Statement of Work.docx

DOCX document 22 KB Posted

Attached to
Roof Repairs for the Sterling Field Support Center in Sterling, VA
Solicitation number
142082-26-0425
Issued by

About this file

This is a Statement of Work for roof repairs at the National Oceanic and Atmospheric Administration's (NOAA) Sterling Field Support Center located in Sterling, VA 20166. The primary objective is to eliminate existing leaks and mitigate future leaks in the main building roof through a metal roof retrofit attached to the existing standing seam metal roof. The roof contains multiple mechanical systems including a test platform, four rooftop units (RTUs), three ductless split systems, mechanical vent hoods, and a lightning suppression system that must be carefully protected during work. Three smaller roofs requiring ladder access are also included in the scope.

The contractor must perform a comprehensive pre-bid site inspection and submit a detailed work plan with timelines and key milestones prior to work commencement, which shall begin within 30 calendar days of contract award. All materials must be approved for federal government use and included in the quote; if chemicals are used, Safety Data Sheets must be provided to the Federal Manager before work begins. The contractor is responsible for site preparation, material removal and disposal (either via dumpster or daily removal), and must adhere to best installation practices and all local and international codes. Work must be performed while the building remains occupied five days per week, requiring coordination with on-site management to prevent endangering staff or damaging property and equipment. All work requires a minimum 10-year workmanship warranty from completion date, with manufacturer warranties exceeding this period to be documented for final approval. The contractor must be licensed, insured, and a U.S. citizen or legal resident authorized to work on federal property. The NOAA Point of Contact is Jennifer Dover at jennifer.dover@noaa.gov.

View the file

Other files

File Type Posted
1305M226Q0155.pdf PDF
DBA DETERMINATION.pdf PDF
1305M226Q0155.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work 142082-26-0425 Sterling Field Support Center Main Building Roof Repairs

1. Project Overview & Objectives

· Project Location: National Weather Service Sterling Field Support Center, 43741 Weather Service Road, Sterling, VA 20166

· Primary Objective: The objective of the project is to eliminate known leaks in the roof throughout the building and mitigate possible future leaks. The required roofing is to be a metal roof retro-fit and attached to the existing roof.

· Roof Details: The roof of the main building is currently a standing seam metal roof with a centrally located gutter and drain system. The roof also houses a test platform that is elevated above the roof, testing equipment installed on a Unistrut structure that attaches to conduit used as building penetrations along the walkway, a wind baffle that houses all of the HVAC equipment (4 RTUs on curbs, 3 ductless splits sitting directly on the roof and a ductless split mounted to an angle iron frame that protrudes above the roof), several mechanical/gravity vent hoods and a lightning suppression system that follows the knee wall around the perimeter as well as crossing through the center of the roof and connecting to the aforementioned equipment. The roof also includes three smaller roofs that will need to be accessed by a ladder from the ground or from the main roof. The main roof is accessed via stairway on the east side of the building.

2. Detailed Scope of Work

· Site Preparation: The entire building is surrounded by asphalt allowing access to all sides of the building. The building is occupied 5 days a week with parking located on the north and west sides of the building. Safety is paramount at SFSC, all precautions need to be considered in order to mitigate possible damage to peoples and property. Any work that could endanger staff working inside of the building and/or damage personal property outside of the building will need to be discussed with management prior to work being scheduled to allow management to make any necessary concessions. The east side of the building is partially lined with environmental chamber condensing units, extra caution will need to be taken to avoid damage and mitigate any possibility of debris entering the condenser coils.

· Removal and Disposal: All trash and materials removed from the roof during repairs will need to contained within the working areas while work is being performed. A dumpster may be brought to the site and kept on-site for the duration of the project to be used for disposal of trash and debris. If a dumpster is not brought to the work site, all trash is required to be removed from the site at the end of each day to avoid the spreading of trash/debris around the property, to mitigate the possibility of damage to test equipment/property and to eliminate the possibility of endangering wildlife.

· Inspection: Prior to submitting a quote to perform work, vendors are expected to perform an in-depth inspection of the site where the work is to be performed. Once the contract is awarded no additional funding will be provided for “unforeseen circumstances” or oversites of the vendor selected to perform the work without submitting a request for change to the Point of Contact (POC) for approval.

· Installation Requirements: All materials used to replace/repair the roof in question must be approved for use on federal government buildings and included in the quote. If chemicals are to be used during the roof repairs/installation, all Safety Data Sheets will need to be provided to the Federal Manager prior to work beginning.

· Standards: All work is to be performed using best installation practices and should meet or exceed all local and international code.

3. Schedule & Milestones

· Period of Performance: Work shall begin within 30 calendar days from the date of contract award. Prior to work beginning, a work plan with timelines should be submitted to the POC detailing how long the project will take as well as key milestones.

4. Financial & Administrative Terms

· Change Orders: Once a contract is awarded, any changes or modifications suggested by the vendor will need to be submitted to the POC for consideration prior to performing any work. Any work performed without authorization may not be funded and will be at the risk of the contractor.

· Inspection and Acceptance: Upon completion, the contractor shall notify the POC for approval and acceptance.

· Warranty: All workmanship must be warranted for a minimum of 10 years from the date of completion approval by the site manager. If any materials have a manufacturer warranty that exceeds the 10-year workmanship warranty, all documentation that supports the manufacturer warranty shall be provided to the POC upon completion of the work in order to get final approval.

· Contractor requirements: All contractors need to be licensed, insured and of legal citizenship to perform work on federal property.

· National Weather Service POC:

Jennifer Dover Sterling Field Support Center 43741 Weather Service Rd Sterling VA, 20166 jennifer.dover@noaa.gov