This Statement of Work (SOW) details a septic system replacement project for the USDA Forest Service Gila National Forest, Reserve Ranger District in New Mexico. The project involves decommissioning and replacing two existing septic systems at the Reserve Ranger Station: one for a three-bedroom house and another for a two-bedroom house. The contractor must design, permit, and install new septic tanks and leach fields according to New Mexico Environment Department (NMED) standards, including site preparation, excavation, tank installation, and system testing.
The solicitation (127EAX25Q0002) is a Small Business Set-Aside for plumbing and construction work under NAICS code 238220, with a Firm Fixed-Price contract to be awarded using a Best Value/Tradeoff evaluation method. Key submission details include: offers due by April 9, 2025, at 2:00 p.m. MDT, with optional site visits on March 27-28, 2025. Contractors must submit technical and business proposals, have an active SAM registration, and meet evaluation criteria for Price, Capability, and Past Performance. The total project must be completed within 30 calendar days of project start, with specific deliverables including functional septic systems, compliance documentation, and a final walkthrough inspection.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Photo.pdf | ||
| QA.Solicitation.xlsx | XLSX spreadsheet | |
| Site Plan.PDF | ||
| 127EAX25Q0002 A00001.pdf | ||
| RFQ 127EAX25Q0002.pdf | ||
| GILA NATIONAL FOREST Industrial Fire Precaution Guidelines 2024.docx | DOCX document | |
| Wage Determination NM20250005.pdf | ||
| Project Map septic.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Construction Specifications and Scope of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnishe | 4 |
| 5.0 Deliverables / Schedule | 4 |
| 6.0 Contractor’s Key Personnel | 5 |
| Attachment | 5 |
Project Replacement of 2 Septic Systems – Middle 3 Bedroom House on Reserve Ranger District and Middle 2 Bedroom House on Reserve Ranger District
General Information
1.0 Scope of Work
The contractor shall decommission and legally dispose of the existing septic systems for each respective building and replace each with a septic tank and a leach field. The contractor shall size the septic system (tank and leach field sizes) according to NMED standards (see appendix A and appendix B for layouts of the buildings as reference). As such, all demolition and construction must comply with New Mexico Environment Department (NMED) standards. Contractor is responsible for blue stake permitting, tools, labor, equipment, supplies, and any additional permitting as required.
2.0 Background
The current septic systems are outdated and non-functional. This contract aims to ensure the new systems meet NMED standards and are consistently and foreseeably functional.
Location: Reserve Ranger Station 5 Smokey Bear Circle, P.O. Box 170, Reserve, New Mexico, 87830 the two buildings are indicated in the below photo with placemarks.
Contractor Requirements/ Construction Specifications
3.0 Technical Requirements / Tasks
1. Mobilization/Demobilization
Tasks:
•Pre-Mobilization Planning:
•Develop and submit a mobilization plan for approval.
•Conduct a site survey to identify access routes, staging areas, and environmental considerations.
•Obtain all required permits for equipment transport and staging.
•Mobilization:
•Deliver necessary equipment to the site, including excavators, trucks, tools, supplies, equipment, and safety gear.
•Set up staging areas for equipment, materials, and temporary facilities (e.g., trailers, portable restrooms if necessary).
•Install site signage for safety and project identification as well as ensure a clean and orderly work site. Contractor is responsible for site security. Should the contractor encounter any findings of archeological significance (bones) at any point during the excavation process, work must cease, and this must be reported immediately to the COR for inspection. Work may only resume once archeological clearance is given by the Forest Service.
•Erect erosion and sediment control measures (e.g., silt fences, wattles) per NMED and EPA guidelines.
Demobilization:
•Remove all temporary facilities and equipment.
•Clean and restore staging areas to pre-construction condition.
•Dispose of waste materials (construction debris, unused supplies) in accordance with NMED standards as well as all applicable local and federal regulations.
•Perform a final site inspection with stakeholders to ensure restoration standards are met.
•Submit demobilization report to the client and relevant authorities.
2. Decommissioning and Disposal of Existing Septic Systems
Tasks:
•Site Assessment:
•Locate and map the two existing septic tanks, distribution boxes, and leach fields.
