This document is a Statement of Work (SOW) for the demolition of burned structures and removal of contaminated soils at the Mojave National Preserve in San Bernardino County, California. The contractor shall provide all labor, equipment, and management necessary to sample, load, haul, process, and dispose of debris, ash, and soil within the burned structure footprints at two ranch locations - Kessler Springs Ranch and Valley View Ranch.

The SOW outlines the specific scope of work, including preparation activities, waste removal and segregation, waste characterization, post-removal confirmatory sampling, and waste transportation and disposal requirements. It also details the contractor submittal requirements, such as a Debris Removal Operations Plan, Storm Water Pollution Prevention Plan, Health and Safety Plan, and post-demolition submittals. The contractor is required to commence work within 21 days of award. The SOW is part of a federal contract opportunity solicited by the Department of the Interior National Park Service Northeast Region.

View the file

Other files for this federal contract opportunity

Other files attached to Dome Fire Demo & Soil Remediation, newest first.
File Type Posted
Site_Evaluation_Report_1.pdf PDF
MOJA_Dome_Fire_Map_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

DEMOLITION OF STRUCTURE FIRE DEBRIS

AND CONTAMINATED SOILS REMOVAL

I. INTRODUCTION

1. This Statement of Work (SOW) describes a Response Activity for the burned buildings and ash post wildfire at Mojave National Preserve (MOJA), San Bernardino, California. The Contractor shall provide all management, supervision, labor, tools, and equipment necessary to sample, load, haul, accept, process, record, reduce, and dispose of disaster-related debris, ash, underlaying ash, and soil within the burned structures footprint. The debris to be removed varies from site to site and may include vegetation, ash, wood, contaminated soil, remnant structures, remnant concrete/stone/masonry structures, concrete, metal articles, trees that prohibit work performance, stumps, presumed PCB containing light ballasts, chemical containers, steel roofing, plumbing fixtures, railroad ties, etc. Post-removal, the Contractor shall perform soil sampling to identify if residual environmental contaminates above background concentrations remain.

II. LOCATION AND SITE DESCRIPTION

1. The burned buildings located in two areas within Mojave National Preserve (MOJA), California, including Valley View and Kessler Springs. Both burn site locations are located within San Bernadino County, California. These sites are both located off Cima Rd and are approximately 4.8 miles apart. Each site has multiple structures.

2. Valley View Ranch is located on Valley View Ranch Rd off Cima Rd in MOJA. Coordinates are 35.319008, -115.584939. To access site, exit highway I15 onto Cima Rd. Drive ~10.0 miles southeast on paved Cima Rd. Turn right onto Valley View Ranch Rd. Valley View Ranch Rd is a semi-maintained, relatively well-travel one-track dirt road. An all-wheel drive vehicle is recommended. Drive 1.8 miles southwest on dirt Valley View Ranch Rd. to the Valley View Ranch.

3. Kessler Springs Ranch is located off Cima Rd in MOJA. Coordinates are 35.297733, -

115.534763. To access site, exit highway I15 onto Cima Rd. Drive ~13.0 miles southeast on paved Cima Rd. Turn left onto semi-maintained dirt road to Kessler Spring Ranch.

III. BACKGROUND AND EXISTING CONDITIONS

1. Kessler Spring Ranch and Valley View Ranch have been used for ranching activities since the late 1800’s. Kessler Spring Ranch is a ranch with a septic pit, corrals, water well/supply systems, spring box/concrete drinker and two stockpiles of burned rubble and debris. The ranch house at Kessler Spring Ranch was registered as a historic park structure. Valley View Ranch is a ranch with a main ranch house, corrals, generator, solar array, and burned rubble and debris. Both ranches are contributing to the Rock Springs Land and Cattle Company cultural landscape, which is listed on the National Register of Historic Places.

2. On August 15, 2020, a lightning strike resulted in a 43,273-acre wildfire that burned through the Joshua Tree woodland of Cima Dome (referred to since as the “Dome Fire”). As a result, many of the structures on Kessler Spring Ranch and Valley View Ranch were reduced to burned building debris, including masonry/concrete walls and foundations, charred timbers, tin metal siding, floor tile, stucco, and ash.

