This is a Statement of Work for an annual sewage testing contract at the Federal Correctional Complex (FCC) Terre Haute. The Federal Bureau of Prisons requires weekly testing of sewage discharge at two lift stations (USP and FCI) to comply with the City of Terre Haute Industrial Pretreatment Program. The contract period runs from October 1, 2026 through September 30, 2027, with four one-year renewal options available. The contractor must provide testing services as an independent contractor without an employer-employee relationship, though performance will be monitored by the government.

The testing requirements include multiple parameters at varying frequencies: Total Biochemical Oxygen Demand, Total Suspended Solids, and pH levels must be tested four times per month using 24-hour composite samples; Oil and Grease (non-polar and polar) and Phosphorus require monthly testing; and heavy metals including Mercury, Ammonia, Arsenic, Cadmium, Chromium, Copper, Lead, Molybdenum, Nickel, Zinc, and Cyanide require semi-annual testing with specified maximum concentration limits. The contractor must supply auto samplers for testing and provide field technician services as needed to complete all required tests. Work location is at FCC Terre Haute, 4700 Bureau Road South, Terre Haute, Indiana 47802. The government reserves the right to make single or multiple awards based on best value evaluation, with past performance being the most important factor. All contractors must be registered in SAM prior to award.

View the file

Other files

File Type Posted
15B41826Q00000003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Annual Water Operator Contract

FCC Terre Haute has the need to contract Sewage testing. The contractor shall provide weekly testing of sewage discharge to comply with the City of Terre Haute Industrial pretreatment program. The contract period will be from October 1, 2026 through September 30, 2027 with four (4) one-year options. All testing will be spaced evenly to fulfill the required frequency at the USP and FCI Lift Stations. The service is a contractual arrangement and not a personnel appointment. Payment is based on the provision of an end product or the accomplishment of a specific result. The service does not constitute an employer/employee relationship. The contractor will not be subject to Government supervision, except for security related matters. However, contractor performance shall be monitored. The contractor shall provide testing at two lift stations at FCC Terre Haute as listed below to comply with mandated framework:

ParameterFrequencyUnitsMaxType
Total biochemical oxygen demand4 per Monthmg/lReport24-hr Composite
Total suspended solids4 per Monthmg/lReport24-hr Composite
pH levels4 per MonthS.U.5-10Grab
Oil and grease (non-polar)1 per Monthmg/l100Grab
Oil and grease (polar)1 per Monthmg/l300Grab
Phosphorus1 per Monthmg/l-----24-hr Composite
Mercury2 per Yearmg/l0.05924-hr Composite
Ammonia2 per Yearmg/lReport24-hr Composite
Arsenic2 per Yearmg/l0.7024-hr Composite
Cadmium2 per Yearmg/l0.8024-hr Composite
Chromium2 per Yearmg/l10.024-hr Composite
Copper2 per Yearmg/l9.024-hr Composite
Lead2 per Yearmg/l1.224-hr Composite
Molybdenum2 per Yearmg/l0.6224-hr Composite
Nickel2 per Yearmg/l0.9524-hr Composite
Zinc2 per Yearmg/l9.024-hr Composite
Cyanide2 per Yearmg/l0.5Grab
Total Toxic Organics2 per Yearmg/l-----Grab
Auto sampler4 per Month + 2 for semi-annual
Industrial pretreatment monitoring2 per Year

Field technician: As needed to complete required tests.

Auto Samplers: Supply auto samplers for testing.