Statement of Work.pdf
PDF 140 KB Posted
- Attached to
- NAB Galley Salad and Beverage Bars
- Solicitation number
- N0024426Q0048
About this file
This is a Statement of Work for the fabrication and installation of salad and beverage bars at Naval Base Coronado NAB Galley. The contractor shall provide miscellaneous furniture, materials, fabrication of custom equipment, purchase of commercially manufactured equipment, supervision, delivery, and set-in-place installation of all specified items. The project requires delivery of two 32-foot double-sided salad bars, two 18-foot double-sided salad bars, four cold rails (VOLLRATH #FC-4CP-05120-N), two frost tops (VOLLRATH #FC-4CP-04120-F), four plate dispensers (LAKESIDE #4006), four soup wells (VOLLRATH #3646410), and four glass dispensers (LAKESIDE #977). Equipment may be substituted with equivalent types based on availability. All custom equipment must be constructed of 3mm thick Aluminum Composite Material (ACM) with separate bases bolted together and leveled on site, featuring adjustable leveling legs with casters and heavy-duty paddle latch doors on both long sides. Countertops shall be oversized Corian with stainless steel rub strips, and the project includes six double-sided buffet-style sneeze guards above soup units and two double-sided, double-tier sneeze guards above cold rails, all constructed of 1½-inch tubular extruded aluminum with ¼-inch thick glass and fluorescent lighting.
The contractor is responsible for verifying all dimensions prior to bidding, providing certified personnel, obtaining necessary security passes, and performing all work Monday through Friday from 0730-1700 excluding meal hours (Breakfast: 0600-0730; Lunch: 1100-1230; Dinner: 1600-1730), with night or weekend shifts available upon coordination with the Food Service Officer at no additional cost. The contractor must provide CAD and Symantec drawings detailing electrical outlet locations and shop drawings for custom equipment after contract award, contain dust with plastic barriers, perform daily cleanup, and assemble all units per manufacturer specifications. Custom equipment must comply with NSF requirements and the BABA Act (Build America, Buy America). The place of performance is NAB Coronado, Building 300, 3420 Guadalcanal Road, San Diego, CA 92155, with a period of performance from 01 September 2026 to 28 February 2027. Manufacturing shall commence upon contract award with an estimated completion date to be established at that time. Installation dates are to be determined based on galley renovation completion and will be coordinated with the Installation Food Service Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NAB Salad Bev Bar Tech Exhibit.pdf | ||
| RFQ N00244-26-Q-0048.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK|
Naval Base Coronado NAB Galley
Salad and Beverage Bars
Fabrication and Installation of Salad and Beverage Bars
1.0 Scope of Work
The contractor shall provide miscellaneous furniture, materials, fabrication of custom equipment, purchase of commercially manufactured equipment, supervision, delivery, and set-in-place installation of all numbered items. All work shall be executed in strict accordance with these specifications, applicable drawings, and local codes, including that which is reasonably inferred, unless noted otherwise.
2.0 Equipment Deliverables
The contractor shall provide the following core structural units and commercially manufactured buyout equipment:
Quantity Equipment Description Model / Part Number
2 Each 32’ Double Sided Salad Bar Custom Fabrication
2 Each 18’ Double Sided Salad Bar Custom Fabrication
4 Each Cold Rail VOLLRATH #FC-4CP-05120-N
2 Each Frost Top VOLLRATH #FC-4CP-04120-F
4 Each Plate Dispenser LAKESIDE #4006
4 Each Soup Well VOLLRATH #3646410
4 Each Glass Dispenser LAKESIDE #977
Note: Equipment can be substituted with an equivalent type based on availability.
3.0 Construction and Material Specifications
3.1 Base Construction and Casework
• Material: All Aluminum Composite Material (ACM) construction, 3mm thick. (Note: A sample is required with the proposal).
• Base Structure: Separate bases bolted together and leveled on site. Steel bases must be constructed of square tubing.
• Panels and Trim:
• Pre-painted black ACM Toe Kicks (Extra-low toe kicks shipped loose to conceal casters).
