This is a Statement of Work (SOW) for carpet removal and installation services at Patrick Space Force Base, Florida, effective August 6, 2026. The contractor must remove existing carpet and furnish/install new commercial-grade modular traction-backed carpet tile in four buildings: Building 938 (except Room 5), Building 1060 Wing A, Building 1060 Wing C, and Building 1350. The total scope encompasses approximately 1,331 square yards of new carpet across multiple rooms and common areas. The contractor is responsible for all labor, supervision, equipment, tools, transportation, materials, accessories, and incidentals necessary for complete project execution, including furniture movement, substrate preparation, adhesive application, and daily cleanup.
Specific carpet materials are designated by building: Building 938 requires 163 square yards of Milliken Southern Analog-Voltage VT317 Vignette; Buildings 1060 A and C Wings require 580 and 316 square yards respectively of Milliken Textured Sky-Rainmaker RNM208-67 STRATUS; and Building 1350 requires 106 square yards of Milliken Textured Sky-Horizon Line Nightfall HRZ218-27. All materials must be new, commercial-duty rated, free from defects, and installed per manufacturer specifications. Work shall be performed Monday through Friday, 0730–1630 hours, excluding federal holidays and base closure days. The contractor must coordinate phased work with Government personnel, maintain safe working conditions compliant with OSHA and installation standards, obtain required base access credentials for all personnel and equipment, perform quality inspections to address deficiencies at no additional cost, and return all excess carpet tile to the Government upon project completion. Final cleanup and debris removal off-base are required prior to Government acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Carpet Questions V2.pdf | ||
| Solicitation_26QB144_Rev1.pdf | ||
| Carpet Questions V1.docx | DOCX document | |
| D and F Below SAT_26QB144.pdf | ||
| USAF Carpet II Program Ordering Guide (Jan 23).pdf | ||
| Solicitation_26QB144.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
For
Buildings 938, 1060 A and C Wings, and 1350
Carpet Removal and New Install
August 6, 2026
Prepared by
SSgt Timberlake & Rocky Mazzone
45 CES/CEOER
Patrick SFB, Florida 32925
Table of Contents
1.0 SCOPE OF WORK
2.0 AREAS AND MATERIALS
2.1 AREAS
2.2 MATERIALS
3.0 EXECUTION
3.1 SCHEDULING
3.2 WORKING HOURS
3.3 INSTALLATION REQUIREMENTS
3.4 PHASED WORK EXECUTION
3.5 QUALITY ASSURANCE / INSPECTION
3.6 CONTRACTOR RESPONSIBILITY
4.0 CLEANUP
5.0 BASE ACCESS
6.0 REGULATIONS AND STANDARDS
7.0 TRASH AND LITTER CONTROL
8.0 NO SMOKING POLICY
1.0 SCOPE OF WORK
1.0.1 The contractor shall provide all labor, supervision, equipment, tools, transportation, materials, accessories, and incidentals necessary to remove existing carpet and furnish/install new commercial carpet tile in designated facilities at Patrick Space Force Base.
1.0.2 Work includes the following facilities:
1.0.2.1 Building 938 Except Room 5
1.0.2.2 Building 1060 – Wing A
1.0.2.3 Building 1060 – Wing C
1.0.2.4 Building 1350
1.0.3 The contractor shall field verify all dimensions and quantities prior to procurement and execution. Quantities listed are estimated for planning purposes only.
1.0.4 The contractor shall:
1.0.4.1 Remove and properly dispose of existing carpet materials
1.0.4.2 Prepare substrate surfaces as required for proper installation
1.0.4.3 Furnish and install new commercial carpet tile
1.0.4.4 Provide all adhesives, tools, and installation accessories
1.0.4.5 Move, reset, disassemble, and reassemble furniture as necessary
1.0.4.6 Coordinate phased work with Government personnel
1.0.4.7 Perform daily cleanup
1.0.4.8 Correct deficiencies identified during Government inspection at no additional cost.
1.0.5 The Contractor shall furnish and install new commercial-grade modular traction -backed carpet tile squares, suitable for administrative and office environments.
