Statement of Work- Dorm Water Fountains.pdf
PDF 3 MB Posted
- Attached to
- Dorm Water Fountains Installation Federal contract opportunity
- Solicitation number
- FA500020R0032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Statement of Work- Dorm Water Fountains (bldg 7079 updated).pdf | ||
| 07082020- Dorm Water Fountains- Bldg Pictures.pdf | ||
| 07082020- Task ID 7523101 Dorm Water Fountains Q-A.pdf | ||
| 07082020- Dorm Water Fountains- Bldg Pictures.pdf | ||
| Open Market General Specifications.pdf | ||
| Solicitation - FA500020R0032.pdf | ||
| Wage Determination- Alaska.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Install Non-filtered Bottle Filling Stations
1. SCOPE OF WORK: Remove and replace 13 each existing water fountains with 13 each new non-filtered wall mounted bottle filling stations with bubblers. Also, install 2 each new non-filtered wall mounted bottle filling stations with bubblers at 2 new install locations. The contractor must possess the applicable licenses to install all components of each bottle filling station to include repairing any wall damage due to removal and/or install. The contractor will provide all personnel, equipment, supplies, tools, materials, and transportation necessary to install each water station.
2. APPLICABLE DOCUMENTS:
2.1 Installation locations by building (ATTACHMENT 2.1).
2.2 Open Market General Specifications and Contract
Provisions (ATTACHMENT 2.2)
3. REQUIREMENTS: The Contractor will install water fountains as described and shown in the locations by building document.
3.1 The contractor will remove and properly dispose of 13 each replaced water fountains.
3.2 The contractor will install 15 each non-filtered wall mounted bottle filling stations with bubblers to identified walls with favorable site conditions.
3.3 Mount units, install water supply line t-connector with shutoff valve.
Connect to existing power and water source or extend water and power supplies as needed to the 2 new locations.
3.4 Assemble and mount dispenser which includes planning, equipment and material acquisition, area preparation and protection, verifying operation, match existing finishes, setup and cleanup.
3.5 The contractor will provide all necessary equipment for connection of water stations such as plumbing, fittings, valves, and/or P-traps, and new ground-fault circuit interrupters (GFCI).
3.6 The contractor will repair any concrete and/or sheet rock damage.
The contractor will mud and paint after repair.
3.7 The contractor will conduct a flush of the water station for proper function and water pressure after install. Contractor shall adhere to non-filtered wall mounted bottle filling stations with bubblers owner's manual and installation instructions.
3.8 All work shall be performed by a certified or licensed plumber.
3.9 Suspect asbestos containing material shall be tested and mitigated when encountered. Work involving the disturbance or dismantling of asbestos or asbestos containing materials; the demolition of structures containing asbestos; and/or the disposal and removal of asbestos shall also comply with the requirements of 40 CFR, Part 61, Subparts A and M, ETL
1110-1-118 and DA Circular 40-83-4.
Bottle Filling Station Minimum Specifications:
Non-Filtered
Wall Mounted
ADA Compliant Stainless Steel Bubbler
Stainless Steel Drain Surface
No touch activation sensor
Automatic Shut-off timer
Minimum 1.0 GPM Flow Rate
Minimum 7.0 GPH Chilling Rate
Antimicrobial Protection on Plastic Parts
4. PLACE OF PERFORMANCE: Work performed under this contract will be at 15 locations. See locations by building document. Buildings 641, 651, 668, 681, 682, 688, 791, 4995, 7053, 7079, 7113, 8005 and 8119 require water fountains replacements with non-filtered bottle-filling stations with bubblers. Buildings 55 and 649 will need new installs of non-filtered bottle-filling stations with bubblers.
5. PERIOD OF PERFORMANCE: All water stations need to be completed and fully functioning by 1 September 2020. fully functioning by 1 September 2020.
Attachment 2.1
1505641996A Stamp
BUILDING: 641
FLOOR: 1
N
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
AF CONTRACT NO.
AutoCAD SHX Text
CONTRACTOR:
AutoCAD SHX Text
CITY:
AutoCAD SHX Text
STATE:
AutoCAD SHX Text
U.S. AIR FORCE
AutoCAD SHX Text
RESERVED
AutoCAD SHX Text
SIZE:
AutoCAD SHX Text
ANSI
AutoCAD SHX Text D
AutoCAD SHX Text
AF PROJECT NO.
