Drawings - 3 of 3.pdf
PDF 12 MB Posted
- Solicitation number
- 36C25020B0052
About this file
This pre-solicitation announcement is for construction services to correct water distribution deficiencies at multiple buildings on the Battle Creek, Michigan VA Medical Center campus and off-campus therapeutic residence houses. The scope of work includes re-piping, re-insulation, installation of continuous water monitoring points, replacement of fixtures, and elimination of unused plumbing. Additional requirements include testing and abatement of hazardous materials, coordination with occupied facilities, and isolation of potable water systems. The contract will be awarded on a 100% Service-Disabled Veteran-Owned Small Business set-aside basis with a period of performance of 462 calendar days from notice to proceed. The solicitation will be issued on June 29, 2020 on beta.sam.gov for project number 515-18-107 with a total value between $2-5 million. Interested parties should monitor the website for full bid documents and due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications.pdf | ||
| Drawings - 2 of 3.pdf | ||
| Request For Information Form 515-18-107.pdf | ||
| 36C25020B0052_1.docx | DOCX document | |
| Statement of Work.pdf | ||
| Wage Determination MI20200079 01-03-2020.pdf | ||
| Drawings - 1 of 3.pdf | ||
| Contractor EMR Certification Form 2020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STAFF LOUNGE
TOILET
150A
AE102 1
TOILET
110A
LOUNGE
AE102
MED SELECT
AE102
LAUNDRY
212 AE102
18 18
UTILITY
239AAE102
UTILITY
208B
AE102
33 4
5ALIGN
4' - 0"
18 1819
WD
9"
2"
9"
1' - 6"
6"
3 3
21 20
4" 4"
22 22 22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NO. : 2018-05157
VA Project No.515-18-107
FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
/2
/2
:3
:3
P
M
CORRECT WATER
DISTRIBUTION DEFICIENCIES
FOR LEGIONELLA
02/24/2020
ENLARGED PLANS AND ELEVATION
AE102
PQCW
BATTLE CREEK, MICHIGAN
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
BLDG 82 - STAFF LOUNGE 150
SCALE: 1/4" = 1'-0"
BLDG 82 - LOUNGE 110
SCALE: 1/4" = 1'-0"
BLDG 83 - MED SELECT 237
SCALE: 1/4" = 1'-0"
BLDG 83 - LAUNDRY 212
SCALE: 1/4" = 1'-0"
BLDG 84 - UTILITY 239A
SCALE: 1/4" = 1'-0"
BLDG 84 - UTILITY 208B
SCALE: 1/4" = 1'-0"
B82 - 150 ELEVATION
1 SCALE: 1/4" = 1'-0"
B82 - 110 ELEVATION
SCALE: 1/4" = 1'-0"
B83 - 212 ELEVATION
5 SCALE: 1/4" = 1'-0"
B84 - 208B ELEVATION
6 SCALE: 1/4" = 1'-0"
B84 - 239A ELEVATION
G E N E R A L N O T E S
A. CONTRACTOR SHALL PATCH AND PAINT ALL DISTURBED GYPSUM BOARD WALL FINISHES TO
MATCH EXISTING ADJACENT. PROVIDE ACCESS PANELS AT ALL OPENINGS INTO GYPSUM
BOARD CEILINGS AT POINT OF PIPING CONNECTIONS.
B. ALL SPACE DISCREPANCIES SHALL BE REPORTED TO THE ARCHITECT AND COR PRIOR TO
CONSTRUCTION.
C. CONTRACTOR SHALL BE AWARE OF AND AVOID ALL PIPING, MECHANICAL, AND ELECTRICAL
BEHIND WALL FINISH WHEN INSTALLING WATER MONITORING PANELS.
D. CONTRACTOR SHALL VERIFY FINISH AND STRUCTURAL MATERIAL OF WALL AND CEILING PRIOR
TO BID. ADDITIONAL WORK DUE TO A DISCREPANCY IN EXISTING CONSTRUCTION SHALL NOT
BE AT COST TO THE GOVERNMENT.
E. SEE PLUMBING DRAWINGS FOR RECOMMENDED LOCATION OF CONNECTION TO EXISTING
PIPING. PROVIDE PIPING ROUTE TO MINIMIZE DISTURBANCE TO EXISTING FINISHES.
F. SEE SHEET P002 FOR HAZARDOUS MATERIAL ABATEMENT NOTES.
G. CONTRACTOR SHALL PROVIDE STAINLESS STEEL ESCUTCHEON PLATES AT ALL VISIBLE WALL
AND CEILING PENETRATIONS. ESCUTCHEON PLATE INSIDE DIAMETER SHALL MATCH PIPE
INSULATION OUTSIDE DIAMETER.
H. INSTALL WATER MONITORING PANEL PER MANUFACTURER'S INSTRUCTIONS. AT STUD WALL
LOCATIONS, PROVIDE 1/2" FIRE RESISTANT TREATED PLYWOOD (GRADE B OR BETTER) BACK-UP
FOR BLOCKING. SECURE TO EXISTING STUDS. PAINT PLYWOOD TO MATCH ADJACENT WALL
FINISH COLOR. AT CMU OR CONCRETE WALL, PROVIDE CONCRETE ANCHORS AT MOUNTING
POINTS.
I. PIPING LOCATIONS SHOWN FROM WATER MONITORING ENCLOSURE IS SCHEMATIC TO
ILLUSTRATE PROPOSED DIRECTION TOWARDS CONNECTION TO EXISTING. CONTRACTOR
SHALL CONFIRM LOCATIONS PRIOR TO CONSTRUCTION.
J. ABAAS REQUIREMENTS FOR REACH RANGES SHALL NOT BE REQUIRED FOR THIS PROJECT PER
ABAAS SECTION F203 GENERAL EXCEPTIONS.
K. SEE PLUMBING DRAWINGS FOR WATER MONITORING PANEL EQUIPMENT TAGS AND
SCHEDULES.
D R A W I N G N O T E S
1 EXISTING CASEWORK TO REMAIN.
2 EXISTING REFRIGERATOR TO REMAIN.
3 EXISTING TRASH CANS TO REMAIN.
4 RELOCATE EXISTING MAIL SLOT CASEWORK TO BE CENTERED ON WALL AS SHOWN.
5 EXISTING WINDOW TO REMAIN.
6 DUAL COLD AND HOT WATER MONITORING STATION IN ENCLOSURE - MOUNT TO WALL AS
DIMENSIONED.
7 COLD WATER MONITORING STATION IN ENCLOSURE - MOUNT TO WALL AS DIMENSIONED.
8 EXISTING CLINICAL SERVICE SINK TO REMAIN.
9 PROVIDE BLANK STAINLESS STEEL COVER PLATE FOR NURSE CALL PULL STATION.
EXISTING WIRING TO REMAIN.
10 EXISTING STEEL COVER PLATE TO REMAIN - UTILIZE EXISTING OPENING AT THIS LOCATION
FOR ROUTING OF WATER PIPES TO MONITORING STATION.
11 EXISTING 6X6 WALL TILE TO REMAIN - REPLACE ANY TILE DAMAGED DURING
CONSTRUCTION NEW TILE TO MATCH EXISTING ADJACENT.
12 EXISTING HOSE BIBB AND FOOT PEDAL SPRAYER TO REMAIN.
13 EXISTING PIPING TO REMAIN.
14 EXISTING HOSE BIBB TO REMAIN.
15 EXISTING FURNITURE TO REMAIN IN ROOM - RELOCATE AS SHOWN.
16 REMOVE EXISTING BULLETIN BOARD AND TURN OVER TO VA.
17 EXISTING COUNTER TOP TO REMAIN.
18 EXISTING WASHER AND DRYER TO REMAIN. VERIFY SIZE OF UNITS PRIOR TO
CONSTRUCTION. ALL CLEARANCES TO NEW EQUIPMENT SHALL BE MAINTAINED TO
ENSURE FUNCTION OF WASHER AND DRYER.
19 EXISTING UTILITY SINK TO REMAIN.
20 PREFERRED LOCATION OF COLD WATER MONITORING STATION IN ENCLOSURE - MOUNT
TO WALL AS DIMENSIONED - CONFIRM LOCATION OF PANEL WITH C.O.R. PRIOR TO
INSTALLATION.
21 SECONDARY LOCATION OF COLD WATER MONITORING STATION IN ENCLOSURE - MOUNT
TO WALL AS DIMENSIONED - CONFIRM LOCATION OF PANEL WITH C.O.R. PRIOR TO
INSTALLATION.
22 EXISTING EQUIPMENT TO REMAIN.
SCALE: 1/4" = 1'-0"
B82 - 110 ELEVATION 2
TILE ON CMU WALLTILE ON CMU WALLGYP BD ON METAL STUD WALLGYP BD ON METAL STUD WALL
GYP BD ON METAL STUD WALL GYP BD ON METAL STUD WALL GYP BD ON METAL STUD WALL
A.C.T. CEILING
VCT FLOORING
A.C.T. CEILING
VCT FLOORING
GYP CEILING
TILE FLOORING
GYP CEILING
TILE FLOORING
A.C.T. CEILING
VINYL FLOORING
A.C.T. CEILING
VINYL FLOORING
SCALE: 1/4" = 1'-0"
B83 - 237 ELEVATION
Revisions: Date:
A1
P1 P1OR
A1
OH
P2
B
P2
GENERAL FLOOR PLAN NOTES
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
FIRE SUPPRESSION HAZARD CLASSIFICATION AND HAZARD
CLASSIFICATION GROUP
SECTION: 1 = SECTION DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER
TO SCHEDULES.
