This document is a Statement of Work for the USDA's requirement to de-energize and warm a 360 MHz NMR magnet to room temperature for disposal. The contractor must discharge the main field, discharge the cryo shims, and open the vacuum space to warm the magnet. The government will provide the work site at the US Dairy Forage Research Center in Madison, WI. The contractor must complete the work by May 24th and provide a service report at the end. Travel and shipping costs are to be included in the service fee. The contractor must have qualified service engineers to perform the work. There are no security requirements or data rights associated with this contract.

The related federal contract opportunity is a Request for Quote (RFQ) issued by the USDA for the NMR 360 MHz Magnet De-Energizing and Warming to Room Temperature requirement. This is a total small business set-aside with a NAICS code of 811210. The government anticipates awarding a firm-fixed price contract on a lowest price technically acceptable basis. Quotes are due by 5:00 PM Eastern on May 8, 2024.

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
Provisions and Clauses.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards Attachment

Project NMR 360 MHz Magnet de-energizing and warming to room temperature

General Information

1.0 Scope of Work

Provide a brief statement of the overall project, including goals and objectives.

The NMR magnet is to be de-energized and the cryo-liquids removed.

2.0 Background

Provide a general description of the requirement, describing the acquisition history (if applicable), the current environment, and the vision of the future of the requirement. If information technology is a factor, provide pertinent technical facts.

The NMR magnet is aged and obsolete. The magnet must be de-energized and warmed safely for disposal.

Contractor Requirements

3.0 Technical Requirements / Tasks

Discharge of main field Discharge of cryo shims Open vacuum space to warm magnet to room temperature

4.0 Government Furnished

List any government-furnished support, data, property or facilities. Describe government responsibility for reviewing and approving reports and final products generated under the contract. If the contractor will require access to government facilities, identify the facility location and specific area. Identify any federal holidays or other times when access may be restricted.

The contractors must come on site to US Dairy Forage Research Center 1925 Linden Dr. Madison WI 53706 room 361D where the NMR magnet resides.

5.0 Deliverables / Schedule

All written deliverables shall be phrased in layperson language.

Service completion by May 24th. A service report due at the end of the service.

6.0 Travel

Identify any travel requirements, locations involved, number of trips (if known), and duration of anticipated travel. Specify responsibility for travel reimbursement, e.g., the contractor or the Government. If the travel will be reimbursed by the Government, discuss the method of reimbursement, e.g., in accordance with Federal/agency travel regulations. State the Government official authorized to approve contractor travel, e.g., the Contracting Officer or Contracting Officer Representative.

Travel costs and shipping costs of service equipment are to be included in the service fee.

7.0 Contractor’s Key Personnel

Describe positions which are considered key to successful performance of the contract and the information required to support key personnel qualifications, e.g., experience which correlates to SOW requirements, education, and past performance on similar projects. Specify if resumes are required and provide resume format if appropriate.

Service engineers able to complete the task.

8.0 Security Requirements

Specify security requirements that apply to the contract performance. Specify the level of clearances required and identify positions that are applicable.

No security requirements.

9.0 Data Rights

If data is to be produced, furnished, acquired, or used in meeting contract requirements, delineate the respective rights and obligations of the government and the contractor regarding the use, production, and disclosure of that data.

No data produced, furnished, acquired or used.

10.0 Section 508 – Electronic and Information Technology Standards When information technology is to be acquired, include language describing Section 508 requirements.

Nothing new acquired.

Attachment If applicable, include an Attachment stating Evaluation Factors and significant Subfactors representing the key areas of importance and emphasis to be considered in the source selection decision.

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment

File details come from the government source that posted it. Updated .