AutoCAD SHX Text
FXSBXXXXXX
AutoCAD SHX Text
AEC FILE NAME:
AutoCAD SHX Text
XXXXXX.DWG
AutoCAD SHX Text
FIRST FLOOR PLAN
AutoCAD SHX Text
BUILDING 641
AutoCAD SHX Text
JBER
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
XX-X.X
AutoCAD SHX Text
DRAWING SCALE:
AutoCAD SHX Text
PLOT SCALE: 1:1
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
PRIME CONTRACTOR
AutoCAD SHX Text
RESIDENT ENGINEER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
RESERVED
AutoCAD SHX Text 1/16" = 1'
AutoCAD SHX Text 5-01-12
AutoCAD SHX Text
FILE CREATED
AutoCAD SHX Text
PA
N
FLOOR: 1
BUILDING: 649
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L E
O
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
03-MAY-12 FILE CREATED
XXX-XXX
xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
A R
C H
I V
E F
I L E
N
U M
B E
R
X-X
NAME
NAME
NAME
NAME
X.DWG
XXXXXXXXXX
DACAXXXXXXXX
XXXXXXXX
3/32"=1'
PROJECT_TITLE
FLOOR 1
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L
E
N
O
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
CONTRACTOR_DESIGNER LOGOS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
05-12 FILE CREATED
PROJECT_TITLE
FLOOR_1
1 4
1/8"=1'
XXXXXXXX
DACAXXXXXXXX
XXXXXXXXXX
X.DWG
NAME
PAUL_AXUP
NAME
NAME
X-X xx-month-xxxx
A R
C H
I V
E
F I L
E
N U
M B
E R xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
XXX-XXX
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
CONTRACTOR_DESIGNER LOGOS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
05-12 FILE CREATED
PROJECT_TITLE
FLOOR_1
1 4
1/8"=1'
XXXXXXXX
DACAXXXXXXXX
XXXXXXXXXX
X.DWG
NAME
PAUL_AXUP
NAME
NAME
X-X xx-month-xxxx
A R
C H
I V
E F
I L E
N
U M
B E
R xx - month - xxxx
23-01-2013 xx - month - xxxx xx - month - xxxx
XXX-XXX
UP
UP
UP
UP
UP
FLOOR 1
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
JBER - RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING :
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
15-FEB-2019 FILE CREATED
1 5
1/16"=1'
XXXXXXXX
DACAXXXXXXXX
XXXXXXXXXX
X.DWG
NAME
NAME
NAME
NAME
X-X
A R
C H
I V
E F
I L E
N
U M
B E
R xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
XXX-XXX
FLOOR 1
JBER - RICHARDSON, AK
AutoCAD SHX Text N
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
21-JUN-2012 FILE CREATED
FLOOR 2
XXX-XXX
xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
X-X
NAME
NAME
NAME
NAME
X.DWG
XXXXXXXXXX
DACAXXXXXXXX
XXXXXXXX
1/16"=1'
PROJECT_TITLE
100?
RECYC
STOR
100J
T101100H
E100100G
100N
100E
100C
100D
102104
101103
105107
106108110
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
MM-YY XXXXXXXXXX
XXX-XXX
xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
X-X
NAME
NAME
NAME
NAME
X.DWG
XXXXXXXXXX
DACAXXXXXXXX
XXXXXXXX
1/16"=1'
FLOOR_1
PROJECT_TITLE
AutoCAD SHX Text N
AutoCAD SHX Text
FLOOR: 1
AutoCAD SHX Text
BUILDING: 688
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
CONTRACTOR_DESIGNER LOGOS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
12-12 FILE CREATED
XXX-XXX
xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
A R
C H
I V
E F
I L E
N
U M
B E
R xx-month-xxxx
X-X
NAME
NAME
NAME
NAME
X.DWG
XXXXXXXXXX
DACAXXXXXXXX
XXXXXXXX
1/32"=1'
FLOOR_1
PROJECT_TITLE
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
CONTRACTOR_DESIGNER LOGOS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
Sheet: 1
File: .\JBER.pdf
Missing or invalid reference
I
N
FOR OFFICIAL USE ONLY
FIRST FLOOR PLAN
3/32"=1'-0"
01'2' 4' 8'
SCALE: 3/32" = 1'-0"
16' 32' r:
I I.
T, ·� -
11 -L = 0 I � -ll r l
� ' C c' 111 f
I I
I I I 'II I 11 i 11
<' t:.,, _ I I _ l'I' LJ _[J
"F'C: .Fl F 11,T -FF l IL \J
I.'., -� F,=-c-
·: /I , I, I Jil+f ·.
