Statement of Work.docx
DOCX document 22 KB Posted
- Attached to
- NPTU Charleston Fiber Network Testing
- Solicitation number
- FA441826FIBER
About this file
This is a Statement of Work for a comprehensive fiber optic network assessment at NPTU Charleston, spanning two campuses with interconnected infrastructure serving surveillance and access control systems. The contractor shall perform cleaning and inspection of all fiber optic connector end-faces using appropriate tools and document results per IEC 61300-3-35 criteria. Bi-directional insertion loss testing must be conducted on all terminated fiber strands using calibrated Optical Loss Test Set (OLTS) equipment at 1310 nm and 1550 nm wavelengths per TIA-568.3-D standards, with results documented for each strand. Optical Time-Domain Reflectometer (OTDR) testing shall be performed on all failed OLTS strands and previously identified faulted cables, with fault locations, event types, and reflectance values documented and trace files archived. Additional testing includes bare fiber adapter testing of unterminated spare strands to determine continuity and viability.
The physical infrastructure assessment encompasses visual inspection and documentation of fiber patch panels at four building locations, three junction point enclosures, and nine defensive fortification point enclosures across north and south campuses. The contractor shall inspect and photograph all camera-side termination points, cable types, jacket ratings, strand counts, connector types, and pathway conditions. Specific assessment areas include 28 cameras on the north campus with various cable configurations (2-strand to 144-strand backbone cables using ST-to-ST, ST-to-LC, and LC-to-LC connections) and 18 cameras on the south campus with similar connector configurations. Labeling compliance must be assessed against TIA-606-C standards. Deliverables include a comprehensive assessment report with prioritized remediation recommendations by criticality level, digital OLTS and OTDR test reports, connector inspection images, updated fiber strand assignment matrix, photographic documentation, and as-built drawings. Work hours are Monday through Friday, 7:00 AM to 4:00 PM.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Special Conditions.pdf | ||
| Fiber strand count.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.0 Scope of Work
3.1 In-Scope Activities
3.1.1 Connector Cleaning and Inspection
• Clean all fiber optic connector end-faces at every termination point across both campuses using appropriate fiber optic cleaning tools and methods (dry wipes, cleaning cassettes, or solvent cleaning as required by connector condition).
• Perform visual inspection of all connector end-faces using a fiber inspection probe at 200x/400x magnification.
• Document pass/fail results for each connector per IEC 61300-3-35 criteria.
3.1.2 Optical Loss Test Set (OLTS) Testing — First Pass
• Perform bi-directional insertion loss testing on all terminated fiber strands using calibrated OLTS equipment.
• Test at both 1310 nm and 1550 nm wavelengths per TIA-568.3-D.
• Document pass/fail results against TIA-568.3-D insertion loss limits for each strand.
• Record and catalog all test results in digital format for inclusion in the deliverables package.
3.1.3 OTDR Testing — Diagnostic Pass
• Perform OTDR testing on all strands that fail OLTS testing or exhibit anomalous loss characteristics.
• Perform OTDR testing on all strands previously identified by the customer as having cable faults.
• Document fault locations (distance from test point), event types (e.g., break, macro-bend, connector loss, splice loss), and reflectance values.
• Capture and archive OTDR trace files for all tested strands.
3.1.4 Bare Fiber Adapter (BFA) Testing of Unterminated Strands
• Test all unterminated spare fiber strands at every location using a bare fiber adapter to determine strand continuity and viability.
• Document results including continuity status and any identified faults.
3.1.5 Physical Infrastructure Assessment
• Visually inspect and document the condition of all Fiber Patch Panels (FPPs) at the following locations:
o Building 2701, Room 153 — FPP1, FPP4, FPP5, FPP7, South Perimeter FPP (Central Head-End / MDF) o Building 2711, Room 244 — FPP2 o Building 2314, Room 102 — FPP1, FPP2 o Building 2626, Room 117 — FPP1
• Visually inspect and document the condition of all junction point enclosures:
o North Pier Junction o North Gate Junction o South Pier Junction
• Visually inspect and document the condition of all Defensive Fortification Point (DFP) fiber enclosures:
o DFP 1, DFP 2, DFP 3, DFP 4, DFP 9 (North Campus) o DFP 5, DFP 6, DFP 7, DFP 8 (South Campus)
• Visually inspect and document all camera-side termination points at rooftop and perimeter pole/pier locations.
• Document cable types, jacket ratings, strand counts, connector types, and physical routing/pathway conditions at all accessible points.
• Photograph all termination points, FPPs, DFPs, junction boxes, cable pathways, and notable conditions.
