STATEMENT OF WORK.pdf
PDF 36 KB Posted
- Attached to
- FSS Office Blinds Federal contract opportunity
- Solicitation number
- FA252124R0044
About this file
This document is a Statement of Work (SOW) for replacing the blinds/panels in the NAFAO and IT offices of Building 425 at the 45th Force Support Squadron (45 FSS). The SOW requires the contractor to remove the existing panels and install new ones, with specific dimensions provided for the various office spaces. The work is to be completed within 30 days of contract award and must be coordinated with the Resource Manager. The contractor is responsible for verifying existing dimensions, cleaning up the work area, and protecting the surroundings during the performance period.
The related federal contract opportunity is a Solicitation (FA252124R0044) issued by the Department of the Air Force Space Command for the same requirement to furnish all labor, materials, equipment, and expertise to replace the current blinds/panels in the NAFAO and IT offices of Building 425.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW Office Blinds Rev 2.pdf | ||
| SOW Office Blinds Rev1.pdf | ||
| Photo 3.pdf | ||
| 24R0044 - CSS Final.pdf | ||
| Photo 2.pdf | ||
| Photo 4.pdf | ||
| Photo 6.pdf | ||
| Photo 1.pdf | ||
| Photo 5.pdf | ||
| 24R0044 - Clause List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Blinds/Panels for FSR office space
45 FSS/FSR BLDG 425 2ND FLOOR
DATE 15 AUG 2024
Furnish all labor, materials, equipment, and expertise, required to replace the current blinds/panels that are located in the NAFAO and IT offices of Bldg 425.
1. Remove current panels and take away/dispose. Demolish and removal must be accomplished in one day with all debris/fabric and remnants must be removed from site.
2. Replace panels on all windows for FSR. We have measured windows, but they will need to be remeasured by vendor to ensure accuracy
FSR 14’ 11” x 4’ FSRIT 14’8”x4’ Cashiers Cage 7’3”x4’
14’ 10”x4’ 14’10”x4’ Outside CC 7’3”x4’
14’11”x4’ 14’11”x4’ Breakroom 14’11”x4’
14’10”x4” 14’10”x4’
OM 14’11”x4’ 14’10”x4’
RM 14,11”x4’ 14’11”x4’
RMFC 14’8”x4’
4. The Contractor shall coordinate the planned schedule of work with the Resource Manager.
Contractor will also:
• Verify all existing dimensions and conditions before proceeding with fabrication/install.
• Clean up the work area after each workday.
• Perform work during normal business hours, Mon – Fri, 8:00am to 5:00pm unless otherwise worked out in advance with the Resource Manager.
• Be responsible for protecting existing surroundings as needed.
5. Performance period is 30 days once contract awarded.