Statement_of_Work_-_Attachment_A.pdf

PDF 170 KB Posted

Attached to
Visitor Center HVAC System Planned Maint Federal contract opportunity
Solicitation number
140P6426Q0110
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is an Itemized Tasks attachment from the National Park Service that specifies the maintenance and inspection requirements for multiple HVAC, boiler, pump, and humidification systems.

The document details semi-annual and annual maintenance tasks for the following equipment: one York Chiller with 24 itemized maintenance tasks (mostly semi-annual, with condenser coil washing and oil sampling performed annually); two Riello Boilers with 16 itemized tasks performed annually including burner inspection, hydrostatic testing, safety valve certification, combustion analysis, and annual maintenance kit installation; four Taco Pumps with 6 semi-annual inspection tasks covering leaks, vibration, bearing lubrication, electrical connections, and flow rate verification; one Carrier Air Handler with quarterly filter and belt replacement requirements plus semi-annual and annual inspections of blower assembly, coils, electrical components, condensate drain systems, and system performance parameters; two Condair Humidifiers with semi-annual and annual maintenance including pump unit servicing, solenoid valve testing, humidity sensor calibration, filter replacement, and system disinfection; twelve Titus Variable Air Volume (VAV) boxes with semi-annual and annual testing of damper operation, airflow measurement, control response, and sensor calibration; general system components (pipes, fittings, valves, ducts) requiring semi-annual inspection; and five Modine hanging heaters requiring annual inspection of motors, coils, water control valves, thermostats, and power switches. The tasks encompass performance testing, component cleaning, calibration, leak detection, electrical verification, and comprehensive documentation of all maintenance activities.

View the file

Other files for this federal contract opportunity

Other files attached to Visitor Center HVAC System Planned Maint, newest first.
File Type Posted
Equipment_Data_Plates_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Sol_140P6426Q0110_Amd_0001.pdf PDF
DOL_Wage_Determination.pdf PDF
Sol_140P6426Q0110.pdf PDF
Statement_of_Work.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Park Service U.S. Department of the Interior

Attachment A – Itemized Tasks

York Chiller

Task Semi-

Annual Annually Check chiller operating performance and conduct control tests X

Review operator logs and provides recommendations X Inspect compressor under load/unload conditions and verify capacity controllers X

Inspect condenser and evaporator for cleanliness and performance X

Perform external leak tests X

Inspect and calibrate control systems X

Verify all control setpoints and adjust as needed X

Check for refrigerant and oil leaks, repair if necessary X Test sensors and safety devices (transducers, thermistors, signal transmitters) X

Verify water flow across condenser X

Inspect gauges and thermometers X

Service starter and control panel, clean and tighten connections X

Inspect electrical components (contactors, relays, switches) X

Check filters for pressure drop X

Inspect pressure relief valves and auto air bleeders X

Record operating voltage/current of compressor-motor assembly X

Run diagnostics on motor starter X

Clean/replace contact points (if applicable) X

Run diagnostics on system control panel X

Tighten terminal connections X

Verify data accuracy and setpoints X

Check water flow and pressure drop across condenser and cooler X

Test flow switch operation X

Conduct leak checks X

Wash Condenser Coils with Hot Water X Collect oil sample and submit for testing X

Riello Boiler (2)

Task Semi- Annual Annually Monitor pressure and temperature gauges X Inspect burner flame and flame failure response X Perform bottom blowdown to remove sludge X Observe operating and high-limit controls X Test limit and flame detection controls X Tune burner settings (performed by qualified technician) X Inspect and clean burner cone and combustion chamber X Check fuel pressure settings and regulator operation X Disassemble and inspect LWCO and auxiliary LWCO X Hydrostatic test for leaks in tubes and piping X Clean boiler interior (fire side and water side) X Inspect refractory for damage X Replace or re-certify safety valves X Bubble test fuel train safety shut-off valves X Provide and install annual maintenance kit per unit X Provide and Install condensate neutralizer per unit X Conduct Combustion analyzation of each unit, check for proper operation and adjust to manufacturers specifications. X

Taco Pumps (4)

Semi-

Annual Annually Inspect for water leaks, unusual vibration, or motor noise X Check and replenish grease in motor bearings X Inspect & tighten electrical terminals. X Ensure motor winding and terminal box remain dry and secure X Verify motor orientation and mounting alignment X Check flow rates and ensure operating within nameplate pressure limits X

Carrier Air Handler

Task Quarterly Semi-

Annual Annually General Inspection

Inspect air handler cabinet for signs of damage or corrosion

X

Check for unusual noises or vibrations X Verify secure mounting and connections X Inspect insulation for wear or moisture X

Blower Assembly Inspect blower wheel for dust and debris X Clean blower wheel and housing X Check motor operation and amperage draw X Lubricate motor bearings (if applicable) X Inspect and adjust belt tension (for belt-driven units) X Replace worn belts (recommended every 90 days for commercial units) X

Air Filters

Inspect filters for dirt and damage X Replace disposable filters X Verify proper filter fit and sealing X

Coils Inspect evaporator and heating coils for dirt and corrosion

Clean coil surfaces with approved cleaner X Check for refrigerant leaks or damage X Ensure proper airflow across coils X

Electrical Components Inspect wiring for wear, corrosion, or loose connections

Check control board and relays X Test safety switches and sensors X Verify thermostat operation and calibration X Condensate Drain System X Inspect drain pan for cracks or standing water X Clean drain lines to prevent clogs X Test float switch operation (if installed) X

System Performance Measure supply and return air temperatures X

Check static pressure across the system X Verify airflow matches design specifications X Confirm system cycles properly X Documentation X Record all findings and corrective actions X Note date of service and technician name X Update maintenance log and schedule next inspection X

Condair Humidifiers (2)

Task Semi- Annual Annually System Review

Overall system function test X Inspect nozzle spray patterns X

Pump Unit Filter(s) replacement (Annually) X Check condition of pump X Solenoid valve(s) test X Change gasket kit in high pressure relief X Functional test of the high pressure gauge X Functional test of pressure switch X Test ON/OFF Valve X Inspect electrical connections in control cabinet X

Humidity Sensor(s) Humidity sensor test/adjustment (replace if ±10% deviation) X Max humidity controller check (max hygrostat) X

Controls Unit Transfer relay replacement X Contactor test X Contactor/thermal relay replacement X

Hygiene Bactiquant® test X System disinfection/cleaning X

Titus VAVs (12)

Semi-

Annual Annually Visual inspection of VAV boxes and ductwork for damage or leaks X Check for signs of condensation or water damage X Verify access panels are secure X Test damper operation (open/close response) X Measure and verify airflow against design specs X Inspect control system response to thermostat changes X Check electrical connections and motor operation X Calibrate thermostats and sensors X Inspect actuator and damper linkage for wear or looseness X Verify minimum and maximum damper positions X Check insulation and box integrity X Test pressure sensors and airflow stations X Full system performance review X Recalibrate airflow sensors and controllers X Inspect and clean all internal components X Review and update BAS setpoints and zone configurations X Document all findings and schedule follow-up actions X

General Systems

Pipes, fittings, valves, ducts, dampeners, etc.

Semi-

Annual Annually General inspection of all system components (e.g. valves, insulation, etc.) X

Modine hanging heaters Inspect motor for proper fan operation X Make sure coils are clean X Make sure water control valves are working properly X Check thermostat operation X Check power switch operation X

York Chiller
Riello Boiler (2)
Taco Pumps (4)
Carrier Air Handler
Condair Humidifiers (2)
Titus VAVs (12)
General Systems

File details come from the government source that posted it. Updated .