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER
DESIGNATIONS REFER TO SCHEDULES.
CONNECT TO EXISTING
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN
UNLESS NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
10" 10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOE: 3' - 0"
BOE: 0' - 6"
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR
BOTTOM OF EQUIPMENT, UNLESS NOTED OTHERWISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO
CENTERLINE OF PIPE, UNLESS NOTED OTHERWISE
FIRE SUPPRESSION SYMBOLS
CONCEALED PENDENT SPRINKLER
FS
PIV
S
FIRE HYDRANT
FLOW SWITCH
GATE VALVE OS&Y
INSTITUTIONAL PENDENT SPRINKLER
PENDENT SPRINKLER
POST INDICATOR VALVE
RECESSED PENDENT SPRINKLER
SIDE WALL SPRINKLER
SUPERVISED VALVE
UPRIGHT SPRINKLER
PIPING SYMBOLS
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE: BULLHEAD TEE'S ARE NOT
PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
D
R
SPECIALTY GAS SYMBOLS
AIR OUTLET - LAB TYPE
VC
VC
CARBON DIOXIDE OUTLET - HOSPITAL TYPE
MEDICAL AIR OUTLET - HOSPITAL TYPE
MEDICAL VACUUM INLET - HOSPITAL TYPE
NITROGEN OUTLET - HOSPITAL TYPE
NITROUS OXIDE OUTLET - HOSPITAL TYPE
OXYGEN OUTLET - HOSPITAL TYPE
WAGD INLET - HOSPITAL TYPE
NATURAL GAS OUTLET - LAB TYPE
VACUUM OUTLET - LAB TYPE
VACUUM CLEANING STATION - WALL
VACUUM CLEANING STATION - FLOOR
PLUMBING AND FIRE SUPPRESSION
PIPING DESIGNATIONS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
HOT WATER PIPE (140 DEGS. F.)
HOT WATER PIPE (180 DEGS. F.)
HOT WATER RETURN PIPE (140 DEGS. F.)
HOT WATER RETURN PIPE (180 DEGS. F.)
ARGON PIPE
COMPRESSED AIR PIPE
MEDICAL CARBON DIOXIDE PIPE
COMBINATION FIRE SUPPRESSION AND DOMESTIC
WATER SERVICE
DIESEL FUEL PIPE
SPRINKLER PIPE (DRY)
FIRE SUPPRESSION (STANDPIPE / SPRINKLER MAIN)
FIRE SERVICE
FUEL OIL FLOW LINE
FUEL OIL GAUGE LINE
FUEL OIL RETURN LINE
FUEL OIL SUPPLY LINE
NATURAL GAS PIPE
GARAGE DRAINAGE PIPE
GAS SERVICE
HYDROGEN PIPE
HELIUM PIPE
MEDICAL INSTRUMENT AIR PIPE
KITCHEN WASTE PIPE
LABORATORY COMPRESSED AIR PIPE
LABORATORY VENT PIPE
LABORATORY VACUUM PIPE
LABORATORY WASTE PIPE
MEDICAL NITROGEN PIPE
MEDICAL COMPRESSED AIR PIPE
MEDICAL-SURGICAL VACUUM PIPE
GASOLINE PIPE (NON-LEAD)
MEDICAL NITROUS OXIDE PIPE
NON-POTABLE
MEDICAL OXYGEN PIPE
(OVERFLOW) SECONDARY STORM DRAINAGE PIPE
PROPANE GAS PIPE
PUMP DISCHARGE PIPE
PRE-ACTION / DELUGE SPRINKLER PIPE
PURE WATER PIPE
SPRINKLER PIPE (WET)
SANITARY DRAINAGE PIPE
SOFT COLD WATER
SPRINKLER DRAIN PIPE
STORM DRAINAGE PIPE
FUEL TANK VENT PIPE
TRAP PRIMER DISCHARGE PIPE
TEMPERED WATER PIPE
SANITARY SEWER VENT
WASTE ANESTHESIA GAS DISPOSAL PIPE
WATER SERVICE
LV
140R
180R
AR
CA
CO2
CWS
DF
DS
F
FS
FOF
FOG
FOR
FOS
G
GD
GS
H2
HE
IA
IV
IW
LA
LV
LW
N2
MA
MV
NG
NO
NPW
O2
OD
P
PD
PS
PW
S
SAN
SCW
SD
STM
T
TP
TW
V
WAGD
WS
INDIRECT VENT PIPE
INDIRECT WASTE PIPE
K
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS
FOR REQUIRED TYPE BASED ON APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
UNION
CLEANOUT
STRAINER
STRAINER WITH A BLOW DOWN VALVE AND
HOSE CONNECTION
DRAIN VALVE WITH HOSE END CONNECTION
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG
IN AND OUT
EXPANSION JOINT
PRESSURE REGULATING VALVE
SAFETY RELIEF VALVE. PIPE DISCHARGE AIR
GAPPED TO FLOOR DRAIN UNLESS NOTED
OTHERWISE.
PRESSURE AND TEMPERATURE TEST PLUG
TRAP PRIMER
VACUUM GAUGE WITH STOP
CLEANOUT TO GRADE OR FINISHED FLOOR
END CAP
MIXING FAUCET
PLUG
HOSE BIB
WALL HYDRANT
PLUG VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
V
VB
TP
CO
COMBINATION SHUTOFF AND BALANCING
VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
BALL VALVE, BUTTERFLY VALVE, GATE VALVE
VALVES AND FITTINGS
SOLENOID VALVE
S
P/T PRESSURE AND TEMPERATURE SAFETY RELIEF
VALVE. PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERWISE.
FIRE DEPARTMENT VALVE
WATER METERM
ACID VENT PIPEAV
ACID WASTE PIPEAW
ABBREVIATIONS
AAP - AREA ALARM PANEL (MEDICAL GAS)
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACC - ACCESS
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
AR - AIR RECEIVER OR ARGON
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
AV - ACID VENT
AW - ACID WASTE
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BT - BATHTUB
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
BTWN - BETWEEN
CA - COMPRESSED AIR
CB - CATCH BASIN
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CFS - COLD FORM STEEL
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CI - CAST IRON
CK - CLINICAL SINK
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - MEDICAL CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
COR - CONTRACTING OFFICER'S REPRESENTATIVE
CORR - CORRIDOR
CS - CLINICAL SINK OR COLD SOFT WATER
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWS - COMBINATION WATER SERVICE
OR CONDENSER WATER SUPPLY
CWR - CONDENSER WATER RETURN
D - DEPTH OR DRAIN LINE
DD - DECK DRAIN
DET - DETAIL
DF - DRINKING FOUNTAIN OR WATER COOLER
OR DIESEL FUEL
DFU - DRAINAGE FIXTURE UNIT
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DS - DOWN SPOUT OR SPRINKLER (DRY)
DT - PERFORATED DRAIN TILE
DWG - DRAWING
EA - EACH
EC - ELECTRICAL CONTRACTOR (DIVISION 26)
EEW - EMERGENCY EYE WASH
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQ - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
ES - EMERGENCY SHOWER
EQS - EQUIPMENT SUPPLIER
EWC - ELECTRICAL WATER COOLER
EXH - EXHAUST AIR
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
F - FIRE CONTROL EQUIPMENT
FC - FLOW CONTROLLER
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FDC - FIRE DEPARTMENT CONNECTION
FDV - FIRE DEPARTMENT VALVE
FF - FIRE HOSE CABINET
FLR - FLOOR
FM - FORCE MAIN
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FR - FIRE RISER
FS - FLOOR SINK OR FIRE SERVICE
FSC - FIRE SUPPRESSION CONTRACTOR
(DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GD - GARAGE DRAINAGE
GPM - GALLONS PER MINUTE
GS - GAS SERVICE
GW - GREASE WASTE
H2 - HYDROGEN
HB - HOSE BIBB
HC - HVAC CONTRACTOR (DIVISION 23)
HD - HUB DRAIN
HE - HELIUM
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER OR HIGH POINT
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HPW - HIGH PURITY WATER
HPWR - HIGH PURITY WATER RETURN
HR - HOSE REEL
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR
CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
IA - MEDICAL INSTRUMENT AIR
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
IV - INDIRECT VENT
IW - INDIRECT WASTE
JS - JANITOR SINK
K - KITCHEN WASTE
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LA - LABORATORY COMPRESSED AIR
LAV - LAVATORY
LBS - POUNDS
LCW - LABORATORY COLD WATER
LEC - LABORATORY EQUIPMENT CONTRACTOR
LHW - LABORATORY HOT WATER
LHWR - LABORATORY HOT WATER RETURN
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LV - LABORATORY WASTE
MA - MEDICAL COMPRESSED AIR
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MB - MOP BASIN
MC - MECHANICAL CONTRACTOR (DIVISION 23)
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
MV - MEDICAL SURGICAL VACUUM
N2 - MEDICAL NITROGEN
N/C - NORMALLY CLOSED
NG - GASOLINE (NON-LEAD)
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NO - MEDICAL NITROUS OXIDE
NOM - NOMINAL
NPW - NON-POTABLE WATER
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
02 - MEDICAL OXYGEN
OA - OUTDOOR AIR
OD - OUTSIDE DIAMETER OR OVERFLOW
DRAIN
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING CONTRACTOR (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PD - PUMP DISCHARGE OR PARAPET DRAIN
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PS - PRE-ACTION/DELUGE SPRINKLER
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSV - PRESSURE SUSTAINING VALVE
PSIG - POUNDS PER SQUARE INCH GAUGE
PW - PURE WATER
RA - RETURN AIR
RAD - RADIUS
RCP - REINFORCED CONCRETE PIPE
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
RV - RELIEF VALVE
S - SPRINKLER (WET)
SA - SHOCK ARRESTOR OR SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SD - SPRINKLER DRAIN OR SUBSOIL DRAIN
SH - SHOWER
SHT - SHEET
SK - SINK
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SS - SANITARY STACK (SOIL OR WASTE) OR
STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
T - FUEL TANK VENT
TD - TRENCH DRAIN
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TF - TRAP FILLER
TP - TRAP PRIMER OR TRAP PRIMER
DISCHARGE
TW - TEMPERED WATER
TYP - TYPICAL
UR - URINAL
UNO - UNLESS NOTED OTHERWISE
V - VENT OR SANITARY SEWER VENT
VAC - VACUUM
VC - VACUUM CLEANING
VCV - VACUUM CLEANING VALVE
VE - VACUUM EXHAUST
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
VP - VACUUM PUMP
VS - VENT STACK
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/0 - WITHOUT
W - WASTE
WAGD - WASTE ANESTHESIA GAS DISPOSAL
WC - WATER CLOSET
WCO - WALL CLEANOUT
WH - WALL HYDRANT OR WATER HEATER
WIV - WALL INDICATOR VALVE
WS - WATER SERVICE
YCO - YARD CLEANOUT
ZVC - ZONE VALVE CABINET
PIPE RISER
NOTE:
ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT
TO MODIFICATIONS ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT
NECESSARILY BE USED ON THIS PROJECT.
