor must provide routine monthly service (minimum 12 visits annually) during normal working hours, with emergency response within four hours of notification. Each visit requires a minimum one-hour on-site presence for sample collection, field analysis, reagent quality checks, test result reviews, and dissolved oxygen testing. Additional requirements include annual operator training on chemical usage, minimum annual boiler and chiller internal inspections, corrosion coupon collection and analysis, and deposit analysis reports. For problem-solving, the contractor must maintain in-house or contract laboratory capabilities with results reported within three weeks. Specific analyses include complete elemental water analysis, microbiological analysis, metallographic analysis, boroscope inspections, and remote condensate testing as needed. All written visit reports must be provided within 14 calendar days. The contractor must provide all chemicals and supplies, warehouse extra inventory locally, maintain chemical feed pumps, and ensure compliance with Bureau Safety Department policy for chemical storage and disposal. Professional Massachusetts licensing is required, and the contractor must adhere to all institution security regulations with FMC Devens providing an escort during contract performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination 2015-4035 Rv 35.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATER TREATMENT SERVICE
STATEMENT OF WORK
Subject
The Federal Bureau of Prisons, Federal Medical Center (FMC) Devens, intends to award a firm-fixed price contract for the provision of water treatment services which meets the requirements outlined within this Statement of Work (SOW). General information regarding the Federal Bureau of Prisons (Bureau) facilities and referenced Program Statements can be located at www.bop.gov.
Place of Performance
FMC Devens is located at 42 Patton Road, Ayer, Massachusetts 01432. Contract services will be performed on-site at the FMC and including outlying buildings. The address identified on block 15 of the SF 1449 is the address for the delivery of any equipment, supplies, etc.
Scope of Services:
The contractor is to provide process water treatment products and services to FMC Devens. This contract will include all water treatment chemicals, water test kits, and testing reagents in quantities that are consistent with normal operation. Comprehensive laboratory and field services will be provided to ensure adequate supervision of the water treatment program. The contractor is expected to supply all water treatment feed/control equipment under this contract. The contractor will alert FMC Devens immediately in writing of any problems or issues when they develop to ensure there will be minimal interruption in service.
Systems requiring service include the following:
(3) Donlee Boilers, model #
(3) Trane Chillers, model #
(1) Trane Cooling Tower
(1) Hot Water Loop
(1) Chilled Water Loop
(1) Well/McClain boiler (Warehouse)
Required Service:
Specific Requirements
Routine Service: Scheduled service by a qualified representative must be conducted monthly. This equates to a minimum of 12 times per calendar year. The purpose of these service visits will be to prevent potential problems that will reduce equipment efficiency and/or result in equipment damage. All visits must be scheduled by the contractor in advance. Note: All routine visits shall be during normal working hours and must be coordinated with General Foreman at FMC Devens.
Emergency Service: Response time for all emergency services shall not exceed four hours after notification on the same day.
For in-plant testing and analysis relative to boiler/cooling chemical treatment, the primary service representative will spend a minimum of one hour per visit at the plant and will provide the following:
1. In plant sample collection of boiler feed water, boiler water, condensate, softener, and/or hot water loop system, and cooling water systems for field analysis. Perform all tests necessary to evaluate performance of treatments used in the program to ensure the protection of the systems.
2. Checking quality of plant's field testing reagents.
3. Review of plant's field test results/records. Calibration of tower inhibitor controllers.
4. Provide dissolved oxygen testing onsite.
Operator Training and Updating:
Training will be provided at a minimum of once per year. Training will not be counted as a routine visit but training could be done on the same day of the routine visit. The contractor will train FMC Devens staff on the usage of the chemical agents utilized in daily water testing.
The contractor is expected to perform boiler/chiller internal inspection a minimum of once per year on each boiler and each chiller.
The contractor is expected to provide deposit analysis and inspection reports for each unit. Plant personnel shall provide reasonable advance notice in order to schedule inspections with the designated service representative.
Along with the plant staff, the contractor is expected to collect (existing) corrosion coupon of boiler feed water & condensate, tower water and chilled water for laboratory analysis. Additionally, the contractor shall reinstall coupons for subsequent operating periods.
