This Statement of Work (SOW) details the requirements for replacing two water heaters at Seymour Johnson Air Force Base's Southern Pines Lodge, located at 3808 & 3809 Wright Brothers Ave in Goldsboro, NC. The contractor must disconnect and remove existing water heaters in Buildings 3808 and 3809, then install two new Precision boiler hot water heaters (Model HWS-2468V-080A-208-125PS-I&J or equivalent), each with 125-gallon capacity, 208V/3-phase, 80 kW, and 150 PSI startup capabilities. The project requires comprehensive work including disconnecting power and gas systems, installing new copper piping, providing pipe hangers and supports, reusing existing electrical infrastructure, adding insulation, and coordinating with base contracting and civil engineering during installation, which is limited to Monday through Thursday from 8:00 am to 4:00 pm. The existing hot water system must remain operational, with minimal outage time scheduled through base facilities management.

View the file

Other files

File Type Posted
RFQ Combo 2 Water Heaters FA480925Q0040.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Quantity: 2 Water Heaters Building 3808 and 3809

Preparation and Install Requirement The location is Seymour Johnson Air Force Base, specifically the Southern Pines Lodge.

3808 & 3809 Wright Brothers Ave

Goldsboro, NC 27531

The contactor shall disconnect from the Water Heater Rooms in Buildings 3808 and 3809 all power wiring, control wiring, gas piping, vent piping, and hot water piping as needed for removal and disposal of the existing water heater from each building found in the Water Heater Room.

The contactor shall include all labor, accessories, tool, equipment, and materials required to completely execute the installation of two new Precision boiler hot water heaters Model: HWS-2468V-080A-208-

125PS-I&J hot water heater or equivalent.

Capacity of 125Gallons, 208V/3 80 KW startup 150 PSI 34x29x76 (LxWxH) with quick recovery capabilities. Existing hot water system is to remain operational during project, outage time will be kept to a minimum for each facility any water outage will be scheduled through FSS Billeting Facilities and CES

WSFM shop. Existing hot water line feeding from adjacent Building 3811 will be cut and capped in the mechanical rooms of Buildings 3808 and 3809.

Quantity 2 model HWS-2468V-080A-208-125PS-I&J hot water heater or equivalent

Voltage: 208V Phase: 3, 80 kW, Start-up

Pipe, Valves, Fittings The contactor shall furnish and install all pipe, manual valves, and fittings as required to connect the hot r loop to the new boiler. The contractor shall inspect existing hot water isolation valve and ensure it is in good working order so the existing hot water loop can be isolated for removal of existing boiler and installation of the new boiler. The new hot water pipes will be Copper.

Hangers and Supports The contactor shall furnish and install all pipe hangers and supports as required to support the pipe independently from the boiler.

Electrical The contactor shall reuse existing disconnect, conduit, and conductors that is required for load side electrical service from point of existing disconnect to new boiler. The contactor shall reuse existing breaker, conduit, and conductors on line side. Disconnect, conduit, and conductors have been sized per the NEC based on the boiler motor HP provided to Brady per the equipment manufacture.

Electrical connection to equipment and motors shall be made with short lengths of flexible "Liquid - Tite" conduit. All equipment has been selected for 208 volt, 60 hertz, and 3 phase electrical service.

The contactor shall provide nameplates for identification of all equipment, motor starters, disconnect switches.

Pipe Insulation All hot water piping shall be insulated to match existing.

Clarifications Coordination with Contracting and Civil Engineering (Plumbing) for delivery and installation is required

Monday through Thursday from 8:00 am to 4:00 pm.