1 HR. ENCLOSURE
2 HR. ENCLOSURE
SMOKE BARRIER
SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NO. : 2018-05157
VA Project No.515-18-107
FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
/2
/2
:3
:3
P
M
CORRECT WATER
DISTRIBUTION DEFICIENCIES
FOR LEGIONELLA
02/24/2020
LEGENDS AND ABBREVIATIONS
P001
KGPDP
BATTLE CREEK, MICHIGAN
100% BID DOCUMENTS
m m
M
A X
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1
- SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43
- SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[11/4]
[7]
[7]
[11/2]
[9]
[8]
[2]
[10]
[8]
[21/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTE:
SEE SPECS FOR DETAILED HANGER
REQUIREMENTS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(200mm [8"] MIN.)
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRICTION THIS TYPE SHALL BE USED ONLY
IN SLABS OR BEAMS OF 4" [100mm] MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS FOR
NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA INSERTS
NEW CONSTRUCTION ONLY.
SEQUENCE OF CONSTRUCTION FOR DEAD END REMOVAL
GENERAL NOTES:
A CONTRACTOR SHALL THOROUGHLY STUDY DESIGN DRAWINGS AND
ALL EXISTING CONDITIONS PRIOR TO STARTING PROPOSED
SCHEDULE.
B PHASING INDICATED BELOW IS ONE POSSIBLE SOLUTION TO MINIMIZE
DOWNTIME OF THE BUILDING PLUMBING SYSTEM. CONTRACTOR IS
REQUIRED TO SUBMIT A DETAILED SEQUENCE OF CONSTRUCTION/
PHASING NARRATIVE TO THE COR AT THE BEGINNING OF THE
PROJECT INDICATING DOMESTIC WATER OUTAGES/ DURATION,
SWITCH OVER DATES, AND PROJECT MILESTONES. PHASING PLAN
SHALL ALSO IDENTIFY PARTITIONS/FINISHES PROPOSED FOR
DISTURBANCE. DEVIATIONS FROM THE PROPOSED SEQUENCE OF
CONSTRUCTION WILL BE REVIEWED, BUT WILL NOT BE GROUNDS FOR
ADDITIONAL COST TO THE GOVERNMENT.
C ALL DOMESTIC WATER SWITCHOVER WORK REQUIRING BUILDING
PLUMBING SYSTEM OUTAGES AND/OR DOWNTIME SHALL BE
PERFORMED OUTSIDE OF NORMAL WORKING HOURS, OUTAGES OF
ALL TYPES SHALL BE AS MINIMAL AS POSSIBLE.
D THE PHASE DESCRIPTIONS INDICATE A GENERAL FLOW OF WORK
AND ARE NOT INTENDED TO CONVEY INSTRUCTIONS FOR EVERY
ASPECT OF THE CONSTRUCTION PROJECT.
E PROVIDE COORDINATION DRAWINGS FOR ALL NEW EQUIPMENT
AND PIPING WITH PATHWAYS VERIFIED IN THE FIELD AND
SIGNED-OFF BY THE CONTRACTOR.
F STATION CONSISTS OF A FULLY FUNCTIONAL HOSPITAL/ HEALTHCARE
FACILITY WITH MEDICAL, RESIDENTIAL, INPATIENT MENTAL HEALTH
AND COMMUNITY LIVING CENTERS, ETC. INCLUDE LABOR AND
MATERIAL TO ACCOMMODATE ACCESS REQUIRED FOR WORK IN
THESE VARIOUS SPACES. EXTENSIVE COORDINATION MUST OCCUR
TO MINIMIZE DISRUPTION AS MUCH AS POSSIBLE.
G 21 DAYS BEFORE ANY SYSTEM OUTAGE/ DOWNTIME, CONTRACTOR
SHALL SET-UP A MEETING WITH COR AND DEPARTMENT MANAGERS
TO REVIEW SPECIFIC AREAS OF OUTAGE, OUTAGE START AND END
TIME. EACH DEPARTMENT MUST BE BRIEFLY SURVEYED TO
DETERMINE OVERALL IMPACT OF OUTAGE AND EXPLAINED TO COR
AND MANAGERS.
H DEAD-END REMOVAL WORK AND MONITORING STATION INSTALLATION
WORK REQUIRING BUILDING PLUMBING SYSTEM OUTAGES AND/ OR
DOWNTIME SHALL BE PERFORMED OUTSIDE OF NORMAL WORKING
HOURS. OUTAGE/ DOWNTIME SHALL BE AS MINIMAL AS POSSIBLE.
1 TEST REVISED PIPING IN ITS ENTIRETY OR IN SECTIONS IN CONFORMANCE
WITH SPECIFICATION SECTION 22 11 00, PRIOR TO APPLICATION OF
NEW INSULATION OR CONCEALMENT OF PIPING.
a) ENSURE THAT AIR IS VENTED FROM PIPING WHEN PIPING IS
HYDROSTATICALLY TESTED.
b) FURNISH A WRITTEN RECORD OF EACH PIPING SYSTEM TEST
INDICATING DATE, SYSTEM, PRESSURE, DURATION, AND RESULTS
OF TEST.
c) LEAKS DISCOVERED DURING TESTING SHALL NOT BE PATCHED.
THREADED CONNECTIONS SHALL BE EITHER TIGHTENED OR
REPLACED.
2 KEEP NEW PIPING SYSTEM(S) ISOLATED FROM THE EXISTING SYSTEM
UNTIL AFTER DISINFECTION IS COMPLETED AND PROVEN ACCEPTABLE
BY BACTERIOLOGICAL TEST RESULTS.
a) PROVIDE A SERVICE COCK AT THE POINT OF ISOLATION FOR
INJECTION OF THE DISINFECTION AGENT.
b) THOROUGHLY FLUSH THE SYSTEM PRIOR TO DISINFECTION.
c) DISINFECTION SHALL BE PERFORMED IN ACCORDANCE WITH AWWA
C651 AND SPECIFICATION SECTION 22 11 00.
d) DISINFECTION SHALL BE BY MEANS OF A CHLORINE SOLUTION
INJECTED INTO THE WATER SYSTEM.
e) EACH DOWNSTREAM OUTLET SHALL BE TESTED TO PROVE
PRESENCE OF MINIMUM CHLORINE CONCENTRATION.
f) DOCUMENT THAT ADEQUATE LEVELS OF CHLORINE ARE PRESENT
IN ALL PARTS OF THE SYSTEM BEING DISINFECTED.
g) FOLLOWING THE APPROPRIATE RETENTION PERIOD, FLUSH OUT
THE SYSTEM WITH CLEAN WATER UNTIL THE RESIDUAL FREE
CHLORINE CONTENT IS EQUAL TO THE LEVEL OF INCOMING WATER,
BUT NOT GREATER THAN 1.5 PARTS PER MILLION.
h) PERFORM A BACTERIOLOGICAL ANALYSIS OF THE POTABLE WATER
SYSTEM. ONE TEST SAMPLE SHALL BE COLLECTED FROM THE END
OF THE REVISED MAIN/ BRANCH AND ONE FROM EACH BRANCH.
PROVIDE CERTIFICATION STATING THE NAME OF THE LAB
PERFORMING THE TESTING, THE JOB NAME, THE DATE OF THE
SAMPLES, AND RESULTS OF THE TESTING.
i) DISINFECTION PROCEDURES SHALL BE WITNESSED OR APPROVED BY
THE COR. CONTRACTOR SHALL PROVIDE COR A COPY OF THE
BACTERIOLOGICAL ANALYSIS REPORT.