3. The NPS will provide:

A. Site Evaluation Report, Dome Fire Time Critical Removal Action, Mojave National Preserve, San Bernardino County, CA, August 2021.

• The Site Evaluation Report, prepared by Professional Environmental Engineers, Inc., tested site debris and soils for asbestos and the results were all negative. Debris samples were selected based on materials that were identified as suspect asbestos-containing materials as documented in field notes. Contractor shall perform due diligence on reviewing these materials.

B. Sampling and Analysis Plan, Dome Fire Time Critical Removal Action, Mojave National Preserve, San Bernardino County, CA, May 2021.

IV. SCOPE OF WORK

1. Preparation:

A. The Contractor shall provide all necessary equipment, operators, and laborers for debris sampling, removal, segregation, preparation for recycling, hauling, oversight, and debris disposal/reduction site management as specified in the bidding schedule or as negotiated under this task order.

B. Contractor must provide a mobile scale for the purposes of weighing segregated wastes from each removal site. Contractor must provide documentation of calibration. Contractor must coordinate daily with the Contracting Officer’s Representative (COR) to ensure the COR is present to witness waste measures by container. Contractor is required to provide COR a written record of weights taken by container by site.

C. The Contractor shall provide at least one portable stair or raised portable platform with access ladder to allow inspectors to look over the sidewalls and view contents of loaded trucks and debris boxes/bins.

D. The Contractor is responsible for obtaining the Certificate for Disposal for Dome Fire Debris from San Bernardino County for all fire debris, structural ash, and contaminated soils prior to commencing removal work. All landfill disposal fees, waste disposal / transportation-related documents are the responsibility of the Contractor and will be included in pricing.

2. Waste removal, segregation, containerization, staging, and waste characterization:

A. The Contractor shall commence field work within 21 days after award.

B. Contractor shall conduct ash, debris, hazardous debris, and contaminated soil removal work in conformance with the approved Debris Removal Operations Plan (DROP), and in accordance with applicable laws and guidelines.

C. Storm Water, and Fugitive Dust Controls. Perform all measures as described in the approved submittals. Notify the COR and the Park immediately of any release events from water runoff, hazardous materials, fuels and oils, fugitive dust, or asbestos.

Take immediate corrective actions as required to protect and restore the areas impacted, and to prevent future release occurrences. Notify regulatory authorities as required by Federal and State laws and regulations.

D. For each waste type identified below, Contractor shall remove the debris from the structural burn area footprint, segregate and contain the waste for transport within the park, appropriately label the segregated waste containers (pending waste characterization sampling), transport contained waste from area approved for staging, and perform waste characterization sampling necessary to classify waste for subsequent disposal at a landfill permitted to receive this waste, as identified in the approved DROP. Contractor shall ensure that containerized wastes are moved expeditiously to staging site immediately after the removal mobilization at that burn site and are not left at the remote locations pending a second mobilization.

• Hazardous Debris Removal. Contractor will remove, segregate, contain, label, and move to the staging site from the hazardous debris from the structural burn site (i.e., batteries, household hazardous waste, electronic equipment, asbestos, railroad ties, etc.).

• Non-hazardous Debris Removal. Contractor shall remove, segregate, contain, label, and stage non-hazardous burned structural debris removal at the TDSR.

• Recyclable Metals. Contractor shall remove, segregate, contain, label, and stage metal debris suitable for recycling at the TDSR.

• Ash and Underlying Soils removal. After hazardous- and non-hazardous debris, and materials for recycling are removed from the structural burn site, the first half-inch (1/2”) of ash and soils shall be scraped, segregated, containerized for in-park transport, and moved to the approved staging area.

Contractor shall remove an addition ½” of ash and soils from each removal site that shall be segregated from the upper ½” ash and soils, containerized, and moved to the approved staging area.

• Contractor shall consolidate hazardous debris, non-hazardous debris, recyclable metals, the upper ½” ash and soils, and the lower 1/” ash and soil for waste characterization. Regarding consolidating ash and soils, Contractor may propose an alternative consolidation approach based ash and soils based on previous site sampling and history, as presented in the DROP to be submitted.

