Statement of Work - 70Z03825QB0000051.pdf

PDF 370 KB Posted

Attached to
Repair of the Braking Circuit Relay
Solicitation number
70Z03825QB0000051
Issued by

About this file

This Statement of Work details requirements for repair services of braking circuit relays used on the US Coast Guard's MH-65 aircraft, covering five specific part numbers. The contractor must evaluate and repair components to be Ready for Installation (RFI) condition according to Original Equipment Manufacturer (OEM) specifications.

Key requirements include performing test and evaluation within 15 calendar days of receipt, completing repairs within 30 days, maintaining ISO 9001 or AS9110 quality certification, and holding FAA Part 145, EASA Part 145, or OEM repair facility certification. The contractor must provide all necessary parts, materials, labor, and facilities, though Government Furnished Equipment may be requested if needed. Components found Beyond Economical Repair (BER) require Contracting Officer approval. The work involves thorough cleaning, corrosion removal, parts replacement as needed, and detailed failure reporting. Special handling is required for hazardous materials like hexavalent chromium, cadmium and lead. All repaired parts must be certified airworthy with appropriate documentation including Certificates of Conformance and complete ownership history.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

REPAIR OF BRAKING CIRCUIT RELAYS

PCN: 70Z03825QB0000051

Contractor Requirements

1. This requirement is for the evaluation and repair of the braking circuit relays listed in the following table utilized on the United States Coast Guard (USCG)’s MH-65 aircraft.

Description Part Number(s) National Stock

Number(s) OEM Cage

Code(s) Braking Circuit Relays D24AB1041 1630-14-435-1982 F6184 or F0296 Braking Circuit Relays 704A44820011 1630-14-435-1982 F0210 Braking Circuit Relays D24AB1042 1630-14-454-6438 F6103; F0296;

F6184 or F0296 Braking Circuit Relays D24AB1043 1630-14-455-6498 F6103 or F0296 Braking Circuit Relays 97167 1630-14-393-8637 F6103 or F0296

2. Test and Evaluation. Upon receipt of the components, the Contractor shall perform a test and evaluation to determine the condition of the item. If, after visual and functional inspections, an item is found to meet manufacturer's minimum performance specifications and is considered to be Ready for Installation (RFI) or is considered to be Beyond Economical Repair (BER) in accordance with (IAW) paragraph 11, the Contractor will be allowed the firm fixed price for test and evaluation only. The Contractor shall prepare a failure data report IAW paragraph 13 which shall be included with the returned component.

The parts shall be marked "RFI” or “BER” and returned as-is. All other items shall be repaired IAW this SOW.

3. Repair. Non-RFI components shall be repaired and returned to RFI condition IAW the

Original Equipment Manufacturer (OEM) Components Maintenance Manuals (CMMs) minimum functional performance specifications. Components shall be repaired for the specific fault noted on the DD Form 1577-2, Unserviceable (Repairable) Tag-Material, or CG-1577-A (11-90), Unsatisfactory Report Tag, which will be attached to each non-RFI item. The Contractor shall perform an inspection and correct deficiencies found. This shall include, but is not limited to, replacement of missing or broken parts and the removal of any foreign matter or corrosion.

4. During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part.

Corrosion removal and treatment of affected areas will be accomplished IAW Original Equipment Manufacturer (OEM) specifications or Federal Aviation Administration (FAA) Advisory Circular AC 43-4B, dated 09/11/2018, Corrosion Control for Aircraft.

5. Work under this SOW shall be performed at the contractor’s facility or USCG approved facility. The contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and repair the components listed in this purchase order at the firm-fixed prices listed in the schedule. If any parts or materials are not available to the Contractor and need to be provided as Government Furnished Equipment (GFE), the Contractor must make this requirement known in writing to the Contracting Officer (KO) for approval and indicate the reason they are unable to provide and the quantity for each GFE needed per component to be repaired. Any GFE provided by the Government must be subtracted from the total repair cost. The contractor shall perform all repairs IAW applicable OEM’s Component Maintenance Manuals (CMMs), other repair specifications in lieu of an applicable CMM, and/or applicable test/acceptance criteria. Any deviations must be approved by the USCG.

6. The contractor must have access to required CMMs, repair specifications, and/or test/acceptance criteria and any other required data to ensure all components are tested and repaired IAW the OEM’s current specifications and procedures. The USCG may review repair manuals and performance/test/ acceptance criteria as required. Original design or functional capabilities of the end item and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.

7. The Contractor must have access to all applicable documents and obtain current editions of all applicable documents. The USCG does not own, nor can it provide the technical documents specified herein. Neither the closing date for receipt of offers nor contract award will be delayed pending receipt of these documents for any offeror.

8. Parts of a component found to be in a serviceable condition as a result of functional testing shall be reused. Missing parts and parts found to be defective or that require replacement by manufacturer’s instructions shall be replaced with parts meeting the manufacturer’s specifications and drawings or as otherwise authorized in writing by Short Range Recovery (SRR) Engineering. Replacement parts shall be new and accompanied with OEM traceability. The cost for parts that are replaced systematically during repair shall be included in the price listed in the schedule for these operations.