• Laminated ACM Panels (One uniform color for customer-visible sides only; all non-visible sides shall be black).
• 1” Boston Bumper (Standard colors only).
• Access and Mobility:
• Adjustable leveling legs with casters.
• Heavy-duty paddle latch ACM doors located on both long sides for access, utilizing concealed hinges.
3.2 Countertops and Hardware
• Countertops: Multiple oversized Corian countertops with a visible seam at cabinet break points and built-in stainless steel rub strips.
• Hardware: Countertop Grommets (x8).
• Clearance Warning: Openings and pathways must be verified by the contractor to accommodate at least a 43-inch clearance for installation.
3.3 Sneeze Guards and Lighting
• Soup Stations: Six (6) double-sided buffet-style sneeze guards above the soup units with top shelves. Constructed of 1 ½” tubular extruded aluminum (powder coated, color TBD) and ¼” thick glass secured in a tight-fitting channel.
• Cold Rails: Two (2) double-sided, double-tier buffet-style sneeze guards above the cold rails with top shelves. Constructed of 1 ½” tubular extruded aluminum (powder coated, color TBD) and ¼” thick glass secured in a tight-fitting channel.
• Lighting: Fluorescent lighting installed within sneeze guards, including black boots on toggles.
4.0 Contractor Responsibilities and Installation
• Contractor is responsible for verifying all dimensions prior to bidding and installation.
• The contractor will provide personnel who are certified to perform required tasks.
• Contractor will be permitted to work inside of the Dining Facility during the following hours:
Monday through Friday - 0730-1700 except during meal hours and holidays. Meal hours are:
Breakfast: 0600-0730; Lunch: 1100-1230; Dinner 1600-1730. Night or weekend shift may be coordinated with Food Service Officer with no additional cost in pricing. Night shift is preferred if project involves loud noise and heavy dust to not interfere with patrons during meal hours and must be coordinated with the FSO. Exact days of work will be coordinated before commencement to ensure space availability. Coordinate with LCPO /FSO before commencing work to ensure serving line or each section is secured for work while utilizing different serving lines to serve the patrons. Immediate work area will be properly secured by the contractor and will not conflict with meals being served or dining area being utilized.
• Contractor will provide plastic barriers to contain dust or paint.
• Contractor is responsible for daily clean up and disposal of all generated debris/materials to proper disposal or recycle containers at the back dock.
• Contractor is responsible to obtain necessary security pass for base access.
4.1 Engineering and Site Preparation
• Drawings: The contractor shall provide CAD drawings and Symantec drawings detailing electrical outlet locations. Shop drawings for custom equipment will be provided after the award of the contract
• Site Modifications: The contractor will not perform any site modifications required to accommodate the new salad bars.
• Site Verification: The drawings and specifications provided are for assistance and guidance.
Extreme accuracy of existing drawings is not guaranteed; the contractor must verify that existing building conditions, exact dimensions, locations, and levels will accommodate the custom fabricated items.
4.2 Assembly and Installation
• Assembly: The contractor will assemble all units that require assembly to maintain the manufacturer's warranty.
• Placement: The contractor shall move the units into place and assemble them strictly per the manufacturer's installation instructions.
5.0 Delivery and Schedule
• Manufacturing: Manufacturing of the buffet lines will commence upon contract award. The estimated work completion date will be established upon award.
• Installation Date: Delivery and installation dates are to be determined (TBD) based on the completion of the galley renovation. Will be coordinated with the Installation Food Service Officer
6.0 Manufacturing Standards and Compliance
• Custom Equipment: Custom equipment shall be fabricated in accordance with standard manufacturing methods, strictly adhering to NSF requirements and the BABA Act (Build America, Buy America).
• Catalog Equipment: Commercially purchased catalog equipment shall be fabricated in accordance with the original manufacturer’s catalog specifications.
7.0 Place of Performance
NAB Coronado, BLDG 300 3420 Guadalcanal Rd.
San Diego, CA 92155
8.0 Period of Performance
01 September 2026 to 28 February 2027
File details come from the government source that posted it. Updated .