E. Waste Characterization. Contractor shall perform waste characterization testing to identify waste classification of segregated wastes and report to the COR the testing results, identified waste classification by container, container volume, and a unique identification of each container of the segregated wastes by site. Contractor shall provide a memorandum to the COR identifying the waste characterization sampling results, waste classification for waste disposal by container, and disposal facility to which the waste will be taken.

3. Post-removal confirmatory samples:

A. Contractor will perform three exit samples per removal site (as defined in Table 1) after debris and soils removal work has been completed. Sampling and analysis shall be performed in accordance with the Sampling and Analysis Plan (Appendix A of the Site Evaluation Report), and as outlined in the approved DROP.

4. Waste Transportation and Disposal:

A. Once the segregated wastes are characterized and characterized as hazard waste (CA Hazardous or Resource Conservation Recovery Act (RCRA) Hazardous), asbestos-containing, or non-hazardous, the wastes shall be contained, labeled and transported for off-site disposal as required by a registered Hazardous Waste Transporter (as registered with California Department of Toxic Substances Control) and in accordance with all applicable Federal and State law and regulations to the appropriate disposal or recycling sites permitted to receive characterized wastes as identified in the approved DROP.

B. Contractor shall ensure legally required manifest documents are transported with the wastes and that the transporting vehicles are weighted upon arrival and departure at these certified scales at these disposal and recycling sites. Weights for disposal shall be recorded on lading documents to be submitted in the Removal Site Evaluation Report and with Contact invoices.

5. General Work Requirements

A. Contractor shall perform work in accordance with approved plan submittals and retain documentation to demonstrate conformance to the approved plans.

B. The responsibilities of the Contractor include, but are not limited to, the following work items:

• Submit daily QC report detailing work performed on that date.

• Obtain all permits, licenses, and maintain these documents at the project site where work is to be performed and have such documents readily available.

• All trucks, equipment and vehicles used in the execution of this task order shall comply with all California Department of Transportation (CA DOT) regulations.

• Assure all trucks hauling debris shall be covered and have acceptable tailgates.

• Install and maintain six-foot tall, temporary cyclone security and safety fencing around the Contractor Staging and Temporary Disposal Storage and Reduction (TDSR) site at a location to be identified by the park COR.

• Compliance with all applicable local, state, and federal laws and regulations pertaining to dust control; removal, transportation, processing, and disposal of debris; and other operations associated with this contract.

C. Health and Safety Considerations:

• All mishaps (accidents, incidents, and near misses) shall be reported to the COR. This is to be accomplished within the same shift, preferably as soon after the accident as is practical. Fill out an Occupational Safety and Health Administration (OSHA) Form 300; an ENG 3394 shall be submitted to the Safety Office within 5 days after an accident. In the event of serious injury or damage, work will stop and everything will be left in place exactly as it was at the time of the accident, except when the possibility of more damage or injury exists.

• In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.

6. Project Specific Requirements

A. Workday: Hours of work are 7 a.m. to 6 p.m. Monday through Friday. Weekend work and work on federal holidays will only be allowed when approved in advance by the Contracting Officer.

B. Vehicles may only be parked in previously disturbed areas.

C. Construction equipment must have adequate mufflers and pollution emission controls.

D. The Contractor shall incorporate decontamination procedures for all vehicles, trucks, and equipment used at the site to control and prohibit the transfer of noxious weeds and plants into the park environment. Vehicles and equipment will be inspected by Park Representative prior to entry into the park for mud, weeds, and other unwanted substances. Pressure-wash earth-moving equipment (including haul vehicles) of mud and weed seed outside of and prior to entry into the Park. Subsequent entries of hauling vehicles will not require cleaning unless requested. Notify Park Representative a minimum of 48 hours prior to entry of vehicles and equipment.

E. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during site work. Do not idle equipment not in use for more than 5 minutes. Do not dispose of volatile wastes or oils in storm or sanitary drains. Do not allow waste materials to be washed into streams or bodies of water.

F. Do not operate or park equipment outside construction limits, except as approved by Park Representative. Do not operate or store vehicles and equipment leaking oil, gas, or antifreeze within park boundaries. Do not drain oil, hydraulic fluids, antifreeze, or other chemicals onto ground within park boundaries. Completely contain diesel fuel at work site. Clean up any spill immediately.