J2J , ,,, I�/LY=u - I lll _,-- -
_, = l -
ST = nT s� - I I l c- F'FT�EC- II[ c, - ' -.
L _ I LL IL
I I[ fPfR:-J
WI
J u ll __ ll_ 11-·
- f-c. �I llf-c f-cl
=- I F -1 , - F =- B
•Hc.c.
f'.--ff-'
UIL_-.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
AF CONTRACT NO.
AutoCAD SHX Text
CONTRACTOR:
AutoCAD SHX Text
CITY:
AutoCAD SHX Text
STATE:
AutoCAD SHX Text
U.S. AIR FORCE
AutoCAD SHX Text
RESERVED
AutoCAD SHX Text
SIZE:
AutoCAD SHX Text
ANSI
AutoCAD SHX Text D
AutoCAD SHX Text
AF PROJECT NO.
AutoCAD SHX Text
FXSBXXXXXX
AutoCAD SHX Text
AEC FILE NAME:
AutoCAD SHX Text
XXXXXX.DWG
AutoCAD SHX Text
FIRST FLOOR PLAN
AutoCAD SHX Text
BUILDING 7053
AutoCAD SHX Text
ELMENDORF AFB, AK
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
SHEET
AutoCAD SHX Text X
AutoCAD SHX Text
OF
AutoCAD SHX Text X
AutoCAD SHX Text
XX-X.X
AutoCAD SHX Text
DRAWING SCALE:
AutoCAD SHX Text
PLOT SCALE: 1:1
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
PRIME CONTRACTOR
AutoCAD SHX Text
RESIDENT ENGINEER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
RESERVED
AutoCAD SHX Text 1/32" = 1'-0"
AutoCAD SHX Text
LAST CHECKED
AutoCAD SHX Text 11-06
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L
E
N
O
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
CONTRACTOR_DESIGNER LOGOS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
04-13 NEW TITLE BLOCK
XXX-XXX
xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
A R
C H
I V
E
F I L
E
N U
M B
E R xx-month-xxxx
X-X
NAME
NAME
NAME
NAME
X.DWG
XXXXXXXXXX
DACAXXXXXXXX
XXXXXXXX
1/8"=1'
FLOOR_1
PROJECT_TITLE
PRA
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L
E
N
O
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
CONTRACTOR_DESIGNER LOGOS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
11-06 FILE CREATED
XXX-XXX
xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
A R
C H
I V
E
F I L
E
N U
M B
E R xx-month-xxxx
X-X
NAME
NAME
NAME
NAME
X.DWG
XXXXXXXXXX
DACAXXXXXXXX
XXXXXXXX
1/16"=1'
FLOOR_1
PROJECT_TITLE
North
Building 8119
AutoCAD SHX Text
UP
http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text C
AutoCAD SHX Text L http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com http://www.ArchT.com AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text
WELLWORTH
AutoCAD SHX Text K-3422
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
MODULE
AutoCAD SHX Text M102
AutoCAD SHX Text
MODULE
AutoCAD SHX Text M101
AutoCAD SHX Text
MODULE
AutoCAD SHX Text M100
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B108
AutoCAD SHX Text
MAIN ELECTRICAL
AutoCAD SHX Text
ROOM
AutoCAD SHX Text B106
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
ROOM
AutoCAD SHX Text B103
AutoCAD SHX Text
MAIN COMM
AutoCAD SHX Text
ROOM
AutoCAD SHX Text B104
AutoCAD SHX Text
MAIN ENTRY
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text A100
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
STAIR
AutoCAD SHX Text A104
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text A103
AutoCAD SHX Text
MODULE
AutoCAD SHX Text M106
AutoCAD SHX Text
DAYROOM
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text A102
AutoCAD SHX Text
PHONE
AutoCAD SHX Text A107
AutoCAD SHX Text
COMPUTER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text A111
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B108
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
STAIR
AutoCAD SHX Text B100
AutoCAD SHX Text A101
AutoCAD SHX Text A101A
AutoCAD SHX Text A102
AutoCAD SHX Text A100
AutoCAD SHX Text A104
AutoCAD SHX Text A105
AutoCAD SHX Text A107
AutoCAD SHX Text A106
AutoCAD SHX Text A111
AutoCAD SHX Text A109B
AutoCAD SHX Text A109A
AutoCAD SHX Text B106
AutoCAD SHX Text B105
AutoCAD SHX Text B104
AutoCAD SHX Text B103
AutoCAD SHX Text B100
AutoCAD SHX Text B101
AutoCAD SHX Text B103A
AutoCAD SHX Text
PUBLIC
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text A106
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text A105
AutoCAD SHX Text
JANITOR/STORAGE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text B105
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text A101
AutoCAD SHX Text
MODULE
AutoCAD SHX Text M105
AutoCAD SHX Text
MODULE
AutoCAD SHX Text M104
AutoCAD SHX Text
MODULE
AutoCAD SHX Text M103
AutoCAD SHX Text A104A
AutoCAD SHX Text B102
AutoCAD SHX Text