•Decommissioning/Disposal Process:
•Pump out existing septic tanks and dispose of contents at an approved waste treatment facility.
•Decommission and legally dispose of all materials from each system according to NMED standards.
•Backfill excavated areas with clean fill material.
•Technical Requirements:
•Comply with NMED regulations for septic tank decommissioning.
•Follow OSHA excavation and trenching safety standards.
•Utilize spill containment measures for any hazardous materials encountered.
3. Installation of New Septic Tanks (Per NMED Requirements)
Tasks for each system (2 systems in total):
•Design and Permitting:
•Submit detailed designs to NMED for approval, including tank sizing, location, and connections as required.
•Obtain installation permits as required from NMED and local jurisdictions.
•Site Preparation:
•Clear and grade the area for tank installation, ensuring proper slope for gravity flow.
•Excavate for the septic tank to specified dimensions, accounting for backfill and compaction requirements.
•Tank Installation:
•Install septic tank according to manufacturer specifications and NMED standards.
•Level and secure the tank to prevent shifting or settling.
•Install inlet and outlet connections, including watertight seals to prevent leaks, and cleanout sweeps.
•Backfill around the tank with appropriate material, compacting in layers to prevent settling.
•Technical Requirements:
•Use NMED-approved tanks made of durable materials (e.g., concrete, fiberglass, or plastic).
•Verify tank location meets setback requirements (e.g., distance from structures, wells, and watercourses).
•Ensure all connections meet code requirements, and the systems are free from leaks.
•Install risers and access ports for future maintenance.
4. Installation of New Leach Fields (Per NMED Requirements)
Tasks for each system (2 systems in total):
•Design and Permitting:
•Design leach fields to meet capacity needs and NMED standards.
•Submit plans for leach field design, including trench dimensions and layout, to COR.
•Obtain installation permits.
•Site Preparation:
•Clear vegetation and debris from the leach field area.
•Excavate trenches to the specified depth, width, and grade, ensuring proper spacing between trenches.
•System Installation:
•Lay leach systems in trenches, ensuring proper slope for even effluent distribution.
•Surround pipes with approved backfill material to specified depth.
•Cover aggregate with a geotextile fabric if required to prevent soil infiltration.
•Backfill trenches with clean topsoil, grading the area for drainage.
•Technical Requirements:
•Ensure leach field dimensions meet percolation rates and soil capacity per NMED standards.
•Maintain setback distances from property boundaries, water sources, and structures.
•Incorporate inspection ports for future monitoring of the system as required.
4.0 Government Furnished
The government will provide site access and relevant project documentation (maps, layouts, etc.)
5.0 Deliverables / Schedule
Key Deliverables
| Item No. |
| Deliverable |
| Objective |
| Due |
| 1 |
| 2 Fully functional septic systems to include a leach field and a septic tank. |
| Complete installation of 2 new septic systems including the installation of a new septic tank and a new leach field at each site. |
| Within 30 calendar days of project start. |
| 2 |
| Documentation/Permits showing compliance with NMED Standards |
| Submission of documentation of compliance with NMED standards upon project completion. |
| Within 30 calendar days of project start. |
| 3 |
| Final Walkthrough and inspection with government representative |
| Conduct a final walkthrough and inspection with COR to ensure project completion. |
| Within 30 calendar days of project start. |
6.0 Contractor’s Key Personnel
Contractor must ensure presence of individuals with all necessary qualifications and experience according to NMED, local, and federal standards.
Attachment
Appendix A (Middle 3 Bedroom Building):
Middle three bedroom Sinks 2 (one in bathroom, kitchen) Toilets 1 (one in bathroom) Showers/tub 1 (one in bathroom) Washer hookup 1 (one in laundry room) Dishwasher 1 (one in kitchen)
Appendix B (Middle 2 Bedroom Building):
Middle two bedroom Sinks 3 (one in bathroom, kitchen, and laundry room) Toilets 1 (one in bathroom) Showers/tub 1 (one in bathroom) Washer hookup 1 (one in laundry room) Dishwasher 1 (one in kitchen) image1.png image2.png image3.png image4.png image5.png image6.png image7.png