Statement of Work.pdf

PDF 108 KB Posted

Attached to
Z1DA--Correct Water Distribution Deficiencies Legionella 515-18-107
Solicitation number
36C25020B0052
Issued by

About this file

This pre-solicitation announcement and statement of work describe a forthcoming firm fixed price construction contract to correct water distribution deficiencies at the Battle Creek VA Medical Center in Michigan. The project involves general construction and alterations to remove existing structures and correct water distribution issues in several buildings on the campus and off-campus housing. Scope of work includes mechanical, electrical, and interior construction, installation of water treatment systems and monitoring points, replacement of plumbing fixtures, and testing and abatement. The period of performance is 462 calendar days. The solicitation will be issued on June 29, 2020 as a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The estimated value is between $2-5 million. Interested contractors must register in SAM and VetBiz and have a current VETS-4212 report.

View the file

Other files

File Type Posted
Specifications.pdf PDF
Drawings - 2 of 3.pdf PDF
Request For Information Form 515-18-107.pdf PDF
36C25020B0052_1.docx DOCX document
Drawings - 3 of 3.pdf PDF
Wage Determination MI20200079 01-03-2020.pdf PDF
Drawings - 1 of 3.pdf PDF
Contractor EMR Certification Form 2020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Battle Creek

VAMC

Project#: 515-18-107 Project Title: Correct Water Distribution Deficiencies for Legionella

The Contractor shall furnish all labor, material, equipment, supervision, As-Built Documentation, and all other related information for Project 515-18-107, Correct Water Distribution Deficiencies for Legionella, at the VA Medical Center in Battle Creek, Michigan.

The project will include general construction and alterations for necessary removal of existing structures and construction to correct water distribution deficiencies associated with Buildings 3, 14, 22, 39, 82, 83 and 84 on the Battle Creek, Michigan VAMC campus and the off-campus TR Houses located on Michigan Avenue and Capital Avenue. Work shall include but not be limited to:

All labor, material, equipment and supervision to perform the required mechanical and electrical and communications and interior design construction work on this project, including tie-ins, ceiling, wall and floor repair and finishes as necessary. Installation of water treatment systems, along with re-piping and re-insulation where necessary. Installation of continuous temperature, pH and chlorine monitoring points at multiple points in each building. Installation of continuous circulated looped systems for hot water in each building. Replacement of various faucet and shower fixtures. Elimination of unused plumbing fixtures and dead-end piping runs.

Installation of test ports at main locations and various faucets and showers.

Work will require testing and abatement of asbestos containing material, testing and limited removal of lead based paint, coordination with occupied buildings, weekend and/or after-hours work, isolation of the potable water system in certain areas/buildings, work around existing potable water equipment which shall not be taken out of service longer than periods outlined in the specifications, sole source/brand name only purchases, brand name or equal purchases and other requirements not listed above but defined in the construction documents.

Phasing, shift work and weekend work restrictions are part of this contract and are outlined in the specifications for the project. Performance shall be accomplished in phases and at off-hours.

All contractors are required to complete the VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access or Use to VA sensitive Information, A copy of the signed training must be submitted to the COR and uploaded into the VA Talent Management System (TMS).

The contractor will receive a total of 462 days to complete the work.