1.0.5.1 Materials shall include:
1.0.5.1.1 Carpet tile
1.0.5.1.2 Manufacturer-approved adhesive
1.0.5.1.3 Transition strips where required
1.0.5.1.4 Edge finishing materials as needed
1.0.5.2 All materials shall be:
1.0.5.2.1 New
1.0.5.2.2 Free from defects
1.0.5.2.3 Commercial duty rated
1.0.5.2.4 Suitable for continuous office traffic
1.0.5.2.5 Installed in accordance with manufacturer specifications
2.0 AREAS AND MATERIALS
2.1 AREAS
2.1.1 BUILDING 938
2.1.1.1 Rm 1 (102/104)
Measurements: 13’ 11” X 14’11”
208 SQFT
2.1.1.2 Rm 2 (101)
Measurement: 14’ x14’
196 SQFT
2.1.1.3 Rm 4 (103)
Measurements: 10’x10’
100 SQFT
2.1.1.4 Small Computer Rm (105A)
Measurements: 6’ 5” x9’ 6”
61 SQFT
2.1.1.5 Rm 6 (107)
Measurements: 13’10” x 8’11”
124 SQFT
2.1.1.6 Rm 7 (106)
Measurements: 10’2” x 15’ 4”
156 SQFT
2.1.1.7 Rm 8 (108)
Measurements: 15’1” x 10’4”
156 SQFT
2.1.1.8 Rm 9 (109)
Measurements: 14’10” x 9’ 11
148 SQFT
2.1.1.9 Rm 10 (108)
Measurements: 15’ x12’
180 SQFT
2.1.2 BUILDING 1060 - WING A
2.1.2.1 Requirements Wing
• 1060- 9
240 SQFT
• 1060- 11
98 SQFT
• 1060- 10
100 SQFT
• 1060- 4
99 SQFT
• 1060- 3
97 SQFT
2.1.2.2 Requirements Office
• 1060- 2
120 SQFT
• 1060- 17
123 SQFT
• 1060- 12
125 SQFT
• 1060- 13
123 SQFT
• 1060- 14
123 SQFT
2.1.2.3 Main Entrance
• 1060-1 Common area
948 SQFT
• 1060- 1 Hall 2
737 SQFT
• 1060- 1 Hall 1
453 SQFT
2.1.2.4 South Wing
• 1060- 15
165 SQFT
• 1060- 18
183 SQFT
• 1060- 16
198 SQFT
• 1060- 20
526 SQFT
• 1060- 19
74 SQFT
• 1060- 21
209 SQFT
2.1.3 BUILDING 1060 – WING C
2.1.3.1 1060 C wing
• 1060- 26H
101 SQFT
• 1060- 26G
116 SQFT
• 1060- 1Hall6
531 SQFT
• 1060- 26A
169 SQFT
• 1060- 26B
169 SQFT
• 1060- 26
229 SQFT
2.1.3.2 Operations Section
• 1060- 27C
58 SQFT
• 1060- 1Hall5
570 SQFT
• 1060- 27B
72 SQFT
• 1060-27A
72 SQFT
• 1060-27
123 SQFT
• 1060-27D
54 SQFT
• 1060-27E
78 SQFT
• 1060-27F
78 SQFT
• 1060-27G
78 SQFT
• 1060-27H
83 SQFT
2.1.4 BUILDING 1350
2.1.4.1 Contractor shall remove existing carpet and install new traction-backed carpet tile squares in Building 1350. Work includes designated carpeted spaces identified by the Government.
2.1.4.2 1350
• 1350-106 common area
423 SQFT
• 1350- 106A
50 SQFT
• 1350- 106B
50 SQFT
• 1350- 106C
57 SQFT
• 1350- 106D
59 SQFT
• 1350-106E
58 SQFT
• 1350-106F
58 SQFT
• 1350-107
104 SQFT
2.2 MATERIALS
2.2.1 Contractor shall submit product specifications and material data for Government review and approval prior to procurement.
Table 2.2.2 Materials-Building 938 (Brand Name)
Carpet Type Square Yards Required (Plus 10% Overage)
Milliken, Southern Analog-Voltage VT317 Vignette
148 SY
Plus 10% Overage 15 SY
Total Square Yards 163 SY
Table 2.2.3 Materials-Building 1060 A Wing (Brand Name)
Milliken, Textured Sky-Rainmaker, RNM208-67 STRATUS
527 SY
Plus 10% Overage 53 SY
Total Square Yards 580 SY
Table 2.2.4 Materials-Building 1060 C Wing (Brand Name)
Milliken, Textured Sky-Rainmaker, RNM208-67 STRATUS
287 SY
Plus 10% Overage 29 SY
Total Square Yards 316 SY
Table 2.2.5 Materials-Building 1350 (Brand Name)
Milliken, Textured Sky-Horizon Line, Nightfall HRZ218-27
96 SY
Plus 10% Overage 10 SY
Total Square Yards 106 SY
3.0 EXECUTION
3.1 SCHEDULING
3.1.1 Work shall be coordinated with the Government Project Manager to minimize disruption to facility operations.
3.1.2 The initial storage of the carpet can be in the warehouse of building 1060 C Wing with boxes labelled per building. The carpet for building 1060 A and C wings can remain stored in the warehouse.
3.1.3 Before installation, the carpet for building 938 can be stored in a box, inside the building, to the rear, where the industrial control shop (ICS) is on the 1st floor if it is not on a pallet. If the carpet is on a pallet, it would have to be stored in the butler building, building 896.
3.1.4 Before installation, the carpet for building 1350 can be stored in a box inside the empty office in building 1343 if it is not on a pallet. If the carpet is on a pallet, it would have to be stored in building 1350 for a maximum period of one week. It can be stored behind the rollup door to the front of the building, or the air-conditioned Power Pro bay, near the other rollup door.