3.1.6 North Campus Assessment Locations
The following locations and associated camera fiber runs shall be assessed:
Building 2711 Rooftop to Building 2711, Room 244 FPP2:
• Cameras 331, 332, 333, 334, 336, 337, 338, 339
• ST-to-ST connections, 6-strand cables Building 2314 Rooftop to Building 2314, Room 102 FPP2:
• Cameras 310, 314, North Switch, South Switch
• ST-to-LC and LC-to-LC connections, 2-strand and 6-strand cables North Perimeter Poles/Pier to Building 2701, Room 153 FPP1 and Junction Points:
• Cameras 12, 13, 19, 120, 121, 124, 125, 126, 127
• ST-to-LC connections, 2-strand and 6-strand cables DFP 1 through DFP 4 and DFP 9 to North Pier Junction and North Gate Junction:
• Cameras 22, 23, 29, 35, 39, 42, 43 and associated network switch connections
• ST-to-LC connections, 2-strand and 12-strand cables Backbone Cables:
• North Gate Junction to Building 2701, Room 153 — 72-strand LC-to-LC
• North Pier Junction (Access Control) to Building 2701, Room 153 — 72-strand LC-to-LC
• North Pier Junction (Video) to Building 2701, Room 153 — 72-strand LC-to-LC
• Building 2711, Room 244 FPP2 to Building 2701, Room 153 FPP4 — 48-strand LC-to-LC
• Building 2314, Room 102 FPP1 to Building 2701, Room 153 FPP5 — 144-strand LC-to-LC
3.1.7 South Campus Assessment Locations
The following locations and associated camera fiber runs shall be assessed:
Building 2701 Rooftop to Building 2701, Room 153 FPP7:
• Cameras 321, 322, 325, 326, 327, 328, 329
• ST-to-ST connections, 6-strand cables Building 2626 Rooftop to Building 2626, Room 117 FPP1:
• Cameras 341, 342, 345, 347, 348, 349
• ST-to-ST connections, 6-strand cables South Perimeter Poles/Pier to Building 2701, Room 153 FPP1 and DFP 8:
• Cameras 72, 73, 100, 101, 102, 105, 109, 110, 111, 112, 113, 114
• ST-to-LC and LC-to-LC connections, 2-strand, 6-strand, and 12-strand cables DFP 5 through DFP 8 to South Pier Junction and Building 2701, Room 153:
• Cameras 52, 53, 54, 62, 63, 69 and associated network switch connections
• ST-to-LC connections, 2-strand and 12-strand cables Backbone Cables:
• South Pier Junction (Access Control) to Building 2701, Room 153 — 72-strand LC-to-LC
• South Pier Junction (Video) to Building 2701, Room 153 — 72-strand LC-to-LC
• Building 2626, Room 117 (Access Control) to Building 2701, Room 153 — 48-strand LCto-LC
• Building 2626, Room 117 (Video) to Building 2701, Room 153 — 48-strand LC-to-LC
3.1.8 Labeling Assessment
• Document the current state of labeling on all components (faceplates, patch panels, cables, junction points).
• Assess labeling compliance against TIA-606-C standards.
• Include labeling deficiency findings and recommendations in the assessment report.
4.0 Deliverables
Upon completion of the assessment, Contractor shall provide the following deliverables in PDF format:
• Comprehensive Fiber Infrastructure Assessment Report — A narrative document containing:
· Executive summary of findings
· Detailed analysis of the fiber plant condition organized by campus area (North Campus, South Campus) and by location
· Identification and documentation of all deficiencies including faulted cables, bad terminations, failed connector inspections, and non-compliant labeling
· Prioritized remediation recommendations categorized by criticality (e.g., Critical — camera offline; High — degraded performance / single point of failure;
Medium — spare capacity deficiency; Low — standards compliance / connector standardization)
• OLTS Insertion Loss Test Results — Digital test reports for every terminated strand tested, organized by location and cable run, showing pass/fail against TIA-568.3-D at 1310 nm and 1550 nm.
• OTDR Trace Reports — OTDR test reports for all troubled/faulted strands including event tables and trace graphics showing fault locations, loss values, and reflectance.
• Connector End-Face Inspection Report — Inspection images and pass/fail results per IEC 61300-3-35 for all inspected connectors.
• Updated Fiber Strand Assignment Matrix — A verified and corrected spreadsheet documenting every cable run including:
· Side A location, camera/device assignment, and connector type
· Cable strand count (total, terminated, unterminated)
· Strand condition (good, faulted, untested)
· Side B location and connector type
· Fault location distances (where applicable)
· Notes and observations
• Photographic Documentation — Organized photographs of all termination points, FPPs, DFPs, junction boxes, cable pathways, and any notable conditions or deficiencies.
• As-Built Drawings — Updated pathway and connectivity drawings based on existing customer-provided documentation, reflecting verified field conditions.
Working Hours: Monday through Friday, 7:00 AM – 4:00 PM