G. Daily, prior to the commencement of work, all equipment will be inspected for leaks and repaired immediately. Do not use equipment that is leaking. Keep supply of acceptable absorbent materials at job site in event of spills. Acceptable absorbent materials are those manufactured specifically for containment and cleanup of hazardous materials.

H. Constantly keep project sites clean of construction debris during duration of project.

Provide trash dumpsters with animal proof cover lids to contain construction debris.

Collect and dispose waste material outside park boundaries. Provide enough containers for collecting construction debris. Keep project neat, orderly, and in a safe condition at all times. Keep volatile wastes in covered containers. Maintain all food products and scented products in bear proof containers.

I. Do not feed or disturb wildlife within park boundaries. Comply with food-storage and garbage disposal requirements at all times. Suspend construction activities when dangerous animals (mountain lions, bears, etc.) come near an active construction area and create potential animal/human conflict. Park Representative or Park Ranger will be notified immediately for resolution of potential animal/human conflicts.

J. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Pick up all construction debris from the site. At time of final inspection, project shall be thoroughly clean.

K. Desert tortoise season is from March through October. If work continues into Desert Tortoise season, contractors must either: (1) install temporary snow fence along access routes and work sites or (2) have a park-approved Desert Tortoise monitor on site.

L. All onsite workers must watch the Desert Tortoise Awareness Video:

https://www.nps.gov/media/video/view.htm?id=DBCCFE6F-F66A-FDCE-

1909BC5E55030DFF

M. Fill all trenches or holes at the end of each day. If this is not possible, all holes or trenches shall be fitted with escape ramps or capped to prevent the entrapment of wildlife.

N. If unknown cultural resources are uncovered during the project, all work shall be stopped in the discovery area pending further investigation and consultation. If concealed archaeological resources are encountered during project activities, all necessary steps shall be taken to protect them; notify the parks Cultural Resources Program Manager immediately upon their discovery.

O. If human remains, funerary objects, sacred objects, or objects of cultural patrimony are discovered during project activities, the substantive requirements of the regulations implementing the Native American Graves Protection and Repatriation Act (43 CFR Part 10) shall be followed.

V. SUBMITTALS

As listed below, the following submittals are required to be submitted to the Contracting Officer in accordance with the schedule summarized below. All submittals must be submitted and approved by the Contracting Officer (CO) prior to commencing any site work beyond the initial Site Visit. NPS may request that the Contractor revise these documents prior to granting approval as part of this work scope.

SUBMITTAL/ SCHEDULE DRAFT DUE WITHIN REVISIONS DUE

Demolition and Remediation

14 Days after award NA

Health and Safety Plans (HASP)

14 days after award NA

Debris Removal Operations Plan 14 days after award NA

Storm Water Pollution Prevention Plan (SWPPP) and RWQCB Permit

21 days after award NA

Health and Safety Plans (HASP) 14 days after award

NA

Post-Demolition Submittals Waste Classification Memorandum

Within 3 days of sampling results availability

NA

Removal Site Evaluation Report 30 days after completion of field activities

21 days after receipt of comments

Option Line Item: Ecological Risk Assessment 14 days after award if exercised, subject to the availability of funds

14 days after receipt of comments

1. Submittals

A. Demolition and Remediation Schedule:

• Contractor shall submit a Project Schedule for submittals and field work milestones prior to the commencement of work. Contractor should assume mobilization is weather dependent. Based on park conditions, the Contractor shall commence mobilization to begin work within 21 days after award.

B. Debris Removal Operations Plan (DROP). The DROP shall be developed to be describe removal activities with site-specific details for each of the two discrete removal areas identified in Subsection 1.2.1. The DROP shall outline the Technical Approach and Methodology, and Organizational Structure (management to field supervisory level and division of responsibilities). The DROP shall include the following information and contents:

• Describe and diagram the topographic features (grade and natural drainages), pre-burn site improvements, use history, burned debris remaining on-site, and other Site Visit observations. Site features to note include:

o Foundation(s) and other hardscape;

o Ash footprint;

o Property-specific hazards (including any hazardous materials that may have been stored on the property);

o Water lines or wells (if applicable);

o Electrical sources (i.e., generators, solar panels, etc.);

o Septic Systems, leach fields, pit or vault toilets, and sewer lines (if applicable); and o Hazard trees in the vicinity of the work areas or along the access route that the Contractor deems to be a potential safety hazard to their workers or subcontractors.