3.2 WORKING HOURS
3.2.1 Normal work hours:
3.2.1.1 0730–1630 Monday through Friday
3.2.2 Excluding:
3.2.2.1 Federal holidays
3.2.2.2 Base closure days
3.2.2.3 Government-directed curtailment periods
3.2.3 Alternate work schedules require Contracting Officer approval.
3.3 INSTALLATION REQUIREMENTS
3.3.1 Contractor shall:
3.3.1.1 Remove existing carpet without damaging adjacent finishes
3.3.1.2 Inspect substrate prior to installation
3.3.1.3 Perform floor preparation as necessary
3.3.1.4 Remove adhesive residue, debris, and contaminants
3.3.1.5 Patch minor imperfections as required
3.3.1.6 Install carpet tile in accordance with manufacturer recommendations
3.3.1.7 Maintain alignment and consistent layout patterns
3.3.1.8 Fully adhere all edges and corners
3.3.1.9 Install transitions where required
3.3.1.10 Reset furniture after work completion
3.4 PHASED WORK EXECUTION
3.4.1 The contractor shall coordinate phased work with Government personnel to maintain continuity of operations in occupied facilities.
3.4.2 Work may be required in multiple phases depending on mission requirements.
3.4.3 The Government reserves the right to adjust sequencing as necessary.
3.5 QUALITY ASSURANCE / INSPECTION
3.5.1 Government representatives will inspect completed work.
3.5.1.1 Deficiencies including:
3.5.1.2 Lifted corners
3.5.1.3 Poor adhesion
3.5.1.4 Misalignment
3.5.1.5 Visible damage
3.5.1.6 Incomplete cleanup
3.5.2 Transition deficiencies shall be corrected by the contractor at no additional cost.
3.6 CONTRACTOR RESPONSIBILITY
3.6.1 Contractor shall provide on-site supervision throughout performance.
3.6.2 Contractor is responsible for:
3.6.2.1 Coordination
3.6.2.2 Workmanship quality
3.6.2.3 Personnel conduct
3.6.2.4 Protection of Government property
3.6.2.5 Correction of damage caused by contractor personnel
4.0 CLEANUP
4.0.1 Contractor shall maintain clean work areas throughout project execution.
4.0.2 Requirements:
4.0.2.1 Daily removal of debris
4.0.2.2 Vacuuming completed work areas
4.0.2.3 Removal of demolished carpet materials
4.0.2.4 Proper disposal of all waste materials off base
4.0.2.5 Final cleanup prior to Government acceptance
4.0.3 Facilities shall be returned to clean, usable conditions.
5.0 BASE ACCESS
5.0.1 Contractor shall obtain all required base access credentials for:
5.0.1.1 Employees
5.0.1.2 Subcontractors
5.0.1.3 Vehicles
5.0.1.4 Equipment
5.0.2 Required documentation may include:
5.0.2.1 Valid driver’s license
5.0.2.2 Vehicle registration
5.0.2.3 Proof of insurance
5.0.2.4 Contractor access credentials
5.0.3 Government shall not be responsible for delays caused by contractor access issues.
6.0 REGULATIONS AND STANDARDS
6.0.1 Contractor shall comply with:
6.0.1.1 OSHA Safety Regulations
6.0.1.2 Federal Regulations
6.0.1.3 State Regulations
6.0.1.4 Local Regulations
6.0.1.5 Manufacturer’s Installation Standards
6.0.1.6 Patrick Space Force Base Installation Facilities Standard (IFS)
6.0.1.7 Space Launch Delta 45 Occupational Safety Department’s Construction Services Contract Guide, PSFB/CCSFS/AAAF/Malabar Annex/JDMTA
6.0.2 Contractor shall always maintain a safe working environment.
7.0 TRASH AND LITTER CONTROL
7.0.1 Contractor shall:
7.0.1.2 Control staging of materials
7.0.1.3 Prevent debris accumulation
7.0.1.4 Properly store materials
7.0.1.5 Remove packaging and waste daily
7.0.1.6 Maintain orderly work areas
7.0.1.7 Return excess carpet tile to the government after project completion.
7.0.2 No debris shall remain after completion.
8.0 NO SMOKING POLICY
8.0.1 Smoking is prohibited in Government facilities and designated restricted areas in accordance with installation policy.
| 1.0 SCOPE OF WORK |
| 2.0 AREAS AND MATERIALS |
| 2.1 AREAS |
| 2.2 MATERIALS |
| 3.0 EXECUTION |
| 3.1 SCHEDULING |
| 3.2 WORKING HOURS |
| 3.3 INSTALLATION REQUIREMENTS |
| 3.4 PHASED WORK EXECUTION |
| 3.5 QUALITY ASSURANCE / INSPECTION |
| 3.6 CONTRACTOR RESPONSIBILITY |
| 4.0 CLEANUP |
| 5.0 BASE ACCESS |
| 6.0 REGULATIONS AND STANDARDS |
| 7.0 TRASH AND LITTER CONTROL |
| 8.0 NO SMOKING POLICY |
File details come from the government source that posted it. Updated .