This is a Performance Work Statement for roof replacement services at the U.S. Coast Guard Base Astoria Tongue Point, Building 9, located at 27573 Old US Hwy 30, Astoria, OR 97103. The contractor must replace the existing sheet metal roof using government-furnished materials (NORCLAD Rustic Red 44/22" panels, G1 gables, R3 ridges, custom flashing, self-driller screws, and closure components), remove and dispose of the old roofing materials offsite, and install eight stainless steel working aloft anchor points rated for at least 300 pounds each along the main ridge beam, equidistant from one another. All work must be completed within 40 days of contract award. The contractor is responsible for providing all personnel, equipment (including crane, manlift, or other heavy equipment capable of reaching at least 40 feet high), tools, fall protection plans, and labor. Work hours are Monday through Friday, 8:00 a.m. to 4:00 p.m., unless otherwise approved in writing with at least 24 hours' notice.
The contractor must designate a licensed and certified contract manager fluent in English with full authority over daily operations. All contractor personnel must be U.S. citizens or lawfully admitted permanent residents with valid Real IDs, and the government retains the right to reject any employee deemed a security threat. The contractor must maintain dry conditions inside the building during construction due to fragile mechanical and electrical equipment, handle any interferences with existing electrical fixtures, vents, piping, and structural members, and comply with OSHA and all applicable federal, state, and local safety standards. A one-year warranty on workmanship is required. Invoicing must be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. A mandatory bid walk will be held on Thursday, March 12, 2026, at 9:00 a.m.; no other site visits will be offered. Acceptance will be made by the government's Point of Contact based on contractor-generated documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Response.pdf | ||
| Section K L and M.pdf | ||
| Construction RFO Clauses.pdf | ||
| DAVIS BACON ACT CLATSOP COUNTY WAGE RATES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT – SCOPE OF WORK
U.S. COAST GUARD REPLACE ROOF BUILDING 9 TONGUE POINT
SECTION 1 – GENERAL INFORMATION
1.1 Scope of Work
The contractor shall provide all personnel, equipment, tools, transportation, supervision and other items and services necessary to replace the roof at Base Astoria Tongue Point Building 9, using government furnished materials. The contractor must perform to the standards in this Scope of Work (SOW) contract. All questions regarding this Scope of Work for Services must be sent through the US Coast Guard Contracting Officer.
A bid walk will be offered on Thursday March 12th 2026 at 0900. No other bid walks or site visits will be offered.
1.1.1 Place of Performance
Coast Guard Base Astoria Tongue Point Detachment 27573 Old US Hwy 30 Astoria OR 97103
1.2 Contractor Personnel
1.2.1 Contract Manager
The contractor must have a contract manager who is designated responsible for the performance of the work.
1.2.1.1 The contract manager or alternate(s) must have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.2.1.2 The contact manager and alternate or alternates must be able to read, write, speak, and understand the English language.
1.2.1.3 The contract manager’s firm must be licensed and certified to conduct the work specified within the Scope of Work.
1.2.2 Contractor employees
The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
1.2.2.1 Contactor personnel must present a neat appearance and be easily recognized as contractor employees.
1.2.2.2 The contractor must not employ any person who is an employee of the U. S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U. S. Coast Guard unless such person seeks and receives approval according to U. S. Coast Guard regulations.
1.2.2.3 Each individual employed under the contract shall be a citizen of the United States of America, or an alien who has been lawfully admitted for permanent residence as evidenced by a Permanent Resident Card (USCIS I-551). Any exceptions must be approved by the Department's Chief Security Officer or designee.
1.2.3 Security requirements
Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, while onboard a Coast Guard facility, shall have proper valid identification, specifically a Real ID.
Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition. Prior to commencing work the contractor shall send a roster to the COR which includes the names of the contractor employees who will be onsite, their dates of birth, and their license number.
1.3 Hours of Operation – Projected Date of Completion
The contractor must perform the tasks as required by the SOW under this contract during the following hours: Monday through Friday between 08:00am and 4:00pm unless other time is specified. The contractor shall have all work completed within 40 days of award of contract.
1.3.1 Holidays: If applicable.
1.3.2 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required in section 1.3 above, the contractor must request the same in writing.
Submit written request to the Contracting Point of Contact (POC) a minimum of 24 hours before the requested adjusted work schedule. If the desired schedule change is to be effective on a Monday, the request must be submitted to the (POC) prior to 9:00am on the Friday prior to commencement of work.
1.4 Invoicing
In conjunction with the subject award, proper invoices will be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. IPP is a secure web-based electronic invoicing system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis (FRSTL). IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.
Actions to take:
If you are already enrolled in IPP:
If your company is already registered to use IPP, you will not be required to re-register and you do not need to contact IPP.
If you are NOT already enrolled in IPP:
The point of contact you provided in your SAM.gov registration will receive two emails from ipp.noreply@mail.eroc.twai.gov. Please note that emails from this email address may filter into your spam or junk folder:
1. The first email will have the IPP Logon ID and a link to the IPP application.
2. A second email, which will be sent within 24 hours of the first email, contains a temporary password.
Once your contact receives these emails, please ensure they log into IPP and complete the registration process.