RECYCLE
AutoCAD SHX Text
ROOM
AutoCAD SHX Text B102
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
ENTRY
AutoCAD SHX Text B101
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B108
AutoCAD SHX Text
MANAGER
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text A110
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text A109
AutoCAD SHX Text A110
A B C D E F G H
SHEET
REFERENCE
NUMBER
SHEET OF
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L
E
N
O
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
RECORD
AS-BUILT
DRAWINGS
CONTRACTOR_DESIGNER LOGOS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
10-06 LAST CHECKED
XXX-XXX
xx - month - xxxx xx - month - xxxx xx - month - xxxx xx - month - xxxx
A R
C H
I V
E
F I L
E
N U
M B
E R xx-month-xxxx
X-X
NAME
NAME
NAME
NAME
X.DWG
XXXXXXXXXX
DACAXXXXXXXX
XXXXXXXX
1/16"=1'
FLOOR_1
PROJECT_TITLE
1505641996A Stamp
OPEN MARKET CONSTRUCTION CONTRACT
GENERAL SPECIFICATIONS AND CONTRACT PROVISIONS
OPEN MARKET CONSTRUCTION
CONTRACT
Joint Base Elmendorf-Richardson, Alaska
GENERAL SPECIFICATIONS
AND
CONTRACT PROVISIONS
14 November 2019
TABLE OF CONTENTS
SECTION DESCRIPTION PAGES
01000 GENERAL CONTRACT REQUIREMENTS 3 thru 5
01100 GENERAL SITE REQUIREMENTS 6 thru 17
01500 ENVIRONMENTAL CONTROLS 18 thru 24
01600 MANAGEMENT OF HAZARDOUS WASTE 25 thru 32
01700 HAZARDOUS MATERIALS USAGE TRACKING
FORM INSTRUCTIONS
33 thru 35
Section 01000 General Contract Requirements
1. Contract Description
1.1. The contract description is fully explained in the Statement of Work, Performance Work Statement or Statement of Objectives and all associated drawings and other attachments. The following are the general specifications and contract provisions that supplement and further outline the contractual and administrative actions required. If there are any questions regarding the information contained herein they should be addressed at the site visit or during the questions and answers period identified in the solicitation.
2. Contract Requirements
2.1.1 Drawings. When required, design drawings submitted by the Contractor shall show the basic layout and planning of work. Shop drawings shall show in detail the proposed fabrication and assembly of structural elements and/or the installation (i.e. form fit, and attachment details) of materials or equipment. Drawings must have sufficient detail to enable both the Contractor and the Government to understand the work to be accomplished. For the purpose of this requirement, the term drawings includes actual construction drawings, shop drawings, fabrication drawings, erection drawings, diagrams, layouts, schematics, descriptive literature, illustrations, room finish schedules, lighting/panel schedules, lighting level analysis plans, load/distribution schedules/calculations, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions as may be required.
2.1.2 Schedule of Material Submittals. The Contractor shall provide as a minimum, all submittals identified in the AF Form 66, Schedule of Material Submittals. The submittals shall include all reports, construction materials, and documentation that have a material effect on the construction effort including, but not limited to: large purchase items; long-lead items; required reports; and as-built drawings.
2.2 Meetings and Conferences
2.2.1 Pre-Construction Conference: The Contractor shall schedule a pre-construction conference prior to issuing a start work notice on any project, unless the requirement is waived by the Government. The Contractor shall reach out to the Project Manager and Contracting Specialist assigned to the project to schedule the meeting. The Project Manager will coordinate attendance of the Project Inspector, Base Environmental, the customer and any other applicable government party. The meeting shall be Contractor led and will discuss all aspects of the required work for a purchase order. At a minimum there should be a review of all material submittals, drawings, SOW review, schedule review, safety and accident protection, coordination’s required, HAZMAT and Universal Waste storage/disposal, administrative issues, traffic control, as-built criteria, performance requirements, security procedures, and any questions the Contractor may have. Plan on these meetings taking about 60 minutes.