DISINFECTION AND TESTING:DEAD-END REMOVAL:
1 THE CONTRACTOR SHALL SURVEY ALL EXISTING PIPING DEAD-ENDS TO BE
REMOVED TO DETERMINE EXACT LOCATION. SIZE AND SPACE AVAILABLE
FOR REMOVAL AND REPLACEMENT WORK, AND ENSURE EXISTING
DEAD-END CAN BE COMPLETELY REMOVED, INCLUDING TEE/ FITTING AT
MAIN, AND REPLACED WITH NEW PIPE NIPPLE/ COUPLING/ FITTING.
2 PIPING CONTAINING DEAD-ENDS SHALL BE ISOLATED AND DRAINED TO
ACCOMMODATE REMOVAL AND NEW WORK.
3 PRIMARY REMOVAL PROCESS: DEAD-END PIPING SHALL BE REMOVED
COMPLETELY BACK TO ACTIVE MAIN/ BRANCH, INCLUDING TEE/FITTING
CONNECTING IT TO WATER SUPPLY PIPING.
CONTINGENCY REMOVAL PROCESS: IF DEAD-END CANNOT BE REMOVED VIA
THE PRIMARY REMOVAL PROCESS, A WRITTEN EXPLANATION, AND REQUEST
TO UTILIZE CONTINGENCY REMOVAL PROCESS SHALL BE SUBMITTED TO
COR FOR APPROVAL ON AN INDIVIDUAL BASIS. IF APPROVED, CONTRACTOR
SHALL REMOVE DEAD-END BACK TO WITHIN TWO (2) PIPE DIAMETERS FROM
THE BRANCH, RISER, OR MAIN IT IS CONNECTED TO, AND CAP.
4 NEW PIPE NIPPLE/ COUPLING/ FITTING SHALL BE INSTALLED ON
MAIN/ BRANCH. MAKE PROVISIONS FOR TESTING AND STERILIZING PIPING
AFFECTED BY REVISION WORK. INSTALLATION WORK SHALL CONFORM TO
SPECIFICATION SECTION 22 11 00-3.1.
5 DEAD-ENDS WITHIN WALLS MAY BE ABANDONED ONCE DISCONNECTED
FROM MAINS IF REMOVAL OF PIPING REQUIRES SIGNIFICANT CONSTRUCTION
WITHIN OTHERWISE UNDISTURBED AREAS. DISCONNECTED PIPES TO BE
ABANDONED MUST BE REVIEWED AND APPROVED BY THE COR.
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL REMAINING
ABANDONED AND IN-SERVICE PIPE IS ADEQUATELY SUPPORTED.
*DIP CHLORINATION IS ACCEPTABLE AT EACH LOCATION OF DEAD-END
REMOVAL, HOWEVER, UPON COMPLETION OF AN ENTIRE FLOOR, THE
DCW AND DHW PIPING SYSTEM SHALL BE STERILIZED IN ITS ENTIRETY
UTILIZING THE PROCEDURE DETAILED ON THIS SHEET:
DEAD-END
DEAD-END
MAIN/ BRANCH
MAIN/ BRANCHPRIMARY DEAD-END
REMOVAL STRATEGY
EXISTING PIPING
WITH DEAD-ENDS
CONTINGENCY DEAD-END
REMOVAL STRATEGY
CHECK VALVE FLOW CONTROLLER
BALL VALVE
GENERAL NOTES
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL
CONTRACTORS AND / OR SUBCONTRACTORS THAT WORK WITHIN THIS
BUILDING.
1. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO
BECOME FAMILIAR WITH THE EXISTING CONDITIONS. THESE
DEMOLITION SHEETS SHALL SERVE TO AID THE CONTRACTOR IN THE
EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
2. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR
TO REMOVAL, TO ENSURE SUCH REMOVAL DOES NOT DEACTIVATE
ACTIVE PLUMBING FIXTURES OF THE EXISTING BUILDING. IF THE
INSPECTION INDICATES THAT ACTIVE PLUMBING FIXTURES MAY BE
COMPROMISED, NOTIFY THE CONTRACTING OFFICER
REPRESENTATIVE (COR) IMMEDIATELY.
3. CONTRACTORS SHALL COORDINATE ALL UTILITY SHUTDOWNS AND
INTERRUPTIONS WITH THE COR TWO (2) WEEKS PRIOR TO
SHUTDOWN.
4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK
WITH ALL SUB-CONTRACTORS.
5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS
OF ALL MATERIALS AND EQUIPMENT WITH COR PRIOR TO BEGINNING
OF CONSTRUCTION.
6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL
BE KEPT CLEAN BY THE CONTRACTOR - DAILY.
7. ALL CONTRACTORS TO PROTECT EXISTING EQUIPMENT, SYSTEMS,
FINISHES, AND BUILDING COMPONENTS FROM DEMOLITION DEBRIS
AND EQUIPMENT.
8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT IN THE
AREA OF WORK AND ON THE SITE AT THE COMPLETION OF ALL
DEMOLITION WORK.
9. DIMENSIONS ARE TO EDGE OF WALL OR TO FACE OF WALL UNLESS
NOTED OTHERWISE. BUILDING DIMENSIONS ARE APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO
BEGINNING OF CONSTRUCTION.
10. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES
CAUSED BY THEM DURING THE CONSTRUCTION PROCESS. IN THE
EVENT OF ANY DAMAGES CONTRACTOR IS TO CONTACT COR
IMMEDIATELY; PRIOR TO THE END OF THE DAY OF CONSTRUCTION.
11. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF
EXISTING AND DEMOLISHED EQUIPMENT AND MATERIALS WITH THE
COR PRIOR TO THE START OF CONSTRUCTION.
12. ABATEMENT OF EXISTING HAZARDOUS MATERIALS (ASBESTOS,
LEAD) IS REQUIRED. SEE NOTES ON THIS SHEET FOR DIRECTION.
13. CONTRACTOR SHALL IMMEDIATELY INFORM THE COR IN THE EVENT
THAT MATERIALS OBSERVED ARE SUSPECTED TO CONTAIN
ASBESTOS.
14. INDIVIDUAL FIXTURE TAKEOFFS FROM PIPING ARE NOT SHOWN DUE
TO BEING HIDDEN WITHIN CONSTRUCTION. VERTICAL RUNS OF
PIPING SHOWN ON THE ISOMETRICS REPRESENT PIPING BETWEEN
FLOORS OR PIPING ENTERING WALLS NEAR FIXTURES. THESE
VERTICAL RUNS MIGHT FEED FROM PIPING SHOWN ON OTHER
SHEETS.
15. WORK REQUIRES REMOVAL OF PIPE THAT PENETRATES WALLS AND
FLOORS OF VARIOUS FINISHES AND FIRE RATINGS. THE
CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL HOLES CREATED
AS A PART OF WORK TO MATCH EXISTING APPEARANCE OR AS
NOTED OTHERWISE. REPAIRS SHALL MAINTAIN SOUND SEPARATION
AND INDICATED FIRE RATING.
16. CONTRACTOR SHALL LIMIT DISTURBANCE TO EXISTING FINISHES.
PATCH DISTURBED FINISHES SHALL MATCH EXISTING ADJACENT
SURFACES.
17. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THAT UTILITY
SHUTDOWNS DO NOT CAUSE DAMAGE OPERATING PLUMBING OR
HVAC SYSTEMS.
18. CONTRACTOR IS RESPONSIBLE FOR INVESTIGATION OF EXISTING
CONDITIONS TO DETERMINE APPROPRIATE VALVING FOR WATER
SYSTEM SHUT DOWNS. OPERATION OF VALVING IN CAMPUS WATER
DISTRIBUTION LOOP IS REQUIRED. VALVING AND OUTAGES SHALL BE
COORDINATED WITH COR.
19. CONTRACTOR SHALL PROVIDE STAINLESS STEEL COVER PLATES AT
ALL PLUMBING PENETRATIONS AND WALL APPURTENANCES
SCHEDULED TO BE REMOVED.
20. ALL DISTURBED FINISHES SHALL BE REPAIRED TO MATCH EXISTING
ADJACENT FINISH.
21. PROVIDE OFFSETS AS NECESSARY TO COMPLETE SYSTEMS AND
COORDINATE WORK WITH OTHER TRADES.
22. PROVIDE ACCESS PANELS IN NON-ACCESSIBLE SUSPENDED
CEILINGS FOR VALES, CLEANOUTS, CONTROLS, ETC.
ASBESTOS ABATEMENT:
ASBESTOS-CONTAINING MATERIALS (ACM) ARE PRESENT WITHIN
VARIOUS PROJECT AREAS. SEE SPECIFICATION 02 82 11 FOR EXTENT OF
WORK. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
ABATEMENT OF ACM IN RENOVATION AREAS. COORDINATE WITH COR.
LEAD PAINT:
LEAD-CONTAINING PAINT MUST BE ASSUMED ON ALL PAINTED
SURFACES. CONTRACTOR IS RESPONSIBLE FOR ADDRESSING ALL
PAINTS AS CONTAINING LEAD PER THE APPROPRIATE SPECIFICATION
SECTION: 02 83 33.13 FOR LEAD PAINT REMOVAL AND DISPOSAL,
SECTION 02 41 00 FOR DEMOLITION DISTURBING LEAD PAINT, AND
SECTION 09 091 00 FOR SURFACE PREPARATION DISTURBING LEAD
PAINT.
HAZARDOUS MATERIALS
THERAPEUTIC RESIDENCE (TR)
HOUSES
TWO (2) TR HOUSES ARE INCLUDED IN THE SCOPE OF THIS PROJECT.