• Describe the sampling and analysis plan for post-removal exit sampling methodology, confirming Contractor will adhere to the protocols contained in the Sampling and Analysis Plan, Dome Fire Time Critical Removal Action, Mojave National Preserve, San Bernardino County (May 2021).

Table 1 indicates the estimated number of post-removal confirmatory samples for each area.

• Provide estimates of the volume and weight of ash, underlaying soil, and debris to be removed from each location, a diagram of which area where different classes of waste are located (i.e., RCRA hazardous waste, California hazardous waste, metal/ concrete/masonry recycling, and non-hazardous fire-related debris disposal). Table 1 below indicates the depth of ash and soil removal within the ash footprint.

• Specifies dust control measures, such as providing water, to prevent dust nuisance at each site.

• Describe Personal Breathing Zone Monitoring to be performed for workers and the applicable work elements to which these monitoring measures apply.

Describe all other types of air monitoring required for removal work.

• Confirm methods for segregating, containment, packaging, handling, transportation, and disposal requirements to be followed for ash, soil, and structural debris, as determined by waste class, along with associated records and receipts to be retained as final documentation.

• A list of all earthmoving and other vehicles that will be operated off paved roads and a description of how the equipment and vehicles will be cleaned prior to entry into the Park and then decontaminated after work is completed.

• Names and permit information of all off-site, permitted waste disposal and recycling sites that will receive the debris as segregated by waste characterization and provide total volume estimates (from all removal areas combined) to be disposed of by waste type, as well as steps the Contractor will take to track and log quantities, and documentation to be created and retained.

C. Storm Water Pollution Prevention Plan

Contractor will develop a Storm Water Pollution Prevention Plan (SWPPP) that follows the guidelines and permit requirements of the California State Water Resources Control Board and the local regulator, the Lahontan Regional Water Quality Control Board (RWQCB). The Plan shall be appropriate for the type and complexity of a project and will be developed and implemented to address site-specific conditions. Although the total area of disturbance is less than one acre, the California State Water Resources Control Board requires a Construction Stormwater General Permit for building demolition activities per Construction Stormwater General Permit Order 2022-0057-DWQ.

D. Health and Safety Plans (HASP). The level of detail and scope of the plan shall be commensurate with the expected variety of activities and severity of hazards to be encountered. The contractor shall comply with applicable Occupational Safety and Health Administration (OSHA) requirements and regulations, including 29 CFR 1910.120, and other laws and regulations as applicable. NPS will review but not approve the HASP.

• The plan must specify only properly trained workers wearing proper personal protective equipment or PPE (sturdy footwear, gloves, respiratory protection, etc.) should sample, handle, sort, process and/or transport these materials.

• The HASP shall identify the qualifications required to perform and oversee the full range of work specified under this contract and consistent with applicable federal and State laws and regulations.

2. Post-Demolition Submittal

A. Waste Characterization Memorandum. Prior to shipment of any wastes off-site, the

Contractor shall submit to the COR a summary of waste characterization sampling results performed on the removed and segregated wastes and communicate the disposal facilities that will be used for the wastes and volumes that will be shipped for disposal. Laboratory analysis reports associated with the waste characterization sampling shall be attached to the memorandum.

B. Removal Site Evaluation Report. The Contractor shall prepare and submit a report of summarizing all removal activities, include field observations, removal work accomplished, materials disposed of off-site, recycled materials, post-removal sampling results, and site restoration work. The report additionally shall include the following information:

• A summary describing original site features, use history, and the results of waste characteristic sampling and the asbestos survey by removal site location. Include diagrams of site features and sampling locations and pre-fire and pre-work photographs.

• Describe waste removal actions at each location, including diagrams and photographs of documenting phases of removal work. Describe how wastes were segregated and consolidated by waste type. Document how materials (metals, concrete, and masonry) were segregated for recycling (as appropriate) and how these materials were cleaned prior to shipment off site.