3. Working Hours-
3.1 Standard Working Hours. Monday through Friday, 7:30 a.m. to 4:30 p.m, excluding Saturdays, Sundays, and Federal Holidays. If the contractor desires to work during non-standard working hours, on a standard working hour’s purchase order, additional Government inspection forces may be required. The contractor shall notify the Contracting Officer and Inspector in writing by email, three working days in advance of his/her intention to work during periods other than Standard Working Hours.
3.1.1 This notification shall allow the inquiry into the availability of additional Government Inspectors. If the Contracting Officer confirms that additional Government Inspectors are reasonably available, the Contracting Officer may authorize the contractor to perform work during periods other than standard working hours. However, if the Government Inspectors are required to perform in excess of their normal duty days solely for the benefit of the contractor, the actual cost of inspection at overtime rates may be charged to the contractor.
4. Submittals
4.1. Upon issuance of a Purchase Order, the contractor shall provide submittals as required by the specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings.
Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
4.2. All submittals shall be submitted on an Air Force Form 3000 Material Approval Submittal (20030901 version or most current version).
4.2.1. The contractor shall fill out the AF 3000 listing of equipment and materials that are required; this list may not be all inclusive and additional submittals may be required. Submit the material submittals and shop drawings to the Contracting Officer for approval within fourteen (14) calendar days after issuance of the Notice to Proceed for each purchase order unless otherwise specified in the AF66. If additional time is required by the contractor to provide specific submittals, the contractor shall identify the submittals requiring the time extension and request an extension from the Contracting Officer; including the reason for the needed time extension and the date the submittals will be provided. The extension must be approved by the Contracting Officer.
4.3. Submittals shall include items such as: contractor’s work plans / schedules, material submittal register, samples, brochures, manufacturers data, product data sheets, shop drawings and/or certificates of materials (relative to the construction execution), contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list);
certifications; warranties; Hazardous Materials Safety Data Sheets, and other such required submittals.
4.4. Contractor shall plan for, and submit all submittals requiring Government approval prior to the acquisition of the material or equipment covered thereby. If the material submittals provided are in variance from the design criteria and/or contract specifications, the contractor shall describe such variations in writing at the time of submission and request a variance from the design criteria and/or contract specifications in accordance with the terms and conditions of the contract. Failure to provide such notification will not relieve the contractor from his responsibility of meeting the design criteria and/or contract specifications regardless of whether or not the submittal is approved by the Government.
4.5. Submittal Classifications: Submittals are classified as follows:
4.6.1. Government Approved: Governmental approval is required for critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as indicated on the Submittal Register or as designated by the Contracting Officer. Within the terms of the Contract Clause entitled “Specifications and Drawings for Construction,” they are considered to be “shop drawings”.
4.6.2. Approved Submittals: The Contracting Officer’s approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailed and other information are satisfactory. Approval will not relieve the contractor of the responsibility for any error that may exist.
4.6.3. Disapproved Submittals: The contractor shall make all corrections required by the Contracting
Officer and furnish a corrected submittal. Corrected submittals shall be submitted within three (3) working days, or as required by the disapproved submittal, after receipt of disapproval, in the form and number of copies specified for the initial submittal. If the contractor considers any correction indicated on the submittals to constitute a contract change a notice shall be given promptly to the Contracting Officer.
5. Interruption of Work
5.1. If it becomes necessary to interrupt work activities in buildings and/or areas for construction purposes
(except as otherwise described in the purchase order), the contractor shall request permission, in writing, from the Contracting Officer no less than twenty one (21) working days in advance. The contractor shall submit written requests for approved street closings no less than twenty one (21) working days prior to closing of the street. Requests shall stipulate the location of the work, the time at which the shutdown will occur, and the duration of the closure. Closures shall be kept to a minimum both in number and duration. Where multiple closures are required, as many as can be accurately scheduled shall be submitted as a group. Contractor must receive written approval of any requested interruption or closure plan prior to implementing the requested closure.
6. Project Coordination
6.1 Temporary construction. Any contractor installed temporary construction intended to prevent interruption of normal work activity or loss of utility services is subject to approval of the Base Civil Engineer through the Contracting Officer.
6.2 Medical Facilities. The contractor shall coordinate all work in medical facilities through the PM with hospital staff liaison support to minimize interruption of service.
End of Section
Section 01100 General Site Requirements
1. Regulations
1.1. The contractor shall comply with all applicable Federal, State, Local, Air Force, Army, and DOD regulations, including supplements pertaining to safety, traffic control, and fire prevention.