9. Prices do not include components that have been cannibalized or severely damaged due to mishandling or crash damage. Additionally, the MH-65 helicopter is used primarily around salt water at low altitude for search and rescue missions. Therefore, corrosion is to be anticipated and is considered "normal" for the aircraft. Corrosion does not constitute unusual damage. The USCG will be notified of components found to have excessive corrosion which may dictate an exclusion from the prices specified in the contract schedule. Such components shall be inspected, repair costs determined, and authorization to proceed obtained from the KO prior to commencement of work.

10. Components received which indicate obvious misuse, cannibalization, or severe damage due to mishandling or crash damage may dictate an exclusion from the prices specified in the contract schedule. Such components shall be inspected, repair costs determined, and authorization to proceed obtained from the KO prior to commencement of work. Once notified of a possible exclusion, The KO will make a written determination within thirty (30) days as to exclusion validity. The Contracting Office approve the quote, decline the quote, and have the item returned as-is, or consider the item BER.

11. The contractor may request an item to be determined BER if after initial inspection of the component the contractor feels that the part requires significant repair/overhaul outside of the scope of the normal repair procedures provided in the OEM’s CMMs. The contractor’s request shall be sent to the KO for consideration. Only the KO can determine a component BER. The KO will review the request and either accept or deny the BER determination. If the KO denies the BER determination, the contractor shall repair the component back to RFI condition at the firm-fixed price rate agreed upon in the schedule. If the KO determines an item to be BER, the KO shall make a unilateral decision as to component disposition. The contractor shall return all BER items assembled to Aviation Logistics Center (ALC). The contractor shall not return any BER item until they have been notified by a written modification to the order. The contractor shall prepare a failure data report IAW paragraph 13 in these instances. This report shall be included with the returned component. When returning items to ALC, the items shall be clearly marked as “BER” with the supporting evidence.

12. The Government shall not be liable for any amount expended by the contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the KO.

13. The contractor shall submit a failure data report for each repaired component. This report shall include National Stock Number, Part Number, Serial Number, nomenclature, date of repair, purchase order number, line item number, description of repaired failure, the USCG’s reported failure, a listing of parts repaired, and a listing of parts replaced. The contractor’s in-housework order may be used to satisfy this requirement if it includes the information requested above. This report shall be attached to the packing slip and shipped with the repaired component.

14. The contractor is required to be certified and maintain a quality system that complies with the requirements of ISO 9001 Quality Management Systems – Requirements, AS9110, or equivalent. The contractor is responsible for performing or assuring all inspections, tests and calibration necessary to substantiate that the goods or services furnished conform to Government’s requirements. The contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements.

Records of conformance shall be maintained on file at the contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at contractor’s facility to verify the existence, adequacy and effectiveness of the quality system. Upon request of the Government, the contractor(s) shall forward a copy of their current certification and Quality Assurance Manual for review.

15. The contractor shall maintain, at a minimum, one of the following: FAA Part 145 Certified

Repair Facility, European Aviation Safety Agency (EASA) Part 145 Certified Repair Facility, OEM Certified Repair Facility, and/or USCG SRR Engineering-approved repair facility for repair of components identified in the Schedule for the entire duration of this Purchase Order. The Contractor shall provide immediate notification to the KO upon loss of any required certifications. The contractor shall also:

Comply with the certification/documentation requirements specified herein.

Attach certifications/documentation to the outside of the shipping container.

16. All parts repaired under the provisions of this contract must be airworthy and suitable for installation on USCG aircraft. Each returned component shall be tagged with a DD Form 1574 Serviceable Condition Code Tag completed in its entirety. The contractor shall furnish a Certificate of Conformance (COC) IAW FAR 52.246-15 for all components. These forms shall be packaged with each component.

17. The COC shall be signed by an authorized official of the approved source and must specify the nomenclature, manufacturer's part number and date of manufacture. For Production Approval Holder, a COC, AND a copy of the FAA Parts Manufacturer Approval (PMA) or other manufacturing authority shall be provided. Contractors shall also provide documentation reflecting the complete unbroken history of ownership of the parts from purchase from the approved manufacturing source until delivery to the USCG.

18. ALC considers components ready for issue (RFI) upon acceptance. Components determined to be non-RFI upon installation may be returned to the contractor with deficiencies described in a Product Quality Deficiency Report (PQDR).

19. All parts must be thoroughly cleaned IAW applicable CMMs to ensure they are as free as practicable of all hazardous dust to include hexavalent chromium, cadmium, lead, etc., prior to being returned to ALC. ALC may take random samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025 (lead), 1910.1026 (Hexavalent Chromium) and 1910.1027 (Cadmium).

**Remainder of this page left intentionally blank**

Purchase Order Requirements

1. The following table shows the required delivery for each priced line item listed in the schedule. Early deliveries, when appropriate, are desired and acceptable.

Line Item Item Description

Due No Later Than:

0001 Repair Thirty (30) calendar days after receipt of components and Test and Evaluation

0002 Test and Evaluation

Fifteen (15) calendar days after receipt of order and components