STATEMENT OF WORK.pdf
PDF 91 KB Posted
- Attached to
- SOLID WASTE LANDFILL SERVICES - FCI LA TUNA
- Solicitation number
- 15BGCS26N00000010
About this file
This Statement of Work (SOW) details solid waste landfill services for the Federal Bureau of Prisons (FBOP) at the Federal Correctional Institution (FCI) La Tuna in Anthony, TX. The contract is an Indefinite Delivery/Requirements type with firm-fixed prices, seeking a contractor to manage waste disposal services within a 35-mile radius of the institution. The government estimates delivering 2,546 tons of waste annually, including institutional waste, construction debris, wood, and tires, with approximately six loads per week.
Key contract specifications include daily waste removal Monday through Friday between 8:00 a.m. and 4:00 p.m., excluding federal holidays, using a 35-yard compactor, two 30-yard open-top dumpsters, and a 30-yard wood dumpster. The contractor will be responsible for proper disposal and must have a facility approved by the Texas Department of Environment and Natural Resources, complying with all federal, state, and local environmental codes and EPA standards. Pricing will be on a per-ton basis, covering all associated charges and fees, with the contractor required to provide documentation of tonnage for each delivery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Market Research Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SOLID WASTE LANDFILL SERVICES
FEDERAL CORRECTIONAL INSTITUTION (FCI)
LA TUNA, TX
SUBJECT:
The Federal Bureau of Prisons (FBOP), Field Acquisition Office (FAO), intends to make a single award of an Indefinite Delivery/Requirements type contract with firm-fixed prices for Solid Waste Landfill Services, which meet the requirements outlined in this statement of work for the Federal Correctional Institution (FCI), La Tuna, located in Anthony, TX.
PLACE OF PERFORMANCE:
Services will be performed at the contractor’s disposal facility, which must be approved by the Texas Department of Environment and Natural Resources, and operated in accordance with all Federal, State, and Local codes as well as meet EPA Requirements and standards. The disposal facility shall be located within a 35-mile (one-way) radius of the institution, which is located at 8500 Doniphan Dr., Anthony, TX 79821.
METHOD OF PERFORMANCE:
FCI La Tuna will transport a 35-yard compactor delivered about six times a week, along with two 30-yard open top dumpsters and a 30-yard wood dumpster as needed to the contractor’s disposal facility. The waste will consist of institutional waste (including solid and wet waste from the Food Service and other departments), construction debris, wood, and tires. Upon delivery, the contractor shall be responsible for and become sole owner of all trash, garbage, and debris from the Government owned containers once the unloading at the transfer site is complete. The contractor will be fully responsible for the disposal of the materials in a lawful and proper manner. The Government estimates they will deliver 2,546 tons of waste per year of the above materials, with an average of six loads per week. There is no guarantee regarding the estimated tonnage, as quantities will vary on a per delivery, weekly, monthly, and yearly basis. The contractor will be required to provide the Government with documentation of tonnage for each delivery.
SCHEDULE OF PERFORMANCE:
The Government estimates deliveries to the contractor’s disposal facility will occur daily, Monday through Friday, between the hours of 8:00 a.m. to 4:00 p.m. local time, excluding Federal Holidays.
PROGRAM MANAGEMENT:
The Contract Monitor will provide direction to the contractor which clarifies the scope of work, as well as inspection and acceptance services.
ADULT IN CUSTODY (AIC) MANAGEMNT:
The contractor will not be responsible for the management of AICs.
CONTRACT PRICING/SCHEDULE OF ITEMS:
Services are required to be provided by the contractor in accordance with the Statement of Work (SOW). The quoter is required to include a completed copy of the Schedule of Items inclusive of the base year and all options periods, with their quote. The contract rate for these services shall be on a per-ton basis. The contract rate shall include all associated charges and fees on a per ton basis.
File details come from the government source that posted it. Updated .