For on-site testing and analysis relative to tower chemical treatment, the primary service representative will spend a minimum of one hour per visit and will provide the following:
1. Micro-biotesting of water in open (tower) loop system.
2. pH and conductivity of tower water system.
3. Inhibitor levels in open and closed systems.
Results:
For each plant visit, written report results of that visit must be discussed with the on-duty Powerhouse Operator or with the General Foreman. A copy must be left with the Powerhouse Operator and an electronic copy sent to
. These formal written reports must be received no later than 14 calendar days after the plant visit/inspection date. ·
Research, Laboratory, Backup, and Problem Solving:
The contractor shall have an in-house laboratory or access to a contract laboratory capable of assisting in solutions of problems that may arise in order to limit loss of efficiency or equipment damage. When samples are taken for resolution of problem issues and submitted for analysis, results must be reported to FMC Devens within three weeks.
Problem Solving:
To solve any specific problem, and at the request of the plant superintendent, the vendor must provide assessments for the following analyses. Analysis reports shall be submitted, within ten days from the date of collection, to the Powerhouse Operator, General Foreman and to
Heating System Complete elemental water analysis Boiler(s), raw water, and make-up & feed water as needed.
Deposit analysis Boiler waterside as needed.
Corrosion coupon analysis for boilers Feed Water, Condensate Metallographic analysis As needed for specific problems Zeolite resin analysis As needed for specific problems Remote condensate testing Twice per year- as needed Fuel oil testing As needed Boroscope inspection As needed for specific problems Oxygen level Deaerator, as needed for a specific problem Amine studies As needed for specific problems, Twice per year- as needed Steam quality studies As needed for specific problems
Cooling System
Complete elemental water analysis Tower water, chilled water, As needed for specific problems Microbiological analysis Tower water, chilled water- as needed.
Deposit analysis Tower water, chilled water -as needed Corrosion Coupon analysis Vendor must provide coupons that meet owner's materials specification Metallographic analysis As needed for specific problems Boroscope inspection As needed for specific problems
Chemicals:
All chemicals will be provided by the contractor and MSDS/SDS sheets will be provided to the COR. Chemicals will be provided in amounts that are consistent with normal operations. The contractor will coordinate with the plant operator to determine the amount of chemicals required. The contractor will locally warehouse extra chemicals in order to re-supply FMC Devens if needed. If chemical use climbs above 30% from what is expected, the chemicals will be billed separately. To reduce the risk to inmates and staff, this contract will utilize chemical feed pumps to deliver chemicals into the process water. The chemical feed pumps are expected to be provided, installed, and maintained by the contractor. All chemical feed pumps will be the responsibility of the contractor for the duration of the contractor.
Chemical Storage:
All chemicals are to be stored per Bureau Safety Department policy. A copy of the Safety Department Policy is available at www.bop.gov. The Program Statement is P.S. 1600.09. All empty chemical containers and unused chemicals are to be disposed of by the contractor. No empty containers are to be left onsite.
Supplies:
All supplies and equipment will be provided by the contractor. This includes but is not limited to water treatment chemicals, water test kits, and testing reagents, etc. Water treatment feed/control equipment is not covered under this contract. Additional water chemicals shall be warehoused by the contractor locally to ensure that adequate supplies are readily available at all times.
Schedule:
Service for the Boiler Water treatment will be required on a monthly basis at a minimum.
Typical service calls should be completed within a day. Supplemental chemicals shall be warehoused locally to ensure that normal service and water quality will not be affected should the contractor's chemical supply at FMC Devens be depleted during normal or abnormal operating conditions. Should a longer period be needed, the contractor shall contact the Contracting Officer's Representative (COR) and the Contracting Officer as soon as possible.
Qualifications:
The contractor must be properly licensed to perform these services in the Commonwealth of Massachusetts, if required. The contractor agrees to follow all federal, state, and local laws. The contractor will be required to provide professional certifications prior to award.
Inmate Management:
Provisions of services under this contract will require infrequent and supervised contact with inmates. The contractor will not be responsible for management of inmates.
Institution Security:
The contractor agrees to adhere to all regulations prescribed by the institution for the safety, custody, and conduct of inmates. FMC Devens will provide an escort for the contractor during the duration of the contract. Due to the sensitive nature of the correctional environment, the contractor is expected to be prompt in reporting to the workplace in order to support the inmate accountability policy.