Statement_of_Work.pdf

PDF 10 MB Posted

Attached to
Carson National Fish Hatchery Quarters 4 Interior Federal contract opportunity
Solicitation number
140FC326Q0043
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This is a Statement of Work (SOW) for interior wall repainting services at Carson National Fish Hatchery, a U.S. Fish & Wildlife Service facility located in Carson, Washington. The project involves repainting interior walls in Quarters 4, an ADA-compliant manager's residence, across six rooms and associated hallways. Work must be completed within 90 days of contract award, with normal duty hours Monday through Friday from 7:30 a.m. to 4:00 p.m.

The contractor must furnish all labor, materials, equipment, tools, supervision, and transportation necessary to complete the project. Scope includes surface preparation (repair of holes, cracks, bumps, loose tape, and nail pops; sanding; cleaning; and caulking per PDCA/PCA P4 standards), application of one primer coat to repaired or bare surfaces, and two finish coats of Benjamin Moore Low-VOC satin interior paint in Butter Pecan color (or approved equal). Ceilings are excluded from painting; only walls and all door trims are to be painted. The contractor must submit paint product data sheets, Safety Data Sheets, color samples if using approved equal products, and primer product data sheets for approval before work begins. Contractor qualifications require demonstrated residential interior painting experience, Washington State Department of Labor Specialty Contractor registration, a $12,000 surety bond, $50,000 public liability insurance, $100,000 property damage insurance, and EPA RRP certification if lead-based paint is suspected. All work must comply with OSHA safety requirements, EPA environmental regulations, and manufacturer specifications. Government acceptance is contingent upon uniform color and sheen with no visible defects, clean trim lines, full coverage on repaired areas, proper protection of government property during work, and completion of all identified punch list items, with any deficiencies corrected at no additional cost to the Government.

View the file

Other files for this federal contract opportunity

Other files attached to Carson National Fish Hatchery Quarters 4 Interior, newest first.
File Type Posted
Wage_Determination.pdf PDF
Sol_140FC326Q0043.pdf PDF
Combined_Synopsis_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Carson NFH – Quarters 4 Interior Wall Repainting

1. General:

1.1 Project Description

The U.S. Fish & Wildlife Service, Carson National Fish Hatchery, located at 14041 Wind River

Hwy, Carson, WA 98610, requires interior wall painting services for Quarters 4, an

ADA-compliant manager’s residence on the hatchery campus. This work includes repainting the interior walls of six rooms and associated hallways as described in the Scope.

1.2 Purpose

The purpose of this project is to restore and refresh the living environment within Quarters 4 to support adequate housing conditions for assigned personnel. The repainting will improve appearance, cleanliness, durability, and ADA suitability for future occupants.

1.3 Contractor Qualifications

Contractor shall have demonstrated experience in residential interior painting, including surface preparation, priming, and finishing. Contractor must comply with applicable federal, state, and local codes. Contractor must be registered with the Washington State Department of Labor (L&I) as a Specialty Contractor and possess the following:

$12,000 Surety Bond

$50,000 Public Liability

$100,000 Property Damage Insurance

If any lead-based paint is suspected due to facility age, contractor must be certified in EPA

Renovation, Repair and Painting (RRP) standards.

1.4 Other Requirements

All work must comply with OSHA safety requirements and EPA environmental regulations.

Contractor shall follow all manufacturer specifications for preparation and installation of paint products. Reference materials include the USFWS Facilities Standards and industry standards such as PDCA/PCA P4 for surface preparation.

2. Place of Performance and Period of Performance

2.1 Place of Performance

U.S. Fish & Wildlife Service, Carson National Fish Hatchery, 14041 Wind River Hwy

Carson, WA 98610. The address for Quarters 4 is:

142 Salmon Lane

Carson, WA 98610

2.2 All work shall be completed no later than 90 days after award. Vendor shall verify field conditions before starting work. Weather is not expected to affect the interior work.

2.3 Normal duty hours Monday through Friday 7:30 a.m. - 4:00 p.m. In the event of emergencies, Contractor shall provide contact information.

