Statement of Work.docx
DOCX document 19 KB Posted
- Attached to
- Annual Life Raft Inspection - Rainier
- Solicitation number
- NM-AN2120-23-01463
About this file
This statement of work outlines requirements for the annual inspection and certification of life rafts aboard the NOAA ship RAINIER. The contractor shall inspect and service sixteen total life rafts, including renewing expired items and replacing pyrotechnic signaling devices. Inspections must comply with 46 CFR Part 160 and applicable standards. The contractor will transport life rafts, perform inspections at their facility, repack recertified rafts, and return them to the RAINIER by December 16, 2023. The contractor must submit an inspection report within five days and guarantee workmanship and materials for twelve months. The point of contact is Dale Morrison, Port Engineer for the RAINIER.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Equivalent Rate 113R-23Aug2022.pdf | ||
| Wage Determination 2015-5575 rev 21.pdf | ||
| RAINIER 2023 Life Raft Annual Inspection -AM- Certification.pdf | ||
| FAC 23-04 Provisions and Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Annual Life Raft Inspection & Certification Scope:
Conduct an annual inspection of NOAA ship RAINIER’s (10ea) 25 person and (6ea) 4 person life rafts.
References:
NOAA Standard Specification AMC-583-1b, “General Requirements for Life Raft Inspections” RAINIER 2023 Life Raft Annual Inspection & Certification 46 CFR Part 160, Subpart 160.151 – Inflatable Life rafts (SOLAS) Government Furnished Materials:
None Requirements:
Provide transport of life rafts to and from inspection facility.
Inspection shall be in accordance with 46 Code of Federal Regulations (CFR) Part 160, Subpart 160.151 – Inflatable Life rafts.
Submit conditions found report (CFR) to Port Engineer for materials, work above and beyond the initial inspection, testing and standard annual maintenance and repair. Photographic evidence is required for single raft repairs exceeding $1,000.
Guarantee workmanship and material against defects for twelve months.
Tasks:
Coordinate with Port Engineer for pickup of life rafts at NOAA facility.
Perform inspections on ten (10) Elliot MK III and six (6) DBC TO life rafts.
Renew all expired items or items nearing expiration.
All replacement pyrotechnic signaling devices (including aerial flares and hand held signals) must be within 9 months of the date of manufacture when replaced on the life rafts during servicing.
Life rafts without a radar reflector will be affixed with a weather proof label that reads “RADAR REFLECTOR NOT INCLUDED” on the life raft case near the manufacturers plate.
Repack re-certified life rafts.
Return life rafts to NOAA ship RAININER (see 1.9.1) Provide three (3) copies (two paper and one electronic) of certificates to Port Engineer.
Quality Assurance:
Submit service and inspection report containing inspections completed, repairs, testing, and replaced materials for each life raft to COR within 5 working days of completion of work.
Period of Performance:
30OCT23 – 16DEC23.
Place of Performance:
Marine Operations Center – Pacific
| NOAA ship RAINIER |
| 2002 SE Marine Science Dr |
Newport, OR 97365 Notes:
Point of Contact:
Dale D Morrison Port Engineer, NOAA ship RAINIER Office: 541 867 8726 Cell: 757 777 5448 Email: dale.d.morrison@noaa.gov End of Item
File details come from the government source that posted it. Updated .