THESE HOUSES ARE NOT ON THE BATTLE CREEK VA MEDICAL CENTER
CAMPUS. TR HOUSES ARE LOCATED AT:
1631 W MICHIGAN AVE
BATTLE CREEK, MI 49037
560 CAPITAL AVE NE
BATTLE CREEK, MI 49017
TR HOUSES ARE OCCUPIED. NO DRAWINGS WILL BE PROVIDED TO THE
CONTRACTOR FOR THE TR HOUSES. CONTRACTOR IS RESPONSIBLE FOR
EVALUATING THE SCOPE OF WORK AGAINST THE EXISTING CONDITIONS.
THE SCOPE OF WORK FOR THE TR HOUSES IS DEFINED HEREIN:
1. IDENTIFY ALL STEEL DOMESTIC WATER PIPING. REPLACE PIPING AND
VALVES WITH COPPER OR OTHERWISE IN ACCORDANCE WITH THE
SPECIFICATIONS. SOME RE-PIPING WILL REQUIRE REPLACEMENT OF
HARDWARE CONNECTION TO APPLIANCES SUCH AS WASHING
MACHINES. REPAIR FINISHES TO MATCH EXISTING WHERE
DISTURBED TO ACCESS PIPING.
2. IDENTIFY AND REMOVE ALL FIELD FABRICATED AIR CHAMBER OR
WATER HAMMER ARRESTERS. REPLACE WITH CERTIFIED WATER
HAMMER ARRESTER TIGHT TO ACTIVE WATER PIPING.
3. IDENTIFY AND REMOVE ALL CONNECTED BUT INACTIVE SEGMENTS
OF PIPING INCLUDING FITTING AT ACTIVE SECTION OF PIPING.
REPAIR SECTION OF ACTIVE PIPING BY SPLICING IN NEW SECTIONS
OF PIPING AND FITTINGS TO RECONNECT ACTIVE PORTION OF THE
SYSTEM. SEE DEAD-LEG REMOVAL DETAIL/DESCRIPTION, VA
DIRECTIVE 1061, AND SPECIFICATIONS FOR MORE INFORMATION.
REPAIR FINISHES TO MATCH EXISTING WHERE DISTURBED TO
ACCESS PIPING.
4. INSULATE ALL ACCESSIBLE DOMESTIC WATER PIPING (HOT AND
COLD). LABEL PIPING ACCORDING TO SPECIFICATION 09 91 00.
5. FLUSH AND DISINFECT PIPING PER DRAWINGS AND SPECIFICATIONS.
DEDUCT ALTERNATE #1
CONTINUOUS WATER QUALITY
MONITORING EQUIPMENT
NEW SINGLE HOT OR COLD WATER QUALITY MONITORING STATIONS
SHALL MONITOR PH, TOTAL DISSOLVED SOLIDS, OXIDANT REDUCTION
POTENTIAL, TEMPERATURE, AND PRESSURE OF THE HOT OR COLD
WATER SYSTEM AS DESIGNATED ON THE DRAWINGS.
NEW DUAL HOT AND COLD WATER QUALITY MONITORING STATIONS
SHALL MONITOR BOTH HOT AND COLD WATER PH, TOTAL DISSOLVED
SOLIDS, OXIDANT REDUCTION POTENTIAL, TEMPERATURE, AND
PRESSURE.
WATER QUALITY MONITORING EQUIPMENT SHALL MATCH
MANUFACTURER AND STYLE OF EQUIPMENT INSTALLED BY VA PROJECT
# 515-13-120 "INSTALL WATER MONITORING SYSTEM". REFERENCE
SPECIFICATION 22 05 19 FOR ADDITIONAL DETAILS REGARDING
EQUIPMENT AND BAS INTEGRATION.
DETAILS 6 AND 7 ON THIS SHEET ARE PROVIDED FOR A GENERAL
UNDERSTANDING OF HOW THE PANELS ARE INSTALLED. INSTALLATION
SHALL BE COMPLETED IN ACCORDANCE WITH MANUFACTURER
INSTRUCTIONS. DESIGN TEMPERATURE FOR HOT WATER COMPONENTS
SHALL BE AT MINIMUM 140 DEG F.
ALL MONITORING POINTS SHALL BE INTEGRATED INTO THE SITE
BUILDING AUTOMATION SYSTEM. CONTROLS INTEGRATOR SHALL
PROVIDE INTEGRATION DESIGN AND ALL REQUIRED EQUIPMENT
INCLUDING BUT NOT LIMITED TO EQUIPMENT GATEWAYS, ROUTERS,
CONTROLLERS, POWER SUPPLIES, ENCLOSURES.
PROVIDE A DEDICATED LOCAL 120V, 20A CIRCUIT TO POWER CONTROL
PANEL. INSTALL A SWITCH INSIDE CONTROL PANEL FOR DISCONNECTING
MEANS.
INSTALLATION:
1. THE CONTRACTOR SHALL SURVEY ALL EXISTING PIPING AT PROPOSED
MONITORING STATION LOCATIONS TO DETERMINE EXACT LOCATION
AND ADEQUATE SIZE AND SPACE IS AVAILABLE FOR NEW WORK.
EXISTING EQUIPMENT MAY REQUIRE RELOCATION WITHIN SPACE AND
SHALL BE COORDINATED WITH COR. SEE ARCHITECTURAL SHEETS FOR
ADDITIONAL DETAILS.
2. TAP LOCATIONS FOR COLD AND HOT WATER SAMPLES ARE
RECOMMENDED ON PLANS PER THE FOLLOWING REQUIREMENTS:
A. HOT WATER SAMPLE SHALL TAP OFF OF THE HOT WATER SUPPLY
OR RETURN HEADER (NOT ON BRANCH TO FIXTURE).
B. COLD WATER MAY TAP OFF OF NEARBY HEADER OR BRANCH OF AT
LEAST 3/4" NOMINAL PIPE SIZE.
SIGNIFICANT DEVIATION FROM RECOMMENDED TAP LOCATIONS SHALL
BE COORDINATED WITH COR. PIPING BETWEEN PANEL AND TAP SHALL
BE 3/4" UNLESS RECOMMENDED OTHERWISE BY PANEL
MANUFACTURER AND APPROVED BY OWNER.
3. RECOMMENDED TAP LOCATIONS LOCATIONS MAY BE IN OTHER AREAS
OR FLOORS OF THE BUILDING THAN THE MONITORING PANELS.
4. SAMPLE TAP PAIRS SHALL BE SPACED MINIMUM 24" FROM EACH OTHER.
ISOLATION VALVE SHALL BE AS CLOSE AS PRACTICABLE TO TAP
LOCATION.
5. CONTRACTOR SHALL SURVEY AREA TO LOCATE POWER AND BUILDING
AUTOMATION SYSTEM INTEGRATION POINTS.
6. PIPING AT PROPOSED MONITORING STATION LOCATIONS SHALL BE
ISOLATED AND DRAINED TO ACCOMMODATE INSTALLATION OF
ISOLATION VALVES, MONITORING PROBES, AND ACCESSORIES.
7. MAKE PROVISIONS FOR TESTING AND STERILIZING PIPING AFFECTED BY
REVISION WORK. INSTALLATION WORK SHALL CONFORM TO
SPECIFICATION SECTION 22 11 00.
8. PROVIDE PROVISIONS FOR VENTING HIGH POINTS CREATED IN PIPING
BETWEEN TAP LOCATION AND PANEL CONNECTION.
9. ALL SAMPLE PIPING SHALL BE INSULATED. PIPING WITHIN PUBLIC AREAS
SHALL BE CONCEALED AS SHOWN ON ARCHITECTURAL SHEETS. ALL
FINISHES SHALL MATCH EXISTING.
10. INCLUDE ALL ELECTRICAL WORK REQUIRED ASSOCIATED WITH THE
INSTALLATION OF MECHANICAL AND PLUMBING EQUIPMENT SHOWN
THROUGHOUT THESE DOCUMENTS.
11. PROVIDE DIRECT WIRING OF EQUIPMENT PER THE MANUFACTURERS
REQUIREMENTS. RECEPTACLES MAY BE USED AS AN ALTERNATE BUT
REQUIRE APPROVAL FROM MANUFACTURER AND OWNER.
12. ALL WIRING SHALL BE INSTALLED IN METAL RACEWAYS.
13. PROVIDE ANY NEW CIRCUIT BREAKERS REQUIRED FOR THESE
CIRCUITS.
14. INSTALL CONTROL AND DATA WIRING IN METALLIC RACEWAYS.
15. COMMUNICATIONS AND SIGNAL WIRING SHALL CONFORM TO THE
RECOMMENDATIONS OF THE MANUFACTURERS SYSTEM, BUT NOT LESS
THAN CATEGORY 6A.
(E) DOMESTIC WATER
(COLD OR HOT) 3/4" SAMPLE WATER TAP (TYP)
SINGLE
MONITORING
PANEL
3/4" ISOLATION
VALVE (TYP)
(E) DOMESTIC HOT WATER
3/4" SAMPLE
WATER TAPS
DUAL
MONITORING
PANEL
(E) DOMESTIC COLD WATER
3/4" SAMPLE
WATER TAPS
3/4" ISOLATION
VALVE (TYP)
FIXTURE UPGRADES
CONTRACTOR SHALL INSTALL FIXTURES WITH CAPABILITY FOR
PROGRAMMABLE AUTOMATIC FLUSHING AT VARIOUS LOCATIONS
WHERE INDICATED ON THE PLAN DRAWINGS BY KEYNOTE.