2. Standard Products
2.1. Sustainable Acquisitions: In accordance with FAR 23.4, and the authorities of FAR 23.402, the contractor shall use sustainable environmental materials, including acquisition of bio-based, environmentally preferable, energy- efficient, water-efficient, and recycled-content products. The materials shall be non-ozone depleting and non- toxic odorless products, where such products and services meet project performance requirements. The applicable materials are given by the U.S. EPA Comprehensive Procurement Guidelines and the USDA BioPreferred Catalog. Determination of feasibility of using these materials shall be in accordance with FAR 23.405.
3. Safety
3.1. Compliance with the current U.S. Army Corps of Engineers "Safety and Health Requirements Manual", (EM 385-1-1); Occupational Safety and Health Act (OSHA) standards, and current JBER safety regulations is mandatory. The prime contractor shall be held responsible to insure that his/her workforce and any subcontractor or supplier workforce comply with the above safety requirements.
3.2. JBER has a hospital on site should an injury occur, base medical staff can provide emergency medical treatment. Follow-on care after initial emergency treatment will not be provided. The contractor shall be required to reimburse the Government at an established rate for non-beneficiaries in accordance with DOD Regulation 6010.15-M.
3.3. Hazardous Materials: The contractor shall bring to the attention of the Contracting Officer any previously known material suspected of being hazardous which they encounter during execution of work.
A determination will be made by the Contracting Officer as to whether the contractor shall perform tests to determine if the material is hazardous. If the Contracting Officer directs the contractor to perform tests, and/or if the material is found hazardous and additional protective measures are needed, a contract change may be required, subject to equitable adjustment under the terms of the contract.
3.4. Hazardous Material Handling: All work, including the handling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 29 CFR 1926/1910. Work involving the disturbance or dismantling of asbestos or asbestos containing materials; the demolition of structures containing asbestos; and/or the disposal and removal of asbestos shall also comply with the requirements of 40 CFR, Part 61, Subparts A and M, ETL 1110-1-118 and DA Circular 40-83-4. All work shall comply with applicable state and local safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply. The contractor or any of his subcontractors responsible for handling hazardous and toxic materials shall have the necessary certification before doing so.
3.5. Contractor Responsibility: The contractor shall assume full responsibility and liability for compliance with the applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his part or that of his employees or subcontractors, which results in illness, injury, or death.
3.6. Materials and Equipment: Special facilities, devices, equipment, clothing, and similar items used by the contractor in the execution of work shall comply with the applicable regulations.
3.7. Special Safety Requirements: The contractor shall comply with Air Force and local fire regulations and
NFPA 241-2019 "Safeguarding Building Construction and Demolition Operations." Fire extinguishers rated and approved by the National Fire Protection Association, of sufficient size, type, and quantity to cope with all known hazards shall be provided by the contractor at the construction site during the execution of this contract; the extinguishers shall be removed upon acceptance of the project.
4. Operations and Storage Areas
4.1. Project Specific Operations and Storage Area(s). Project-specific operations and storage areas will be provided at the job site, if available, when requested in writing to the Contracting Officer. These sites will only be used for storage of equipment and materials for execution of project requirements associated with each Purchase Order. The requirement for operations and storage areas (staging areas) associated with a Purchase Order shall be dependent upon the size of project and in accordance with specific criteria as detailed in the Purchase Order. Prior to starting the work, the contractor shall submit a site plan to the Contracting Officer for approval, showing the layout and details of all temporary facilities planned for use. The plan shall include the location of the safety and construction fences, location of all site trailers, equipment and material storage areas, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas as required. Site photographs prior to the start of work may be included with the plan. At completion of work, the contractor shall remove the facilities and restore the site to its original condition.
4.2. All contractor trailers, stored materials, and idle equipment shall be located in the designated operations and storage area. The storage area shall be kept clean and orderly. Tarps are to be used, as necessary, to secure loose materials. The on-site representative of the Contracting Officer is the sole judge as to what constitutes an acceptable operations and storage area.
4.3. Dumpsters with lockable lids covering the entire top may be located outside the operations and storage area, but must be sited as approved by the on-site representative of the Contracting Officer. Any movement of a dumpster to another area on the project site must be approved by the Contracting Officer.
The Government will not be responsible for other entities illegally disposing of trash in unsecured construction dumpsters.
