This document is a Statement of Work (SOW) for a federal contract opportunity to replace carpet in the second floor hallway of Building 380 at Eglin Air Force Base. The project scope includes removing existing carpet and vinyl base, then installing new carpet squares/tiles and cove base. The Contractor will be responsible for disposing of the old materials. The key details of the federal contract opportunity are:

The solicitation number is FA282324Q0063, issued as a Request for Quote (RFQ) under a 100% Small Business Set-Aside. The NAICS code is 314110 (Carpet and Rug Mills) with a small business size standard of 1,500 employees. Quotes are due by 10:00 AM CST on 11 September 2024. A site visit is scheduled for 28 August 2024. All questions must be submitted by 30 August 2024. The Government intends to award a single firm-fixed price contract.

View the file

Other files

File Type Posted
Questions and Answers for Solicitation.pdf PDF
Solicitation Amendment FA282324Q00630001 SF 30.pdf PDF
Site Visit Scan In_Redacted.pdf PDF
Statement of Work Amendment.pdf PDF
Wage Determination.pdf PDF
Solicitation - FA282324Q0063.pdf PDF
Tier I Carpet Manufacturers POC List.docx DOCX document
Contractor Pricing Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRIRIGA - 14149680

Project Title: Replace Carpet, Second Floor Hallway, Bldg 380 Date: 04/30/2024

STATEMENT OF WORK

1. PURPOSE OF SECTION: The purpose of this section is to provide the Contractor with a Statement of Work for the above mentioned project. The Contractor shall follow the guidelines and Service Summary provided in the PWS of said contract. The Contractor shall seek clarification from the Contracting Officer (CO) if there is any question on the applicability of a provision. These provisions are for the purpose of general information only and are not intended to completely describe the regulations and restrictions that apply on Eglin AFB.

2. PROJECT SCOPE: The project is located on Eglin AFB, Florida. The Contractor shall be required to furnish all materials, equipment, plant, labor and personnel necessary to design, manage, and accomplish this work in accordance with the contract requirements. The Contractor is expected to maintain safety requirements and demonstrate standard construction methods, at all times.

A. Provide everything necessary to remove sheet carpet & vinyl base, then replace with carpet squares/tiles along with new cove base as indicated on the Task Order. Scope is limited to Second Floor within building 380 on Eglin AFB.

B. Contractors shall be responsible for the disposal of the old carpet, vinyl cove base, transition strips and any waste generated by the installation of flooring products.

3. PRINCIPAL FEATURES: Principal features of work are as follows:

A. Civil:

a. None.

B. Architectural:

a. Remove existing cove base, scrape and prep to receive new. (~ 1288 LF)

b. Remove existing transition strips, as required.

c. Remove existing roll/sheet carpet. Do not disturb substrate to ensure a smooth and secure bonding surface. (~ 429 SY)

d. Install new carpet squares, 24”x24” or approved otherwise. Tier 1 Approved

Carpet Vendor (~ 429 SY) See carpet ordering Guide for Contact Information.

e. Install 6” cove base (color will coordinate with carpet tiles) ~ 1288 LF

f. Install matching transition strips where required.

g. All work shall be in accordance with the latest NFPA and NEC requirements to ensure maximum protection against loss of life and property by fire.

h. Design and installation must meet all UFC 3-600-01 and applicable NFPA

Standards.

i. All interior finishes, contents and furnishings must meet NFPA 101 Chapter 10.

C. Mechanical (HVAC):

a. None

D. Electrical

a. None

E. COMMUNICATIONS: (Customer and 96 CS will verify)

a. None.

F. SPECIAL INSTRUCTIONS:

a. This project must be completed in a timely matter with minimal impact. Notify

CO immediately of any impact regarding long lead items, delays or anything that could affect the negotiated schedule and completion date.

b. Customer will provide escorts if needed.

c. The adjacent areas within this facility will be occupied during construction.

d. Ensure adequate ventilation and coordination prior to work generating fumes, dust, debris and vibration, prior to the activity.

e. Provide warranty, certificates of compliance plus maintenance/cleaning instructions, as applicable the COR prior to the invoice being paid.