This document is a Statement of Work (SOW) for Confined Space Entry Equipment required by the Oklahoma Army Aviation Office. The SOW outlines the need for equipment that complies with OSHA standards to perform maintenance tasks on UH-60 helicopters. The required equipment includes portable air pumps, closed-hood respirators, portable CO2 monitors, CO calibration kits, air quality monitors, and 50 ft of airline. The Government has issued Solicitation W912L6-24-R-4539 as a Request for Proposal (RFP) for a Firm Fixed Price contract to provide the specified equipment. This is a small business set-aside under NAICS code 333998 with a delivery date within 30 days of contract award. Proposals are due by August 14, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver: Mar 2013

Statement of Work (SOW)

1. INTRODUCTION: The Oklahoma Army Aviation Office requires Confined Space Entry Equipment to perform maintenance tasks as required on the UH-60 family of helicopters supported at the Army Aviation Support facilities in Lexington and Tulsa.

2. BACKGROUND: The equipment is required to comply with OSHA Standards within CFR PART 129-

1910.146 and Army regulations in AR 385-10. This is required employee safety equipment that is needed to perform maintenance tasks on the Fuel cell of the UH-60 helicopter.

3. SCOPE: The contractor shall provide new Confided Space Entry Equipment that will allow maintenance personnel to enter a confined space to perform work. The equipment should be capable of suppling filtered and regulated forced air for up to 2 employees with a standalone pump. Additional requirements for this kit will be equipment to test air quality and equipment to calibrate the air quality testers. The air supplies lines for this equipment should be at least 50 feet in length.

4. REQUIREMENTS: The contractor shall provide equipment that meets the requirements outlined in paragraph 4.2 and conforms to OSHA Standards within CFR PART 129-1910.146

4.1. Reserved

4.2 Salient Features:

Customer requires two Confined Space Entry Kits to be used in two separate locations consisting of portable cool-air pumps capable of supporting 2 closed hood style respirators that operates on common 120V AC power. The kits should include a portable CO2 monitor to insure forced air is with allowable limits and will also alert the users if there is dangerous CO or CO2 levels. The customer also requires equipment the will allow the end user to test the confined space for dangerous gases as outlined in OSHA Standard 29- 190-146 before entry. Customer will require the ability to calibrate the provided CO2 tester or monitor and the air quality tester in house without the need to for external support or manufacture assistance.

5. DELIVERABLES:

Description Reference Delivery Date 2 each - Air Pumps 4.2 Within 30 days of contract award date

4 assembles- Closed Hood Style Respirator 4.2 Within 30 days of contract award date 2 each- Portable CO Monitors 4.2 Within 30 days of contract award date

2 each - CO Calibration Kit 4.2 Within 30 days of contract award date 50FT of Airline w/ applicable fittings to support 4 users 4.2 Within 30 days of contract award date

2 each - Four Gas Capability Air Quality Monitor, User worn 4.2 Within 30 days of contract award date