• Summarize the volume (by removal area and total from all areas) and weight (total) of waste removed by waste class, along with receiving waste disposal facilities. Attach copies of all manifests, certificates of disposal, and weight tickets which must have the address of the generating property.

• Calculate and summarize in a table the BTVs for the 95 percent upper tolerance limit (UTL) with 95 percent coverage (UTL95-95) for all analytes and each location.

• Summarize analytical results and diagram locations sampled for the post-removal confirmatory samples and those used for determining the Background Threshold Values for each removal area. Indicate on a map where post-removal samples exceed the BTV concentrations for that location.

• Compare post-removal confirmatory sampling results to background levels (previously documented in the Site Evaluation Report, August 2021) and evaluate relative to applicable and relevant regulatory action levels and risk thresholds for contaminants detected.

• The draft report shall be submitted within 30 days following the completion of field activities to the Contracting Officer. The final report shall be submitted within 10 days of receiving comments from NPS. The final report shall be submitted to the Contracting Officer electronically in latest version of MS Word and Adobe Acrobat to include source files.

VI. OPTION LINE ITEM SUBMITTALS (If exercised at time of award, subject to the availability of funds)

1. Screening Level Ecological Risk Assessment SLERA).

A. Screening Level Ecological Risk Assessment (SLERA). The ecological risk assessment will begin with a Screening Level Ecological Risk Assessment, which is Steps 1 and 2 of the ecological risk assessment process as described in USEPA Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments (USEPA 1997; EPA 540-R-97-006). The SLERA shall include the following:

• The development of a site-specific CSEM for ecological exposure as part of the screening level problem formulation.

• The selection of Contaminants of Potential Ecological Concern (COPECs) by comparing maximum concentrations listed in the most recent version of NPS (NPS 2018) and State of California Ecological Screening Values (ESVs).

Use the lowest ESV.

• For identified COPECs, the calculation of refined screening level risk estimates using the 95UCLs and receptor-specific ESVs for use in refined SLERAs may be used as an intermediate step prior to a full Baseline Ecological Risk Action (BERA).

END OF SECTION

Table 1 List of Removal Sites, Estimated Ash and Soil Removal Square Footage, and Debris Removal Notes

Structure

Estimated Ash/Soil Scrape

Area (sf) Debris Removal Notes (other than ash and soil scrape) Kessler Springs Ranch 4177

Ranch House (SU-1 through SU-5) 1,405

HAZ DEBRIS: Railroad ties/corral posts on ground (?).

NON-HAZ DEBRIS: metal roofing, plumbing fixtures, heater; ADANDON IN PLACE: Septic pit.

LEAVE IN PLACE: Concrete slab, standing masonry walls; fireplace foundation.

Bunk House 1

(SU-6) 624

HAZ DEBRIS: Railroad ties/corral posts on ground (?).

LEAVE IN PLACE: Small brick fireplace; concrete slab;

standing masonry walls

Garage

(SU-7)

HAZ DEBRIS: Railroad ties/corral posts on ground (?).

NON-HAZ DEBRIS: Metal debris.

LEAVE IN PLACE: concrete slab

South Metal Shed (SU-8 and SU-9) 440 NON-HAZ DEBRIS: Metal debris.

North Shed

(SU-NS) 1,276

NON-HAZ: North Shed (remove); Metal debris.

LEAVE IN PLACE: Standing masonry wall; concrete slab.

Valley View Ranch 3,566

Ranch/Bunk House (SU-10 and SU-13) 1,280

HAZ DEBRIS: Furnace (?+.

NON-HAZ DEBRIS: Stucco on ground (negative for asbestos-refer to 2021 Site Evaluation report).

LEAVE IN PLACE: Standing masonry wall; concrete slab;

Root Cellar (SU-11) NA LEAVE IN PLACE: No Removal.

Shed

(SU-12) 208

LOCATION: North of Ranch House, partially below grade.

NON-HAZ DEBRIS: Metal debris.

LEAVE IN PLACE: Standing masonry wall; concrete slab.

Solar Array (SU-14) 440 NOTE: PV panels already removed.

Burned Batteries (SU-15) 180 NOTE: Batteries already removed.

Bunkhouse (SU-16) 640 NON-HAZ DEBRIS: Metal debris.