Once registered to use IPP, your company may submit invoices electronically, receive e-mail notifications when requests are paid, view payment history, and access remittance downloads. The e-mail notification of payment is sent when a payment is distributed to your bank account and may include the following payment information: Date of payment, dollar amount, invoice number, paying agency, payee name, and ACH trace number.
Vendor training materials, including a first time login tutorial, are available on the https://www.ipp.gov/ website. Once you have logged in to the IPP application, you will have access to user guides that provide step-by-step instructions for all IPP capabilities, ranging from creating and submitting an invoice to setting up email notifications. Live webinars are held monthly and provide a great opportunity to learn the basic of the system and to call in and ask the IPP team questions about the IPP application.
IPP Customer Support is available to assist users of the system and can answer your questions related to accessing IPP or completing the registration process.
Toll-free number: 866-973-3131 Email address: IPPCustomerSupport@fiscal.treasury.gov Hours of operation: Monday through Friday (excluding bank holidays) from 8:00 am - 6:00 pm ET
SECTION 2 – DEFINITIONS
2.1 General Definitions
When the (SOW), solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulations (FAR), the word or term has the same meaning as the definition as contained in section 2.101 of the FAR. The FAR index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix.
2.1.1 Defective Service: A service or commodity output that does not meet the standard of performance requirement specified in the contract for that service or commodity.
2.1.2 Quality Assurance: A planned and systematic pattern of all government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government assurance functions for a contracted service.
2.1.2 Quality Control: Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements.
2.1.3 Technical Definitions: Not applicable to contract.
SECTION 3 – GOVERNMENT FURNISHED PROPERTY, MATERIALS, AND SERVICES
3.1 General Information:
The Government must provide the facilities, equipment, materials, and services listed here:
3.1.1 On-site parking for contractor vehicles
3.1.2 120V Electricity necessary for use by contractor in conjunction with this contract
3.1.3 Sheet metal roofing material, fasteners, flashing, edging, and top caps
SECTION 4 – CONTRACTOR FURNISHED ITEMS AND SERVICES
Except for those items, services, or commodities specifically stated in section 3 as government furnished, the contractor must furnish everything needed to perform this contract according to all its terms.
SECTION 5 – SPECIFIC TASKS
The contractor shall replace the roof of Base Astoria Tongue Point Building 9 using the materials furnished by the government. In addition, the contractor shall purchase and install eight working aloft anchor points along the roof ridge line. The contractor is responsible for using their own crane, manlift, or other heavy equipment to facilitate this roof replacement. It is recommended that the contractor’s equipment be able to move workers and material at least 40’ high. The contractor is also responsible for implementing their own fall protection plan.
5.1 Selective Removal & Demolition:
5.1.1 The contractor shall remove the existing sheet metal roof on Building 9.
5.1.2 The contractor shall dispose of offsite all roofing materials derived from the removal.
5.2 Sheet Roofing Installation:
5.2.3 The contractor shall install the government furnished sheet metal on the roof using existing beams and purlins to support the sheet metal. All Government furnished materials are shown below in Appendix 1.
5.2.4 To the greatest extent possible, contractor shall match the paneling, overlap, and layout of the new roofing format to the old roofing format.
5.2.3 When roof penetrations are encountered, such as for ventilation or conduit, the contractor shall install the new roofing material and seal around the penetrations to ensure that no water enters the building.
5.3 Roof Anchor installation:
5.3.1 Either before or after the installation of the new sheet metal roofing, the contractor shall install eight
(08) stainless steel working aloft anchor points along the beam of the main ridge. Each anchor point shall be rated for at least 300 pounds and equidistant from one another.
5.3.2 Contractor shall test each anchor point following installation.
5.4 Dry Building Plan:
5.4.1 Due to the presence of fragile mechanical and electrical equipment inside the building, the contractor shall keep the contents of the building dry during construction.
5.5 Interferences:
5.5.1 The contractor shall be responsible for any/all interferences with existing electrical fixtures, electrical components, vents, piping and structural memebrs that may be encountered while completing this SOW.
5.6 Safety:
All work shall be conducted in a safe manner and shall comply with all applicable Federal, State, and local safety standards and requirements. Base Astoria reserves the right to inspect for compliance with safety standards and requirements. The Contractor shall comply with all Federal, State, and local laws, including
OSHA.
5.7 Operations and Storage Facilities:
The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the on-site representative with the concurrence of the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.
5.8 Warranty:
The contractor shall offer a one-year warranty on workmanship.
SECTION 6 – ACCEPTANCE
6.1 Acceptance
6.1.1 Acceptance on behalf of the government will be made by the POC as attested to / witnessed by signatures on the contractor generated document / form per section 6.1. above.
SECTION 7 – APPLICABLE PUBLICATIONS AND FORMS
Publications and forms that apply to the (SOW) are listed below. The publications and forms have been designated as either mandatory or informational. The contractor is obligated to follow those publications and use those forms designated as mandatory to the extent specified in other sections of this (SOW). The contractor must be guided by those publications or use those forms designated as informational to the extent necessary to accomplish requirement in this (SOW).
7.1 Publications
7.1.1 OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction
SECTION 8 – SITE PICTURES
Figure 1: View of roof from inside of the building
Figure 2: View of roof from outside of the building