2.4 Non-duty hours include weeknights, weekends, and Government holidays (New Year’s Day, Martin Luther King Jr’s Birthday, Juneteenth, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).

3. Scope

The Contractor shall furnish all labor, materials, equipment, tools, supervision, protection, and transportation necessary to perform interior repainting of Quarters 4 as detailed below.

3.1 Areas to Be Painted

Walls only, ceilings are not to be painted.

Approximate dimension of rooms included:

• Living Room – 11.6 ft x 22.0 ft

• Master Bedroom – 13.8 ft x 15.0 ft

• Bedroom #1 – 11.5 ft x 11.3 ft

• Bedroom #2 – 8.7 ft x 11.5 ft

• Master Bathroom – 9.3 ft x 10.7 ft

• Bathroom – 11.6 ft x 5.2 ft

• Associated entries and hallways

• Wall height: 8.0 ft

• All door trims

Kitchen and dining room excluded.

3.2 Surface Preparation Requirements

Contractor shall:

• Repair defects including holes, cracks, bumps, loose tape, and nail pops.

• Sand surfaces smooth to achieve a uniform finish.

• Clean all surfaces to remove dust, dirt, grease, and contaminants.

• Caulk gaps at trim, joints, and transitions.

• Prepare surfaces in accordance with industry standard PDCA/PCA P4.

3.3 Painting Requirements

• Apply one full primer coat to all repaired or bare surfaces.

• Apply two finish coats of Benjamin Moore Low-VOC satin interior paint (color: Butter

Pecan) or approved equal.

• All materials shall be from professional-grade product lines.

3.4 Product Submittals

Contractor shall submit for approval:

• Paint product data sheets

• Safety Data Sheets (SDS)

• Color samples (if using “approved equal”)

• Primer product data sheet

Work shall not begin until submittals are approved.

3.5 Protection of Government Property

• Use drops cloths and masking to protect floors, cabinets, electrical fixtures, and ADA features

• Cover HVAC registers to prevent contamination

• Move and return furniture (if any) to its original location

• Repair any damage caused by contractor operations at no cost to the Government

• Take any additional precautions necessary to protect property from damage

3.6 Cleanup & Disposal

• Remove all tools, trash, tape, coverings, cans, and debris.

• Dispose of waste materials in accordance with state and federal environmental laws.

• Leave all work areas clean and ready for immediate occupancy at project completion.

4. Deliverables and/or Delivery Schedule:

4.1 Deliverables

• Completed interior painting of all specified areas

• Surface repairs completed to industry standard

• End-of-job cleanup

• Warranty documentation (1-year minimum on workmanship and materials)

4.2 Documentation Deliverables

• Paint and primer submittals

• SDS sheets

• Final walkthrough punch list and completion confirmation

5. Data Management Plan (DMP)

N/A

6. Government-Furnished Equipment (GFE) / Government-Furnished Information

(GFI)

N/A

7. Evaluation and Acceptance

7.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon: Compliance with this SOW

• Meeting paint industry quality standards set forth in the IBC

• Correction of deficiencies documented during punch list review

(See detailed criteria in Section 8.2)

8. Quality Control/Quality Assurance:

8.1 Quality Control

Contractor shall maintain QC processes consistent with industry standards and manufacturer specifications.

8.2 Inspection / Acceptance Criteria

Government will inspect based on:

• Uniform color and sheen with no visible holidays or thin areas

• No runs, drips, sags, roller marks, or inconsistent textures

• Clean lines at edges and trim

• Full coverage on all repaired areas

• No damage to surfaces or property

• Proper cleanup and waste removal

• Completion of all punch list items

Work failing inspection shall be corrected at no additional cost to the Government.

Bathroom 1 A

Bathroom 1

Bedroom 1

Bedroom 1a

Bedroom 2

Bedroom 2A

A04 SOW
Binder1
A06 Bathroom 1A
A06 Bathroom1
A06 Bedroom1
A06 Bedroom1a
A06 Bedroom2
A06 Bedroom2a

File details come from the government source that posted it. Updated .