This document is a Statement of Work (SOW) for renewing and sealing the deck covering in two berthing areas aboard the USCG Cutter Midgett. The SOW provides details on the required work, including surface preparation, sealing the deck covering with a cosmetic polymeric system, and adding a slip-resistant aggregate. The total area to be addressed is approximately 600 square feet in two crew staterooms. The work must be completed by December 20, 2024.

The related federal contract opportunity is a solicitation (Solicitation Number: 11708PR250000006) issued by the U.S. Coast Guard for the materials and installation of the epoxy flooring described in the SOW. This is a small business set-aside with a 30-calendar day period of performance. Quotes are due by November 8, 2024, and the award will be made to the lowest priced, technically acceptable offer. Authorized suppliers for the required deck covering system are listed on the Qualified Product Listing for MIL-PRF-24613.

View the file

Other files

File Type Posted
Berthing 1 (1).jpg JPG image
Berthing 1 (3).jpg JPG image
Berthing 2 (4).jpg JPG image
Berthing 1 (2).jpg JPG image
Berthing 2 (3).jpg JPG image
Berthing 2 (2).jpg JPG image
Berthing 2 (1).jpg JPG image
FAR Clauses.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PRODUCT: MIL-PRF-24613, Type I, Class 2, Color: Blue, Chips: White WORK TO BE COMPLETED: Prep & Install product in Crew Stateroom 1-32-3-L and 1-32-4-L. Approximately 300 sqft for each room (600 sqft total).

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew and seal deck covering in compartments listed in Tables 1.

TABLE 1 DECK COVERING SYSTEMs IN berthing areas

location
DECK MTL
AREA

(SQFT)*

SYSTEM/Appendix (sflc std 6341)
system color
NON-SKID**
NOTE

Berthing Area 01-32-3-L

Steel
200
Polymeric Epoxy Resin, Type I, Class 2
Blue w/ white flakes/chips

Slip Resistant Grit

Berthing Area 01-32-4-L Steel

200
Polymeric Epoxy Resin, Type I, Class 2
Blue w/ white flakes/chips

Slip Resistant Grit

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans Coast Guard Drawing 750-WMSL-085-025, Rev -, Compartment Areas & Volumes NSC 3 & Follow (AS3085012) Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior Deck Covering Systems Other References MIL-D-16791G, 2020, Detergents, General Purpose (Liquid, Nonionic) MIL-PRF-24613A, 2017, Deck Covering Materials, Interior, Cosmetic Polymeric MIL-PRF-24667C w/Int. Amendment 1, 2018, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application

3. REQUIREMENTS

3.1 General.

None.

3.1.2 Tech Rep. The Contractor must provide the services of Tech Reps and personnel as follows:

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Vent systems (e.g. trunks, ducts, and pipes) Slip-resistant covering treads Drains, covers, and plugs Closures (e.g. doors, hatches, and scuttles) Outfits, foundations, and fittings Switches, controls, and terminals Sensors and supports (e.g. TLIs) Piping and supports Cables and supports

3.1.5 Work locations. The concerned work areas are listed in Table 1. A POC will be provided to escort contractors to and from the space.

3.1.6 Materials, tools, and services. The Contractor must provide materials, tools, and services to accomplish the requirements in this work item. New components, parts, materials, and paints with the same color, comparable and matching material properties as the existing components/parts. Use references in Sections 1, 2 and SFLC Std Specs for guidance, required materials, and details.

3.1.7 Work plan. The Contractor must provide a work plan (preservation plan including protection plan) for the Deck Covering (Polymeric) Seal listed in Table 1.

3.1.8 Notification. The Contractor must give written notification to the POC 48 hours before starting work on this work item.

3.2 Sealing particulars. The Contractor must seal all surface locations identified in Tables 1 and 2 as follows:

3.2.1 Cleaning. The Contractor must thoroughly clean deck covering surfaces with a suitable cleaning detergent conforming to MIL-D-16791G, and hot water.

3.2.2 Drying. The Contractor must rinse, clean, and dry the deck surfaces until no residue is visible.

3.2.3 Sanding. The Contractor must lightly sand with No. 0 steel wool or No. 60 sandpaper, or mechanically sand the surfaces, to remove the existing sealer coat; avoid damaging the color coating.

3.2.4 Vacuuming. The Contractor must vacuum surfaces thoroughly to remove dust.

3.2.5 Sealing. The Contractor must thoroughly seal the deck covering system with a minimum of two coats of a suitable sealer, in accordance with the deck covering system manufacturer’s recommendations.

3.2.6 Slip-resistance. The Contractor must add an aggregate (e.g. white aluminum oxide or glass beads) to the final seal coat per the deck covering system manufacturer’s recommendation.

3.2.7 Curing. The Contractor must allow sealer to cure for the manufacturer recommended times.

Warning Keep traffic off deck until sealer is cured. The sealing process is complete when the deck has a uniform appearance; i.e., when the surface film is continuous and free of blotchy areas.

4. Additional Info Period of performance:

Completion NLT 20DEC2024 Security Requirements Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, while onboard a Coast Guard facility, shall have proper valid identification. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition.

5. NOTES

4.1 Sealer particulars. Sealer for designated deck covering system(s) may be procured from the deck covering system’s manufacturer.

Authorized suppliers for cosmetic polymeric deck covering systems are listed on the Qualified Product Listing (QPL) 24613 for MIL-PRF-24613

FIGURE 1 COLORFLAKE DECK COVERING LAYERS