Statement of Work 75 WLIC Spreader Recert.docx
DOCX document 36 KB Posted
- Attached to
- 75' SLEDGE WLIC SLING LIFT RIG RECERTIFICATION
- Solicitation number
- 70Z04026Q60386
About this file
This is a Statement of Work (SOW) for the recertification of a 75-foot WLIC (Wedge Lift Inspection Rig) spreader lift structure. The U.S. Coast Guard Surface Forces Logistics Center is seeking contractor services to conduct comprehensive inspections and certify one lifting rig structure in accordance with SFLC Standard Specification 8634-2022. The certification shall comply with referenced Coast Guard drawings (McLean Drawing LB 72 for the 200-ton spreader frame and McLean Drawing LP15 for lifting plates) and applicable CFR/OSHA requirements. The contractor must determine the appropriate weld inspection type and extent required for certification; however, re-load testing is not required as the lift rig has been previously tested. All work must be performed at USCG Yard in Baltimore, Maryland, with a performance period of May 1-10, 2026.
Deliverables include a comprehensive Certification Report containing Appendix B-2 signed and sealed by a Maryland Professional Engineer, completed Appendices B-23 and B-24 from SFLC STD Spec 8634, an inspection overview, detailed inspection findings with supporting documentation, and a surveyor's endorsement marked as either "SATISFACTORY" or "UNSATISFACTORY" with any contingencies clearly noted. The award is anticipated as a Firm Fixed Price Purchase Order on a best value basis, with payment made via Government Purchase Order (Net 30) only after contracting officer approval. The U.S. Coast Guard will not provide down payments or advanced payments, and the vendor assumes financial responsibility until the order is received and accepted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determinations - 70Z04026P60386.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase Request # 2126406Y6175M86001 Statement of Objectives
WI-001: 75’ WLIC LIFT RIG Recertification
1. SCOPE
1.1 Intent: The Contractor shall provide services to certify 01 lifting rig structure. The slings are NOT part of this certification and are to be certified IAW standard CFR/OSHA requirements.
2. REFERENCES
COAST GUARD DRAWINGS
McLean Drawing LB 72, 200TN Spreader Frame 7/1/14 McLean Drawing LP15, Lifting Plates 15 A, B, C, & D
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), -2022 Drydocking
OTHER REFERENCES – Available post-award upon request
Previous certification reports Docking history Last Non-Destructive Inspection (NDI) Report Last completed load test
3. REQUIREMENTS
3.1 The Contractor shall conduct all necessary inspections required to certify 01 lifting rig constructed in accordance with referenced drawings. Certification shall meet requirements stated within SFLC STD Spec 8634. Certifying Authority shall provide requirements for type of weld inspection and length of weld inspection required for certification. The lift rig has been previously load tested; re-load testing is not required
3.2 .Location: All inspections shall be conducted at USCG Yard, Baltimore MD 21226.
3.3 Period of Performance: All work and applicable deliverables shall be provided between 01 and 10 May, 2026
3.4 Deliverable Requirements: Contractor shall provide a Certification Report, which shall include – at minimum – the following:
3.4.1 Appendix B-2 (of SFLC STD Spec 8634), signed and sealed by a Professional Engineer (State of Maryland)
3.4.2 Appendix B-23 and Appendix B-24 of SFLC STD Spec 8634, completed.
3.4.3 Inspection Overview
3.4.4 Inspection Findings with supporting documentation, as applicable.
3.4.5 Surveyor’s Endorsement, annotated as “SATISFACTORY” or “UNSATISFACTORY”. Any contingencies to endorsement must be clearly noted.