Statement of Work.pdf
PDF 191 KB Posted
- Solicitation number
- 70Z03826QW0000056
About this file
Statement of Work Summary: PR# 6048-ND01
This Statement of Work (SOW) establishes requirements for the U.S. Coast Guard to obtain inspection, modification, and repair services for TCAS II Processor components (part numbers 940-0330-001 and 940-0331-001) from qualified repair facilities. The contractor must be an Original Equipment Manufacturer (OEM), OEM Authorized Repair Center, or FAA Certified 145 Repair Center acceptable to the Coast Guard. The contractor shall comply with OEM specifications, Component Maintenance Manuals (CMM), Service Bulletins, and Overhaul and Repair Instructions (ORI), and maintain ISO 9000 certification or equivalent quality system. The contract calls for inspection and modification of one TCAS II Processor (part 940-0330-001) and overhaul/repair of nine TCAS II Processors (part 940-0331-001, NIIN 01-614-1494).
The contractor must perform inspection/modification and overhaul services to meet OEM functional requirements, complete cleaning per applicable CMMs to remove hazardous substances (hexavalent chromium, cadmium, lead), and provide a Teardown and Inspection Report (TIR) within five calendar days of inspection. The required turn-around-time is ten days after receipt of material (ARM), though earlier delivery is desired without additional government charges. All components must be airworthy and suitable for USCG aircraft installation, with FAA 8130-3 airworthiness release or equivalent certification required. Components shall be packaged per CMM and ASTM D 3951-10 standards and shipped in accordance with MIL-STD-2073. Final inspection and acceptance will be performed by Aviation Logistics Center (ALC) quality assurance personnel. The contractor may request Beyond Economical Repair (BER) determination from the Contracting Officer if initial inspection reveals significant repair requirements outside normal scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD Tarrant County Texas.pdf | ||
| Solicitation Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .