Statement of Work_Bldg. O-0348 SOW.pdf

PDF 116 KB Posted

Attached to
DC Battery Replacement
Solicitation number
W6R3AA-RO-30203
Issued by

View the file

Other files

File Type Posted
Answer for Vendor Pope Airfield.pdf PDF
Q and A.pdf PDF
Salient Characteristics.pdf PDF
Combined Synopsis_Solicitation_DC Batteries_NETCOM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PROJECT NO. O-0348 power work

FORT BRAGG, NORTH CAROLINA

Special Provisions and General Project Information:

1. Project Title: (Battery replacement) at (O-0348, Fort Bragg, NC), Fort Bragg, North Carolina.

2. Contractor shall remove and replace existing existing batteries: (2)-24 Cell strings of C & D Technologies AT-

23P batteries. The existing rack and DC power cables to the battery location shall be utilized to the greated extent.

3. Upon award the Contractor shall meet the NEC with in (30) day at building O-0348, Fort Bragg NC to discuss site restrictions, site access, material storage and validate existing rack and cable condition for re-use.

4. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform operations necessary for providing

(Battery replacement) at (O-0348, Fort Bragg, NC).

5. The Contractor shall provide and install (48) new 95 amps @ 54VDC batteries compatable to the powerboards and grouped in 24 batteries stacks. Existing batteries will be removed and desposed by the contractor per NEC guidance.

6. Clean up after Servicing: The Contractor shall remove all trash, debris, or surplus materials from the work site at during and at the end of each workday and shall leave the work site clean of all debris when work is completed.

7. Work hours for this project shall be non-standard due to the critical nature of the equipment and it’s mission.

Some work can be done 0800 to 1700 while most could be scheduled 1700 to 0600 on weekends. The NEC will schedule all outages and provide that date/time to the contractor.

8. Project completion for the Project estimated to be 90 days from receipt of the Notice to Proceed.

9. Government Materials –N/A

10. Inspection: Inspection will be by the Network Enterprise Center(NEC), Fort Bragg, North Carolina. The contractor shall notify the COR no later than two days prior to starting work.

11. Warranties: A warranty on workmanship for one year must be provided. Manufacture warranties on the rectifiers and batteries will transfer to the NEC.