FIXTURE SPECIFICATIONS ARE PROVIDED BELOW. CONTRACTOR IS
RESPONSIBLE FOR INSPECTION OF THE EXISTING FIXTURE AND
VERIFICATION OF THE APPROPRIATE FIXTURE SIZE, SINK DECK
CLEARANCE, MOUNTING HARDWARE, COVER PLATES, ETC.
CONTRACTOR SHALL REPAIR ARCHITECTURAL FINISHES WITH
STAINLESS COVER PLATE OR MATCH EXISTING FINISHES (SEE GENERAL
NOTES, THIS SHEET). COVER PLATES ON EXISTING SINK DECK SHALL
COMPLETELY CONCEAL HOLES IN THE SINK AT THE FORMER HANDLE
LOCATIONS.
FAUCETS (PP-101 ON DRAWINGS)
1. DECK MOUNTED SINGLE OUTLET TRADITIONAL LAVATORY STYLE
FAUCET WITH INFRARED SENSOR.
2. PROGRAMMABLE AUTOMATIC FLUSH SCHEDULE WITH ADJUSTABLE
FLUSH DURATION.
3. AVAILABLE AS HARDWIRED OR BATTERY OPERATED (CONTRACTOR
SHALL HARDWIRE IF POWER AVAILABLE TO EXISTING FIXTURE TO BE
REPLACED).
4. LAMINAR FLOW (NON-AERATING) OUTLET.
5. CAPABLE OF TEMPORARY HIGH TEMPERATURE FLUSH (UP TO 180F)
6. CERTIFIED TO NSF 61. ADA COMPLIANT. INSTALLED WITH ASSE 1070
MIXING VALVE.
WATER CLOSET FLUSH VALVES (PP-201 ON DRAWINGS)
1. EXPOSED, BATTERY POWERED (SIZE AA), INFRARED SENSOR
ACTIVATED WATER CLOSET FLUSHOMETER FOR FLOOR MOUNTED
OR WALL HUNG TOP SPUD BOWLS.
2. EXPOSED DIAPHRAGM TYPE, CHROME PLATED, RIGHT OR LEFT HAND
SUPPLY.
3. FLUSH OVERRIDE BUTTON. ADA COMPLIANT.
4. AUTOMATIC FLUSH EVERY 24 HOURS OF NON-USE.
BUILDING 300 - TREATMENT
SYSTEM
ALL WORK SHOWN ON SHEET 300P101 IS INCLUDED IN DEDUCT
ALTERNATE #2, INCLUDING CONSTRUCTION PERMITTING ASSOCIATED
WITH INSTALLATION OF WATER TREATMENT SYSTEM.
DEDUCT ALTERNATE #2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NO. : 2018-05157
VA Project No.515-18-107
FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
/1
/2
:3
:2
P
M
CORRECT WATER
DISTRIBUTION DEFICIENCIES
FOR LEGIONELLA
02/24/2020
GENERAL NOTES AND DETAILS
P002
KGPDP
BATTLE CREEK, MICHIGAN
100% BID DOCUMENTS
DETAIL NOTES
1 EXISTING DOMESTIC WATER MAIN PIPING.
2 REMOVE EXISTING DEAD-END PIPING COMPLETELY, INCLUDING CONNECTION,
BACK TO ACTIVE MAIN. REFER TO SEQUENCE OF CONSTRUCTION AND PHASING
NOTES ON THIS SHEET.
3 INSTALL NEW DOMESTIC WATER PIPING OR FITTING AT ACTIVE MAIN. REFER TO
SEQUENCE OF CONSTRUCTION AND PHASING NOTES ON THIS SHEET.
4 UPON APPROVAL OF THE COR (REFER TO CONTINGENCY REMOVAL PROCESS -
PHASING NOTE #3 ON THIS DRAWING) REMOVE EXISTING DEAD-END PIPING
BACK TO WITHIN TWO (2) PIPE DIAMETERS OF ACTIVE MAIN. REFER TO
SEQUENCE OF CONSTRUCTION AND PHASING NOTES ON THIS SHEET.
5 UPON APPROVAL OF THE COR (REFER TO CONTINGENCY REMOVAL PROCESS -
PHASING NOTE #3 ON THIS DRAWING) INSTALL NEW CAP ON DOMESTIC WATER
PIPING STUB WITHIN TWO (2) PIPE DIAMETERS OF ACTIVE MAIN. REFER TO
SEQUENCE OF CONSTRUCTION AND PHASING NOTES ON THIS SHEET.
SCALE: NONE
FLOW CONTROLLER ASSEMBLY
SCALE: NONE
PIPE HANGER DETAIL
SCALE: NONE
HANGER ROD DETAIL
WATER QUALITY MONITOR - SINGLE HOT OR COLD WATER
WATER QUALITY MONITOR - DUAL HOT AND COLD WATER
NOTE:
FLOW CONTROLLER ASSEMBLIES ARE REPRESENTED ON PLANS AS A SINGLE
AUTOMATIC FLOW CONTROLLER SYMBOL AND TAGGED AS "FC-#". VALVE
SIZES SHALL MATCH PIPE SIZES (FIELD VERIFIED BY CONTRACTOR).
WHERE VALVES ARE INSTALLED ABOVE HARD CEILINGS, THE CONTRACTOR
IS RESPONSIBLE FOR PROVIDING ACCESS PANELS FOR THE NEW VALVING
(24" SQUARE) AND REPAIRING AREA TO MATCH EXISTING FINISHES.
CONTRACTOR SHALL INSPECT EXISTING PIPING NEAR CIRCULATOR PUMPS
FOR BALANCING VALVES AND ADJUST AS REQUIRED.
GENERAL
NOTES
INSTRUMENT
TAG
POINT NAME
TYPE
ALARM
NOTES
R E
S
ID
U A
L O
X
ID
A N
T , D
C W
A. CONTRACTOR SHALL COORDINATE ALL INTEGRATION POINTS WITH THE WATER MONITORING
SYSTEM MANUFACTURER.
B. CONTRACTOR SHALL COORDINATE LOCATION OF MONITORS WITH THE ARCHITECTURAL
ENLARGED PLANS AND ELEVATIONS.
C. EACH ROW REPRESENTS A SINGLE PANEL.
D. REFER TO SPECIFICATION 22 05 19 PANEL REQUIREMENTS.
DI
P H
, D C
W
DI
T E
M P
E R
A T
U R
E , D
C W
DI
P R
E S
S U
R E
, D C
W
DI DI
WATER QUALITY MONITORING PANELS - POINT LIST
D
IS
S O
LV
E
D S
O
LI
D S
, D C
W
3-WQ-1A 3-WQ-1B 3-WQ-1C 3-WQ-1D 3-WQ-1E 3-WQ-1F 3-WQ-1G
3-WQ-2A 3-WQ-2B 3-WQ-2C 3-WQ-2D 3-WQ-2E
R E
S
ID
U A
L O
X
ID
A N
T , D
H W
T E
M P
E R
A T
U R
E , D
H W
14-WQ-1A 14-WQ-1B 14-WQ-1C 14-WQ-1D 14-WQ-1E
14-WQ-2F 14-WQ-2G14-WQ-2A 14-WQ-2B 14-WQ-2C 14-WQ-2D 14-WQ-2E
22-WQ-1A 22-WQ-1B 22-WQ-1C 22-WQ-1D 22-WQ-1E 22-WQ-1F 22-WQ-1G
22-WQ-2A 22-WQ-2B 22-WQ-2C 22-WQ-2D 22-WQ-2E
39-WQ-1A 39-WQ-1B 39-WQ-1C 39-WQ-1D 39-WQ-1E
39-WQ-2F 39-WQ-2G39-WQ-2A 39-WQ-2B 39-WQ-2C 39-WQ-2D 39-WQ-2E
39-WQ-4A 39-WQ-4B 39-WQ-4C 39-WQ-4D 39-WQ-4E
82-WQ-1A 82-WQ-1B 82-WQ-1C 82-WQ-1D 82-WQ-1E 82-WQ-1F 82-WQ-1G
82-WQ-2A 82-WQ-2B 82-WQ-2C 82-WQ-2D 82-WQ-2E
83-WQ-1A 83-WQ-1B 83-WQ-1C 83-WQ-1D 83-WQ-1E
83-WQ-2F 83-WQ-2G83-WQ-2A 83-WQ-2B 83-WQ-2C 83-WQ-2D 83-WQ-2E
84-WQ-1A 84-WQ-1B 84-WQ-1C 84-WQ-1D 84-WQ-1E 84-WQ-1F 84-WQ-1G
84-WQ-2A 84-WQ-2B 84-WQ-2C 84-WQ-2D 84-WQ-2E
P H
, D H
W
DI
P R
E S
S U
R E
, D H
W
DI DI
D
IS
S O
LV
E
D S
O
LI
D S
, D H
W
3-WQ-1H 3-WQ-1I 3-WQ-1J
14-WQ-2C 14-WQ-2I 14-WQ-2J
22-WQ-1C 22-WQ-1I 22-WQ-1J
39-WQ-2C 39-WQ-2I 39-WQ-2I
82-WQ-1C 82-WQ-1I 82-WQ-1J
83-WQ-2C 83-WQ-2I 83-WQ-2J
84-WQ-1C 84-WQ-1I 84-WQ-1J
39-WQ-3F 39-WQ-3G 39-WQ-3H 39-WQ-3I 39-WQ-3J
DI DI
POINT NUMBER
3-WQ-1
3-WQ-2
14-WQ-1
14-WQ-2
22-WQ-1
22-WQ-2
39-WQ-1
39-WQ-2
39-WQ-4
82-WQ-1
82-WQ-2
83-WQ-1
83-WQ-2
84-WQ-1
84-WQ-2
39-WQ-3
YES YES YES YES YES YESYESYESYESYES
1 1 1 1 1 1 1111
NOTES: 1. POINT REQUIRES TRENDING AND ALARM. FREQUENCY AND SETPOINTS TO BE PROVIDED BY OWNER.
