STATEMENT OF WORK
PROJECT NO. M-8630 power work
FORT BRAGG, NORTH CAROLINA
Special Provisions and General Project Information:
1. Project Title: (Rectifier & Battery replacement) at (M-8630, Fort Bragg, NC), Fort Bragg, North Carolina.
2. Contractor shall remove and replace existing Lucent Lineage 2000 DC power plant equipped with (10)-50amp rectifiers (PN# PBP1L7GEAA). Current load on system is 149 amps @ 54VDC. Maximum capacity is 500 amps.
Existing Batteries: (3)-24 Cell strings of Deka AVR Unigy II (or Tyco) / AVR 2/95-27L. The existing rack and DC power cables to the battery loacation shall be utilized to the greated extent.
3. Upon award the Contractor shall meet the NEC with in (30) day at building M-8630, Fort Bragg NC to discuss site restrictions, site access, material storage and validate existing rack and cable condition for re-use.
4. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform operations necessary for providing
(Rectifier & Battery replacement) at (M-8630, Fort Bragg, NC).
5. The Contractor shall provide and install new a new Vertiv NetSure 7100 powerboard (or equivalent) equipped with adequate rectifier boards to replace the old (10) – 50amp units. The existing power cabling and pathways could be utilized to the greatest extent possible. The proposed powerboard must be compatible with the existing hardware.
The Contractor shall provide and install (72) new 95 amps @ 54VDC batteries compatable to the powerboards and grouped in 24 batteries stacks. Existing batteries will be removed and desposed by the contractor per NEC guidance.
6. Clean up after Servicing: The Contractor shall remove all trash, debris, or surplus materials from the work site at during and at the end of each workday and shall leave the work site clean of all debris when work is completed.
7. Work hours for this project shall be non-standard due to the critical nature of the equipment and it’s mission.
Some work can be done 0800 to 1700 while most could be scheduled 1700 to 0600 on weekends. The NEC will schedule all outages and provide that date/time to the contractor.
8. Project completion for the Project estimated to be 90 days from receipt of the Notice to Proceed.
9. Government Materials –N/A
10. Inspection: Inspection will be by the Network Enterprise Center(NEC), Fort Bragg, North Carolina. The contractor shall notify the COR no later than two days prior to starting work.
11. Warranties: A warranty on workmanship for one year must be provided. Manufacture warranties on the rectifiers and batteries will transfer to the NEC.