This is a Statement of Work (SOW) for a facilities sustainment project at NSWC Crane to install roof penetration, roof curb, vent pipe, and electrical power for ovens and a fume hood in Building B330C, Room 305. The mechanical requirements include venting three pieces of equipment to the exterior: two small ovens requiring 2.5" diameter vents, and one fume hood requiring a 10" diameter thermoplastic duct. The project specifics mandate security grates for vents 96 square inches or larger, and specify using a thermoplastic duct to prevent corrosion from chemical usage.
The document outlines comprehensive contractor responsibilities, including obtaining all necessary permits, providing labor and materials, ensuring safety compliance, maintaining clean work areas, and coordinating building access. The project requires a preconstruction kick-off meeting 10 working days prior to commencement and a post-award kick-off meeting within 15 working days after contract award. Potential asbestos abatement is addressed, with specific removal and disposal guidelines. The funding is coded as indirect, and while specific award and completion dates are not specified, the document indicates these will be established during the post-award meeting, with site availability to be coordinated with the point of contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CDRL_A002.pdf | ||
| Solicitation.pdf | ||
| CDRL_A001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 03 October 2025
1021 Facilities – Sustainment
Statement of Work
Project: Oven & Fume Hood Exhaust Building B330C, Room 305
ARCHIBUS Ticket 148911
1. Requirement
1.1. Background
1.1.1. This project is to furnish all design, material, labor, transportation, tools, equipment and supervision to install roof penetration, roof curb, vent pipe & electrical power for ovens and fume hood.
2. Applicable Documents
OPNAVINST 11010.20J Facilities Projects Instruction
10 CFR 435 Energy Conservation Voluntary
Performance Standards for Commercial and Multi-Family High Rise Residential
Buildings
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1926 Safety and Health Regulations for
Construction
Assistant Secretary of the Navy for
Research, Development, and Acquisition
(ASN RDA) MEMO
DoN Policy on Digital Product/Technical
Data w/Attachment "Guidance on
Acquisition and Conversion of Product /
Technical Data to Digital Form"
DoD 5000.04-M-1 Cost and Software Data Reporting
Manual, Cost Analysis Improvement
Group (CAIG)
DoDD 4140.1 Supply Chain Materiel Management
Policy
DoDD 5000.01 The Defense Acquisition System
DoDI 5000.02 Operation of the Defense Acquisition
System
EM385-1-1 U.S. Army Corps of Engineers Safety and
Health Requirements Manual
MIL-STD-461F DoD Interface Standard- Requirements for the Control of Electromagnetic
Interference Characteristics of
Subsystems and Equipment
MIL HDBK 1013 1A Design Guidelines for Physical Security of Facilities
NEPA 70E Standard for Electrical Safety
NSACRANEINST 08020.1E Explosive Safety Program At NSA Crane
NSACRANEINST 08020.1E CH-11 Explosive Safety Program Chapter 11
HERO Program
NSACRANEINST 08020.1E CH-2 Explosive Safety Program Chapter 2
Safety Requirement in Explosive Areas
NSACRANEINST 08020.1E CH-4 Explosive Safety Program Chapter 4
Parking of POV in Explosive Magazine
Areas
NSACRANEINST 08020.1E CH-5 Explosive Safety Program Chapter 5
Wildfire Prevention & Control
NSACRANEINST 08020.4B Hazards of Electromagnetic Radiation to
Ordnance Emission Control Bill
NSACRANEINST 11200.7C Motor Vehicle and Pedestrian Traffic
Control and Enforcement
NSACRANEINST 11262.1A Management of Weight Handling
Equipment
NSACRANEINST 5530.1B Visitor / Guest Access Control
NSACRANEINST 5100.13A NSA Crane Smoking and Tobacco Use
NSWCCRANEINST 05090.2C Hazardous Waste Management Plan
NSWCCRANEINST 05100.7 Hazardous Material Control and
Management Program
NSWCCRANEINST 12000.3 COVID-19 Face Covering Policy
NSWCCRANEINST 12735.1A Workplace Violence Prevention
NSWCCRANEINST 12792.2 Drug-Free Workplace Program
NSWCCRANEINST 5100.1A Occupational Safety and Health Program
NSWCCRANEINST 5100.2 Contractor Safety and Health Program
NSWCCRANEINST 5500.1A Portable Electronic Devices, Photography, and Audio Visual
Recording
OPNAVINST 1500.76B Naval Training System Requirements, Acquisition, and Management
OPNAVINST 5100.19E Vols. I, II, and III: Navy Safety and
Occupational Health (SOH) Program
Manuel for Forces Afloat
OPNAVINST 5100.23H CH-1 Navy Safety and Occupational Health
(SOH) Program Manual
OPNAVINST 5102.1 Navy and Marine Corps Mishap and
Safety Investigation, Reporting, and
Record Keeping
SECNAVINST 5370.2J Standards of Conduct and Government
Ethics
TITLE 40 Code of Federal Regulations
UFGS 01 74 19 Construction and Demolition Waste
Management
USC42, Chapter 55 National Environmental Policy; Section
4321-4370d
UFC 3-560-01 Operation and Maintenance: Electrical
Safety
UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
ER 415-1-10 Submittal Register
UFGS 01 33 00 Submittal Procedures
FAR 52.236-25 Registration of Designers
01 45 00.00 10 Quality Control
3. Scope
3.1. General Requirements
3.1.1. Although this document is intended to identify all significant features of the Work to be accomplished in the performance of this task order, it should not be considered inclusive of all minor tasks required for completion of the major work described herein.
