Statement of Work.docx

DOCX document 19 KB Posted

Attached to
Life Raft Inspection - Rainier Federal contract opportunity
Solicitation number
NM-AN2120-23-01463-1
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This statement of work outlines requirements for conducting an annual inspection of life rafts aboard the NOAA ship RAINIER. The contractor shall inspect and service sixteen total life rafts, including ten 25-person and six 4-person rafts, in accordance with federal regulations. All inspections, repairs, and certifications must be completed between October 30, 2023 and December 16, 2023 at the NOAA ship's homeport facility in Newport, Oregon. The contractor will transport life rafts to and from their inspection facility, replace any expired equipment, and provide new certification documents and a service report upon completion.

View the file

Other files for this federal contract opportunity

Other files attached to Life Raft Inspection - Rainier, newest first.
File Type Posted
Equivalent Rate 113R-23Aug2022.pdf PDF
Wage Determination 2015-5575 rev 21.pdf PDF
RAINIER 2023 Life Raft Annual Inspection -AM- Certification.pdf PDF
FAC 23-04 Provisions and Clauses.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Annual Life Raft Inspection & Certification Scope:

Conduct an annual inspection of NOAA ship RAINIER’s (10ea) 25 person and (6ea) 4 person life rafts.

References:

NOAA Standard Specification AMC-583-1b, “General Requirements for Life Raft Inspections” RAINIER 2023 Life Raft Annual Inspection & Certification 46 CFR Part 160, Subpart 160.151 – Inflatable Life rafts (SOLAS) Government Furnished Materials:

None Requirements:

Provide transport of life rafts to and from inspection facility.

Inspection shall be in accordance with 46 Code of Federal Regulations (CFR) Part 160, Subpart 160.151 – Inflatable Life rafts.

Submit conditions found report (CFR) to Port Engineer for materials, work above and beyond the initial inspection, testing and standard annual maintenance and repair. Photographic evidence is required for single raft repairs exceeding $1,000.

Guarantee workmanship and material against defects for twelve months.

Tasks:

Coordinate with Port Engineer for pickup of life rafts at NOAA facility.

Perform inspections on ten (10) Elliot MK III and six (6) DBC TO life rafts.

Renew all expired items or items nearing expiration.

All replacement pyrotechnic signaling devices (including aerial flares and hand held signals) must be within 9 months of the date of manufacture when replaced on the life rafts during servicing.

Life rafts without a radar reflector will be affixed with a weather proof label that reads “RADAR REFLECTOR NOT INCLUDED” on the life raft case near the manufacturers plate.

Repack re-certified life rafts.

Return life rafts to NOAA ship RAININER (see 1.9.1) Provide three (3) copies (two paper and one electronic) of certificates to Port Engineer.

Quality Assurance:

Submit service and inspection report containing inspections completed, repairs, testing, and replaced materials for each life raft to COR within 5 working days of completion of work.

Period of Performance:

30OCT23 – 16DEC23.

Place of Performance:

Marine Operations Center – Pacific

NOAA ship RAINIER
2002 SE Marine Science Dr

Newport, OR 97365 Notes:

Point of Contact:

Dale D Morrison Port Engineer, NOAA ship RAINIER Office: 541 867 8726 Cell: 757 777 5448 Email: dale.d.morrison@noaa.gov End of Item

File details come from the government source that posted it. Updated .