This solicitation requests quotes for the installation of microplot pipes at the USDA Agricultural Research Service in Tifton, Georgia. The solicitation seeks quotes for installing 120 microplot pipes as well as an option to install an additional 180 pipes. Quotes are due by March 11, 2024 and should include pricing for both the base order of 120 pipes and optional additional 180 pipes. Award will be made based on best value considering technical capability, past performance, and price with technical capability and past performance being more important than price. The contract type will be firm-fixed-price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers for 12405B24Q0107.pdf | ||
| Questions and Answers for 12405B24Q0107.docx | DOCX document | |
| Clauses FAC 2024-03 eff. 02-23-24 under $250k (Solicitation).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Project: Microplot Installation
GENERAL INFORMATION
1.0 Scope of Work: We are installing microplots (cut from culvert pipes) to isolate test areas from the surrounding soil. Plots need to be in a row orientation. We will perform a variety of work in these plots including nematode and disease research.
2.0 Background: We need the microplot pipes (36” diameter/24” tall) installed. Each
“row” will be 15 plots long. The plots will be installed in 4 row sections with an 18’ drive row between each 4-row section. We also need underground irrigation installed that ends with an emitter to water each plot. The installation area is in a fallow agricultural field without any overhead structures. We currently have 120 pipes ready for installation, with a total of 300 total needed to complete the project.
The entire plot area needs to be identical in layout and irrigation.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
o 120 culvert pipes will be installed 18” deep, leaving 6” of pipe above ground level.
o Each row will contain 15 plots installed, all spaced 8’ apart from center to center.
o Rows will be spaced 9’ apart from center to center.
o Rows will be in blocks of 4 with a drive row between each block. Each drive row will be approximately 12’ wide.
o A main line will need to be installed from a nearby riser to supply water to each row.
Each irrigation row will need an accessible manual ball valve installed close to the main irrigation line to turn on/off irrigation as needed.
o Each plot will have its own irrigation emitter adequate to water the entire plot, but not over-reaching watering outside of the plot. The emitter and required plumbing must run vertically along the inside edge of the culvert pipe.
o The south end of the main line will need an accessible ball valve installed to act as a low point drain for the entire irrigation system.
4.0 Government Furnished: The microplots will be installed on UGA property in
Tifton, Ga. The irrigation source will be from a deep well already in-service on the property.
5.0 Deliverables / Schedule: The project will need to be completed within 30 days of award of contract.
Attachment: Microplot Map
E A S T
9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9' 9'
15 O O O O O O O O O O O O O O O O O O O O 8'
14 O O O O O O O O O O O O O O O O O O O O 8'
13 O O O O O O O O O O O O O O O O O O O O 8'
12 O O O O O O O O O O O O O O O O O O O O 8'
11 O O O O O O O O O O O O O O O O O O O O 8'
10 O O O O O O O O O O O O O O O O O O O O 8' S
9 O O O O O O O O O O O O O O O O O O O O 8' O
8 O O O O O O O O O O O O O O O O O O O O 8' U
7 O O O O O O O O O O O O O O O O O O O O 8' T
6 O O O O O O O O O O O O O O O O O O O O 8' H
5 O O O O O O O O O O O O O O O O O O O O 8'
4 O O O O O O O O O O O O O O O O O O O O 8'
3 O O O O O O O O O O O O O O O O O O O O 8'
2 O O O O O O O O O O O O O O O O O O O O 8'
1 O O O O O O O O O O O O O O O O O O O O 8'
Yellow Rows Are Drive Rows. No Irrigation or plots installed
| CONTRACTOR REQUIREMENTS |
| 3.0 Technical Requirements/Tasks: |
| o 120 culvert pipes will be installed 18” deep, leaving 6” of pipe above ground level. |
| o Each row will contain 15 plots installed, all spaced 8’ apart from center to center. |
| o Rows will be spaced 9’ apart from center to center. |
| o Rows will be in blocks of 4 with a drive row between each block. Each drive row will be approximately 12’ wide. |
| o A main line will need to be installed from a nearby riser to supply water to each row. Each irrigation row will need an accessible manual ball valve installed close to the main irrigation line to turn on/off irrigation as needed. |
| o Each plot will have its own irrigation emitter adequate to water the entire plot, but not over-reaching watering outside of the plot. The emitter and required plumbing must run vertically along the inside edge of the culvert pipe. |
| o The south end of the main line will need an accessible ball valve installed to act as a low point drain for the entire irrigation system. |