3.1.2. The contractor is responsible for all permits applicable to this work.
3.1.3. The contractor is to provide all labor, material, equipment, and supervision to complete all work described in this statement of work.
3.1.4. The Contractor shall be responsible for field verification of actual conditions prior to commencement of the work.
3.1.5. All quantities are approximate, and it is the responsibility of the contractor to take his or her own measurements before submitting a proposal for this task order.
3.1.6. The contractor is responsible for keeping all parking lots, roadways, sidewalks, and hallways impacted by construction traffic, clean and clear of construction debris. Clean the worksite area at the end of every shift/workday and properly discard trash and debris.
3.1.7. The contractor is to ensure all staged material is under protection from elements and maintained in an organized manner.
3.1.8. Building access will be coordinated by the Resident Technical Authority
(RTA). Restricted access/classified spaces will require a government escort at all times. Note: Some areas will not allow electronic devices.
3.1.9. Power Outgages: All power outages should be coordinated with the
Government Contracting Officer’s Representative (COR) and approved by the building users beforehand.
3.1.10. The Contractor is responsible for quality control of all work activities performed via this task order.
3.1.11. Safety Compliance: The Contractor is responsible for complying with all local and federal safety standards for all work activities performed via this task order.
3.1.12. Code Compliance: Perform all work in accordance with all applicable laws, codes and industry standards. Pre-Construction Kick-Off: The contractor will be required to establish a preconstruction kick-off meeting ten (10) working days prior to commencement.
3.1.13. Post Award Kick-Off Meeting: A Post Award Kick-Off Meeting with the successful offeror will be conducted within 15 working days after award of the contract. The meeting will be held at (to be identified at award). The
Contractor shall give at least five working days’ notice prior to the date of the meeting with the RTA. The requirement for a Post Award meeting shall, in no event, constitute grounds for excusable delay by the Contractor in performance of any provisions of the contract.
3.1.13.1. For smaller, single vendor projects, a telephone or email notification may suffice at the discretion of the RTA.
3.1.14. A Period of Performance (PoP) is to be established and presented at the
Post Award Kick-Off Meeting, by the contractor, to ensure availability of the work area and adequate escorting.
3.1.15. Asbestos Abatement (if applicable)
3.1.15.1. Removal of asbestos panels shall be in accordance with Indiana rule 326 Indiana administration code (IAC) and shall be licenses in the state of Indiana.
3.1.15.2. Contractor shall remove and dispose of transit panels in accordance with Federal, State, and local regulations and laws.
3.1.15.3. Contractor shall remove each roof panel in sections taking care not to crumble, pulverize, or reduce to powder. Each panel shall be wrapped with (6) mil thick polyethylene plastic sheeting which shall be properly labeled prior to disposal, including name or waste generator and location at which the waste was generated.
3.1.15.4. Contractor shall coordinate and submit a detailed job plan to the
NAVFAC MW Crane, Asbestos Program Manager via the Contracting
Officer for approval prior to demolition.
3.2. Tasking
3.2.1. Mechanical Requirements:
3.2.1.1. 3 pieces of equipment will need vented to the exterior. This lab is open secret so any vent 96in2 or above in size will need to have security grates installed.
3.2.1.2. Need two (2) each 2.5” diameter vents vented to the exterior of the building from the below customer supplied equipment:
3.2.1.3. Small Ovens – 2 Each
3.2.1.4. Need 1 each 10” diameter vent vented to the exterior of the building from the below customer supplied equipment:
3.2.1.5. Fume Hood
3.2.1.6. This duct needs to be a thermoplastic duct. One (1) each 10’ length 10” diameter pipe along with two (2) each 90 degree elbows will come with the equipment. Galvanized steel could corrode due to the chemicals used inside this fume hood.
3.2.2.
4. Technical Data Deliverables – Contract Document Requirements List
(CDRL)
CDRL A001 Accident Incident Report ASREQ
CDRL A002 Damage Report ASREQ
5. Compliancy Review Notes
5.1.NSWC Space Management
5.1.1. May require Space Request (by POC to NSWC 1021 Space & Strategy)
6. Funding Information
6.1. Funding type: Code- Indirect
7. Schedule Constraints
7.1. Requested Award: ##/##/####.
7.2. Requested Project Completion: ##/##/####. Note: XXXXX N/A
7.3. Site Availability: ##/##/####. Restrictions: Coordinate with POC.
7.4. Potential Approvals Required:
Yes No Unknown Notes
DD1391 X (i.e. Project is $1.6M, will require
1391)
Non-Safety Site
Approval (NSSA)
X (i.e. New building, or changing overall footprint, will require
NSSA)
Explosive Safety Site
Approval (ESSA)
X (i.e. Changing explosive use, building is within arc, Lightening
Protection System)
Radiological Affairs
Support Office
(RASO)
X (i.e. Equipment or project involves
Radiological material will require
RASO coordination)
DD1354 X (i.e. Project involves improvements or repairs to real property, coordinate with Real Property
Officer)
Work Permit X (i.e. Project is being executed via
233 Authority via USACE/1022, requires work permit)
Environmental X (i.e. Project requires tree clearing)
Attachments
7.1.1 Floor Plan – General Exhaust Area Located Above.