GENERAL NOTES
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND / OR
SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. SEE SHEETS P001 AND P002 FOR LEGENDS, ABBREVIATIONS, AND GENERAL NOTES.
2. REFER TO SPECIFICATION 23 09 23 FOR REQUIREMENTS RELATED TO SCOPE OF WORK
SHOWN ON THIS SHEET.
3. SEE PLANS FOR PHYSICAL LOCATION OF INSTRUMENTATION. TYPICAL INSTALLATION
DETAIL CAN BE FOUND ON SHEET AE101.
4. EXISTING PIPING, CONDUIT, OR OTHER CONSTRUCTION SHALL BE LOCATED AS
REQUIRED. SEE DRAWINGS FOR DETAILS. COORDINATE WITH COR PRIOR TO ANY WORK.
COR SHALL CONFIRM LOCATIONS AS REQUIRED FOR DEMOLITION AND INSTALLATION
WORK.
5. ALL WATER QUALITY MONITORING PANELS SHALL BE INSTALLED IN LOCKABLE
ENCLOSURES. ENCLOSURES SHALL BE PROVIDED BY MONITORING PANEL
MANUFACTURER. CONTRACTOR SHALL CREATE PENETRATIONS IN ENCLOSURE FOR
PIPING AS RECOMMENDED BY MANUFACTURER. ALL ENCLOSURE LOCKS SHALL BE KEYED
ALIKE.
6. ALL EQUIPMENT CONTROLLERS, PORTALS, ROUTERS, AND OTHER LIKE EQUIPMENT
SHALL BE INSTALLED IN NEMA RATED ENCLOSURES AS RECOMMENDED BY THE
CONTROLS CONTRACTOR.
7. THE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING 120V POWER TO
THE DEVICES AS REQUIRED FROM ADJACENT POWER SOURCES (WITHIN 150' IN MOST
INSTANCES UNLESS NOTED OTHERWISE). CONTRACTOR SHALL CONFIRM SOURCE OF
POWER WITH COR.
8. TYPICAL PANEL AND ENCLOSURE DETAILS SHOWN ON THIS SHEET ARE FOR REFERENCE
ONLY. PANELS CONSTRUCTED AND SUPPLIED BY MANUFACTURER PER SPECIFICATIONS
WILL VARY FROM LAYOUT SHOWN. DIMENSIONS ARE PROVIDED FOR REFERENCE AND
MAY VARY.
9. INSTRUMENTATION INCLUDED IN DEDUCT ALTERNATE #2 IS NOT SHOWN ON THIS SHEET.
SEE SHEET 300P101 AND SPECIFICATIONS FOR ADDITIONAL DETAILS AND REQUIREMENTS
REGARDING TREATMENT SYSTEM CONTROLS AND BAS INTEGRATION.
NOTES: 1. PANEL IS NOT REQUIRED TO BE MOUNTED INSIDE A LOCKABLE ENCLOSURE.
3-WQ-2 BUILDING 3 131 LAUNDRY COLD TOP ----
14-WQ-1 BUILDING 14 243 LAUNDRY COLD TOP ----
14-WQ-2 BUILDING 14 216 HOUSEKEEPING DUAL TOP ----
22-WQ-1 BUILDING 22 225 HOUSEKEEPING DUAL TOP ----
22-WQ-2 BUILDING 22 204 PANTRY COLD TOP ----
39-WQ-1 BUILDING 39 242A HOUSEKEEPING COLD TOP ----
82-WQ-1 BUILDING 82 150 STAFF LOUNGE DUAL TOP ----
82-WQ-2 BUILDING 82 110 LOUNGE COLD TOP ----
83-WQ-1 BUILDING 83 237 MEDS/MED SELECT COLD TOP ----
83-WQ-2 BUILDING 83 212 LAUNDRY DUAL TOP ----
84-WQ-1 BUILDING 84 208B UTILITY DUAL TOP ----
84-WQ-2 BUILDING 84 239A UTILITY COLD SIDE ----
39-WQ-2 BUILDING 39 209A STAFF TOILET DUAL TOP ----
39-WQ-3 BUILDING 39 B040 MECHANICAL HOT TOP 1
39-WQ-4 BUILDING 39 B134 LAUNDRY COLD TOP ----
DOMESTIC WATER QUALITY MONITORING PANELS - SCHEDULE
MARK
AREA AND/OR
BLDG SERVED
ROOM
SYSTEM AND/OR
SERVICE
ORIENTATION
OF PIPE
CONNECTION
REMARKS
3-WQ-1 BUILDING 3 109 EXAM DUAL TOP ----
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NO. : 2018-05157
VA Project No.515-18-107
FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
/2
/2
:3
:3
P
M
CORRECT WATER
DISTRIBUTION DEFICIENCIES
FOR LEGIONELLA
02/24/2020
INSTRUMENTATION AND
CONTROLS
P003
PDPPDP
BATTLE CREEK, MICHIGAN
100% BID DOCUMENTS
SCALE: NONE
CONTROLS - TYPICAL WIRING
SCALE: NONE
TYPICAL ENCLOSURE - DUAL PANEL
3 SCALE: NONE
TYPICAL ENCLOSURE - SINGLE PANEL
4 SCALE: NONE
TYPICAL PANEL LAYOUT - SINGLE PANEL (SIDE CONNECTION)
6SCALE: NONE
TYPICAL PANEL LAYOUT - DUAL PANEL (TOP CONNECTION)
EX
PN
EX
PN
EX
PN
EX
PN
EX
PN
EX
PN
EX
PN
EXISTING INCINERATOR
EX
D
AT
A
EX. DATA
COND
EX
PN
3/4"
UPUP UP UP UP UP UP
UP
UP
UP
UP
UP
UP UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
BUILDING
SERVICE
3/4" CW
3/4" HW
3/4" HWR
2" CW
2" HW
1" HWR
2" CW
2" HW
1" HWR
3" CW
2" CW
2" HW
3/4" HWR
1/2" CW
1/2" HW
2" CW
2" HW
3/4" HWR 1 1/2" CW
1" HW
3/4" HWR
EXISTING
CRAWLSPACE
EXISTING
CRAWLSPACE
BASEMENT
001E
2" CW
CONTRACTOR
STAGING AREA
12 169
19482
165200
T98
100 26
30139
97171
SHAFTER CIRCLE SOUTH
JO
H N S O
N D
R
IV
E
S H
A
FT
ER
C
IR
C
LE
E
A S T
HA
M
M
ER
BE
RG
L
AN
E
S H
AFTER C
IR
C
LE N
O R
TH
LAMBERS TRAIL
SHAFTER CIRCLE WEST
FO
X
LA
NE
WILLIAMS LANE
URB
AN
D
RIV
E
FURLO
NG
LANE
DEWEY LANE
BASEBALL
FIELD
BASKETBALL
COURT
TENNIS
COURT
HAZ. MAT.
STOR.
FLO
RAL LANE
EX
PN
EX
PN
EX
PN
EX
PN
EX
PN
EX
PN
EX
PN
EXISTING INCINERATOR
EX
D
A
TA
EX. DATA
COND
EX
PN
UP
UP
2" CW
2" HW
1" HWR 1/2" CW
EXISTING
CRAWLSPACE
EXISTING
CRAWLSPACE
BASEMENT
001E
TYP
FC-02
0.5 GPM
FC-03
0.5 GPM
FC-01
1.0 GPM
FC-04
1.0 GPM
FC-05
0.5 GPM
BLDG 3
TO/FROM
WATER HEATER
FROM
WATER HEATER
A. SEE SHEETS P001 AND P002 FOR LEGENDS, ABBREVIATIONS, AND
GENERAL NOTES.
B. SEE SHEET P003 FOR INSTRUMENTATION AND CONTROL DETAILS AND
SCHEDULES
GENERAL NOTES
DOMESTIC WATER
LINETYPE LEGEND
SYMBOL DESCRIPTION
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
FIRE RATING
LINETYPE LEGEND
SYMBOL DESCRIPTION
1 HOUR ENCLOSURE
SMOKE BARRIER
SMOKE PARTITION
2 HOUR ENCLOSURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NO. : 2018-05157
VA Project No.515-18-107
FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
/2
/2
:3
:3
P
M
CORRECT WATER
DISTRIBUTION DEFICIENCIES
FOR LEGIONELLA
02/24/2020
BLDG 3 - BASEMENT PLAN
3P100
KGPDP
BATTLE CREEK, MICHIGAN
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"
BLDG 3 - BASEMENT PLAN
SCALE: NONE
CAMPUS PLAN
N
SCALE: 1/4" = 1'-0"
BLDG 3 - ENLARGED BASEMENT 001E PLAN
WATER
HEATER (E)
BLDG 3 - RM 001E HWR PUMP
D R A W I N G N O T E S
1 ACCESS DOMESTIC WATER PIPING IN BASEMENT AND CRAWL SPACE. REMOVE ALL
CONNECTED BUT INACTIVE SEGMENTS OF PIPING INCLUDING FITTING AT ACTIVE SECTION
OF PIPING. REPAIR SECTION OF ACTIVE PIPING BY SPLICING IN NEW SECTIONS OF PIPING
AND FITTINGS TO RECONNECT ACTIVE PORTION OF THE SYSTEM AND REINSULATE
PORTION OF DISTURBED PIPING. ALL OTHER BUILDING SYSTEMS IN THE SPACE ARE TO
REMAIN UNAFFECTED. SEE ISOMETRIC, VA DIRECTIVE 1061, AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
2 INSTALL NEW FLOW CONTROLLER ASSEMBLY. SEE DETAIL 2 ON SHEET P002. CONTRACTOR
SHALL IDENTIFY AND REMOVE ANY EXISTING BALANCING VALVES ON RETURN BRANCH.