4.4. All items in the operations and storage area shall be removed within five (5) days of contract completion.
5. Vehicles, Pass & Identification, Security Requirements
5.1. Search, Inspection, and Seizure. All vehicles, personnel, and hand-carried items, entering or exiting any base control point, or while on the base, are subject to search and inspection and seizure of any prohibited item, at any time. Random, unannounced, and regular searches and inspections can be conducted. These searches and inspections are intended to assure prohibited articles are not introduced into, and government property is not removed from the base or its facilities. These delays will not be charged to the Government, as they are to be expected entry procedures for the installation. Delays entering the installation can be experienced during military exercises and increased threat postures; the contractor assumes all liabilities associated with such delays.
5.2. Parking. Parking of the contractor's vehicles shall be restricted to the area of work. The company name shall be prominently displayed on all construction vehicles parked where work is being accomplished.
5.3. Driver's Licenses. All persons entering or working on JBER that are required to operate a motor vehicle shall possess a valid Driver's License. For personnel operating specialized equipment, a Commercial Driver’s License (CDL) is required as appropriate.
5.4. The use of seatbelts by all vehicle operators and passengers is mandatory on JBER. Vehicle operators caught not wearing seatbelts will lose their driving privileges, subject to laws governing Military and Civilian Employees.
5.5. On-base contractor employees shall ensure the following pass and identification items required for contract performance, are obtained for employees and non-government owned vehicles.
5.6. Base Access. All contractor personnel are required to pass security checks prior to being issued a base pass allowing them access to JBER. The Contracting Officer or his designated representative will provide instructions and forms for the contractor to fill out and return to the Contracting or Civil Engineer office.
These will be reviewed and forwarded to the security office for approval. Once approval/disapproval has been received, they will be forwarded to the contractor. This will be notice that the employees may go to the visitor’s center and get their access pass.
5.7. Anti-Terrorism Training Requirement. All Contractor personnel that require “routine” physical access to JBER are required to accomplish Antiterrorism Awareness Training for Contractors IAW DFARS Subpart 204.7200 and implemented by DFARS Clause 252.204-7004. “Routine physical access” is defined as any Contractor personnel requiring a 60 day or longer base access pass for the performance until an individual TO or for their cumulative efforts on multiple TOs. Training certificates must be included for all employees being submitted for a base access pass 60 days or longer or the request will not be processed.
5.7.1. Contractor personnel can access the computer based training by taking the following steps:
5.7.2. Go to https://jko.jten.mil/
5.7.3. Click on JKO Enter JKO
5.7.4. Click on “Non-CAC users click here(i.e. Family Members, Dependents, Contractors w/o JKO Accounts), under JS_US007: Level I Antiterrorism Awareness Training.”
5.7.5. Insert First and Last Name for the certificate and begin the training (Name used for AT training should match the name as submitted on the base access request form to prevent delays.)
5.7.6. In the event personnel cannot complete this training online, instructor-led training can be coordinated.
The Contractor must coordinate with the CO and Government PM or inspector to schedule a training for all required personnel with a base Antiterrorism officer. Upon completion of the training, the Contractor is required to submit the completed certificates with the base pass access request package.
5.8. FPCON Restrictions. Access to Base may be restricted dependent upon the established ‘FPCON’ level at any time during the execution of the Purchase Order. Contractor shall be issued badge and vehicle pass allowing normal access to the Base throughout FPCON levels ‘A’ and ‘B’. Increased FPCON levels approaching ‘C’ and/or ‘D’ shall be more restrictive, requiring further confirmation of current security requirements as provided by Contracting Officer.
5.9. Large Commercial Vehicle Access. All commercial and company marked vehicles 1-ton and larger must enter the installation through Post Road Gate. Vehicle operators must have authorized base access credentials to access the installation. Drivers will be required to open all vehicle compartments and will be moved to a location out of sight of the inspection. If a compartment is sealed the seal will be broken and can be resealed after inspection is conducted. A Security Forces member will sign documentation stating the seal was broken. Major delays frequently occur during peak traffic times, wait times in line can be up to or exceed one (1) hour. Actual vehicle inspection takes approximately 10 minutes. Additional delays will take place if a contractor fails to have proper documentation for their vehicle or fails to pass the vetting process, i.e., has warrants or criminal history that does not meet our entry matrix. These delays do not entitle the Contractor to a claim unless there are unusual circumstances that cause delays significantly longer than identified above.
5.9.1. Small Commercial Vehicle Access. Vehicles smaller than 1-ton will be allowed entry through any open installation entry control point.
5.9.2 Weather. Occasionally weather dictates early release, late report, or complete base closure resulting in absence of JBER personnel. When such weather conditions cause one of the above situations, contractor personnel will be denied access to the base, unless they have been notified by the Contracting Officer their contract service has been determined essential. Denied access in these situations will result in no additional cost to the Government.
5.9.2.1 Some of the following radio and television stations broadcast and monitor JBER closing and late reporting information: KFQD (750 AM), KENI (650 AM), KWHL (106.5 FM), KTVA (TV CH 11), KIMO (TV CH 13), JBER Facebook, JBER Connect App (iOS or Android), JBER homepage (http://www.jber.jb.mil) or 907-552-INFO.
5.10 Retrieving Identification Media. The contractor shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires; e.g., terminated for cause, retirement, etc.
6. Security Requirements
6.1. The contractor shall comply with security requirements imposed by the Installation Commander and/or the agency occupying the space where work is to be performed, including any necessary security clearances. Prior to mobilization the contractor shall provide the Contracting Officer or authorized representative a list of personnel requiring authority to work on JBER. The list shall be kept current and the Contracting Officer or authorized representative shall be notified as to any changes in the list.
6.1.1. Additional Security Requirements: In accordance with DOD 5200.1-R, and AFI 31-401, the contractor shall comply with requirements identified in AFSSI 9100, Communications Security (COMSEC), Command, Control, Communications and Computer (C4) Systems Security, Security Awareness Training Education (SATE), and Operations Security (OPSEC).
6.2. Reporting Requirements. The contractor shall comply with AFI 71-101VI, "Criminal Investigations Program" requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DOD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
6.3. Traffic Laws. The contractor and its employees shall comply with base traffic regulations.
6.4. Cell Phone Use While Driving. COMPACAF Policy prohibits cell phone use while operating motor vehicles on PACAF installations. Vehicle operators on all PACAF installations will not use cell phones unless the vehicle is safely parked or they are using a hands-free device. A violation of this nature will result in the loss of on-base driving privileges for 30 days.
6.5. Key Control. The contractor shall establish and implement methods of making sure all keys issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the Government.
6.5.1. The contractor shall immediately report to the Contracting Officer any occurrences of lost or duplicated keys.
6.5.2. In the event keys, other than master keys, are lost or duplicated, the contractor may be required, upon written direction of the Contracting Officer, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system and the total cost deducted from the progress payment due the contractor.
6.5.3. The contractor shall prohibit the use of keys, issued by the government, by any persons other than the contractor's employees and the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in performance of contract work requirements in those areas.
6.6. Lock Combinations. The contractor shall control access to all government provided lock combinations to preclude unauthorized entry.
6.7. Controlled/Restricted Areas/Free Zones. To establish a free zone in a controlled or restricted area the Contractor shall coordinate with the Government project inspector or designated user to coordinate with the 673 SFS/S5PN to establish the free zone.
7. Contractor’s Telephone
7.1. The contractor shall provide the Contracting Officer with a telephone number at which the contractor, or his/her representative, may be contacted at any time during standard working hours.
7.2. Emergency Phone Number: An after standard hours emergency telephone number for the contractor shall be provided to the Contracting Officer or his/her authorized representative. The emergency telephone number shall also be posted on the sign near the entrance to each project staging area/entrance. Updates shall be provided to the Contracting Officer, or his/her authorized representative within 24 hours of the change.
7.3. Communications Security (COMSEC): All communication with Department of Defense (DOD) organizations are subject to COMSEC review. Contractor personnel will be aware that telecommunications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized monitoring of the military phone calls originating from or terminating at DOD organizations. Therefore, civilian contractor personnel are advised that any time they place a call to or receive a call from a USAF organization, they are subject to COMSEC procedures. The contractor shall assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DOD information.
8. Employee Standards
8.1. The Contracting Officer may, in writing, require the contractor to remove from the site any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable. The following shall apply:
8.1.1. All work under this contract shall be performed in a skillful, workmanlike, and professional manner.
8.1.2. Proper Attire: Improper attire, i.e. attire not providing sufficient safety protection and a professional appearance (minimum of long trousers, shirt and shoes) will be reported to the Ground Safety Office and the Contracting Officer respectively. In addition, no profane, illegal, offensive or discriminatory language/symbols shall be displayed.
8.1.3. Subcontractors: The Government shall not exercise any supervision or control over the contractor's employees performing service under this contract; such employees shall be accountable not to the Government, but solely to the contractor, who in turn, is responsible to the Government.
8.1.4. Unauthorized Personnel: Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
9. Prohibited Items
9.1. Certain items are prohibited on base. Personnel who are found to be in possession of prohibited items will be challenged and the item confiscated pending an investigation.