3 WATER QUALITY SAMPLE TAP LOCATION FOR 3-WQ-1.
4 NEW ISOLATION VALVE FOR PARTIAL SHUTDOWN OF SYSTEM. CONTRACTOR SHALL
ADJUST LOCATION AS APPROPRIATE FOR EASE OF ACCESS AND PHASING PURPOSES.
CONTRACTOR SHALL DETERMINE SIZE OF PIPE IN FIELD. VALVE SIZE SHALL MATCH PIPE
SIZE.
N
N
(FOR REFERENCE)
109B
C13
C13
101A
100B
C13
C12
C11
100A
C14
C
C16
001E
MECH
C16
135 134
E 131
C07
C16
130 129B
119 120
128A
103104105
109A
107108109
EXAM EXAM EXAM EXAM EXAM EXAM EXAM EXAM
TOILET
TOILET
128A
129A
PLATFORM
OFFICE
OFFICE
STORAGE
OFFICE
H.A.C.
CONCRETE
PLATFORM
CONCRETE
TERRACE
OFFICE EXAM
TESTING RM.
HOPTEL
TRAINING
OFFICE
STORAGE, GEN.
EXAM
OFFICE
MULTIPURPOSE ROOM LNDRY
OFFICEOFFICE
OFFICE
EXAM/
TREATMENT RM
HOPTEL
HOPTEL
HOPTEL
EXAM /
TREATMENT ROOM
OFFICE
ROOM
OFFICE
EXAM
VEST
KITCHEN
CONTRACTOR
STAGING AREA
12 169
19482
165200
T98
100 26
30139
97171
SHAFTER CIRCLE SOUTH
JO
H N S O
N D
R
IV
E
S H
A
FT
ER
C
IR
C
LE
E
A S T
HA
M
M
ER
BE
RG
L
AN
E
S H
AFTER C
IR
C
LE N
O R
TH
LAMBERS TRAIL
SHAFTER CIRCLE WEST
FO
X
LA
NE
WILLIAMS LANE
URB
AN
D
RIV
E
FURLO
NG
LANE
DEWEY LANE
BASEBALL
FIELD
BASKETBALL
COURT
TENNIS
COURT
HAZ. MAT.
STOR.
FLO
RAL LANE
23-WQ-1
3-WQ-2
BLDG 3
A. SEE SHEETS P001 AND P002 FOR LEGENDS, ABBREVIATIONS, AND
GENERAL NOTES.
B. SEE SHEET P003 FOR INSTRUMENTATION AND CONTROL DETAILS AND
SCHEDULES
GENERAL NOTESDOMESTIC WATER
LINETYPE LEGEND
SYMBOL DESCRIPTION
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
FIRE RATING
LINETYPE LEGEND
SYMBOL DESCRIPTION
1 HOUR ENCLOSURE
SMOKE BARRIER
SMOKE PARTITION
2 HOUR ENCLOSURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NO. : 2018-05157
VA Project No.515-18-107
FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
/2
/2
:3
:4
P
M
CORRECT WATER
DISTRIBUTION DEFICIENCIES
FOR LEGIONELLA
02/24/2020
BLDG 3 - FIRST FLOOR PLAN
3P101
KGPDP
BATTLE CREEK, MICHIGAN
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"
BLDG 3 - FIRST FLOOR PLAN
SCALE: NONE
CAMPUS PLAN
N
D R A W I N G N O T E S
1 INSTALL NEW DISTAL POINT COLD WATER MONITORING STATION. SEE SHEETS AE101 AND
AE102 FOR ENLARGED PLANS, ELEVATIONS, AND ARCHITECTURAL NOTES.
2 INSTALL NEW DISTAL POINT DUAL COLD AND HOT WATER MONITORING STATION. SEE
SHEETS AE101 AND AE102 FOR ENLARGED PLANS, ELEVATIONS, AND ARCHITECTURAL
NOTES.
3 WATER QUALITY SAMPLE TAP LOCATION FOR 3-WQ-2.
N
UP TO 131
UP TO 136
BUILDING SERVICE
UP TO 113
UP TO 121A
UP TO 121A
UP TO 120A
UP TO 123A
UP TO 123A
UP TO 102
UP TO 110
UP TO 122A
UP TO ROOMS
114 AND 115
WATER HEATER PIPING
(OMITTED FROM DRAWING)
UP TO 137
UP TO 120A
UP TO 123A
UP TO 122A
UP TO 100A
UP TO C11
UP TO 101
101A
UP TO 101,
101A
UP TO 103
UP TO 104
UP TO 105
UP TO 106, 107
UP TO 108
UP TO 109
3/4" CW
3/4" HW
3/4" HWR
2" CW
2" HW
1" HWR
2" CW
2" HW
3/4" HWR
2" CW
2" HW
3/4" HWR
2" CW
2" HW
1" HWR
3" CW
1/2" CW
1/2" HW
3/4" CW
3/4" HW
1 1/2" CW
1" HW
3/4" HWR
A. SEE SHEETS P001 AND P002 FOR LEGENDS, ABBREVIATIONS, AND
GENERAL NOTES.
B. SEE SHEET P003 FOR INSTRUMENTATION AND CONTROL DETAILS AND
SCHEDULES
GENERAL NOTES
DOMESTIC WATER
LINETYPE LEGEND
SYMBOL DESCRIPTION
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NO. : 2018-05157
VA Project No.515-18-107
FFE Inc Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
/2
/2
:3
:4
P
M
CORRECT WATER
DISTRIBUTION DEFICIENCIES
FOR LEGIONELLA
02/24/2020
BLDG 3 - BASEMENT ISOMETRIC
PLAN
3P501
KGPDP
BATTLE CREEK, MICHIGAN
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: NONE
BLDG 3 - BASEMENT ISOMETRIC PLAN
D R A W I N G N O T E S
1 REMOVE ALL CONNECTED BUT INACTIVE SEGMENTS OF PIPING INCLUDING FITTING AT
ACTIVE SECTION OF PIPING. REPAIR SECTION OF ACTIVE PIPING BY SPLICING IN NEW
SECTIONS OF PIPING AND FITTINGS TO RECONNECT ACTIVE PORTION OF SYSTEM AND
REINSULATE PORTION OF UNDISTURBED PIPING. ALL OTHER BUILDING SYSTEMS IN THE
SPACE ARE TO REMAIN UNAFFECTED. SEE PLAN, VA DIRECTIVE 1061, AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
UPUP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP UP
UP
UP
UP
UP
UP
UP
UP
1/2" CW
1/2"
1" CW
3/4" HW
3/4" HWR
1 1/2" CW
3/4" HW
3/4" HWR
3/4" 2"
3" CW
2" HW
1 1/2" HWR
4" 1 1/2" 3"
4" CW
3" HW
1 1/2" HWR
1" CW
3/4" HW
3/4"
1" CW
3/4" HW
1" CW
3/4" HW
3/4" HWR
1" CW
3/4" HW
3/4" HWR
2"
3/4" CW
1/2" HW
1/2" HWR
3/4" 1"
3/4"
1/2"
2"
1" CW
1" HW
3/4" HWR
3/4"
3/4" CW
1/2" HW
1/2" HWR
3/4"
BUILDING SERVICE
MECH. MAKE UP
WATER HEATER
BASEMENT
14e
EX. PNEX. PN
EX. PN
CONTRACTOR
STAGING AREA
12 169
19482
165200
T98
100 26
30139
97171
SHAFTER CIRCLE SOUTH
JO
H N S O
N D
R
IV
E
S H
A
FT
ER
C
IR
C
LE
E
A S T
HA
M
M
ER
BE
RG
L
AN
E
S H
AFTER C
IR
C
LE N
O R
TH
LAMBERS TRAIL
SHAFTER CIRCLE WEST
FO
X
LA
NE
WILLIAMS LANE
URB
AN
D
RIV
E
FURLO
NG
LANE
DEWEY LANE
BASEBALL
FIELD
BASKETBALL
COURT
TENNIS
COURT
HAZ. MAT.
STOR.
FLO
RAL LANE
FC-02
0.5 GPM
FC-03
0.5 GPM
FC-04
1.0 GPM
FC-05
0.5 GPM
FC-06
0.5 GPM
FC-07
0.5 GPM
FC-08
0.5 GPM
FC-09
0.5 GPM
FC-01
0.5 GPM
444444
BLDG 14
A. SEE SHEETS P001 AND P002 FOR…
This is the start of the file's text. The full file is on GovTribe.