LEAVE IN PLACE: Standing masonry wall; concrete slab.

Generator (SU-17) 120 NOTE: Generator already removed.

Burned corral posts on ground 698 LOCATION: (N of Ranch House) Partially below grade.

HAZ DEBRIS: Railroad ties/corral posts on ground (?).

I. INTRODUCTION
1. This Statement of Work (SOW) describes a Response Activity for the burned buildings and ash post wildfire at Mojave National Preserve (MOJA), San Bernardino, California. The Contractor shall provide all management, supervision, labor, tools, and eq...
II. LOCATION AND SITE DESCRIPTION
1. The burned buildings located in two areas within Mojave National Preserve (MOJA), California, including Valley View and Kessler Springs. Both burn site locations are located within San Bernadino County, California. These sites are both located off...
2. Valley View Ranch is located on Valley View Ranch Rd off Cima Rd in MOJA. Coordinates are 35.319008, -115.584939. To access site, exit highway I15 onto Cima Rd. Drive ~10.0 miles southeast on paved Cima Rd. Turn right onto Valley View Ranch Rd. Val...
3. Kessler Springs Ranch is located off Cima Rd in MOJA. Coordinates are 35.297733, -115.534763. To access site, exit highway I15 onto Cima Rd. Drive ~13.0 miles southeast on paved Cima Rd. Turn left onto semi-maintained dirt road to Kessler Spring Ra...
III. BACKGROUND AND EXISTING CONDITIONS
1. Kessler Spring Ranch and Valley View Ranch have been used for ranching activities since the late 1800’s. Kessler Spring Ranch is a ranch with a septic pit, corrals, water well/supply systems, spring box/concrete drinker and two stockpiles of burned...
2. On August 15, 2020, a lightning strike resulted in a 43,273-acre wildfire that burned through the Joshua Tree woodland of Cima Dome (referred to since as the “Dome Fire”). As a result, many of the structures on Kessler Spring Ranch and Valley View ...
3. The NPS will provide:
A. Site Evaluation Report, Dome Fire Time Critical Removal Action, Mojave National Preserve, San Bernardino County, CA, August 2021.
The Site Evaluation Report, prepared by Professional Environmental Engineers, Inc., tested site debris and soils for asbestos and the results were all negative. Debris samples were selected based on materials that were identified as suspect asbestos...

B. Sampling and Analysis Plan, Dome Fire Time Critical Removal Action, Mojave National Preserve, San Bernardino County, CA, May 2021.

IV. SCOPE OF WORK
1. Preparation:
A. The Contractor shall provide all necessary equipment, operators, and laborers for debris sampling, removal, segregation, preparation for recycling, hauling, oversight, and debris disposal/reduction site management as specified in the bidding schedu...
B. Contractor must provide a mobile scale for the purposes of weighing segregated wastes from each removal site. Contractor must provide documentation of calibration. Contractor must coordinate daily with the Contracting Officer’s Representative (COR)...
C. The Contractor shall provide at least one portable stair or raised portable platform with access ladder to allow inspectors to look over the sidewalls and view contents of loaded trucks and debris boxes/bins.
D. The Contractor is responsible for obtaining the Certificate for Disposal for Dome Fire Debris from San Bernardino County for all fire debris, structural ash, and contaminated soils prior to commencing removal work. All landfill disposal fees, waste...
2. Waste removal, segregation, containerization, staging, and waste characterization:
A. The Contractor shall commence field work within 21 days after award.
B. Contractor shall conduct ash, debris, hazardous debris, and contaminated soil removal work in conformance with the approved Debris Removal Operations Plan (DROP), and in accordance with applicable laws and guidelines.
C. Storm Water, and Fugitive Dust Controls. Perform all measures as described in the approved submittals. Notify the COR and the Park immediately of any release events from water runoff, hazardous materials, fuels and oils, fugitive dust, or asbestos...
D. For each waste type identified below, Contractor shall remove the debris from the structural burn area footprint, segregate and contain the waste for transport within the park, appropriately label the segregated waste containers (pending waste char...
Hazardous Debris Removal. Contractor will remove, segregate, contain, label, and move to the staging site from the hazardous debris from the structural burn site (i.e., batteries, household hazardous waste, electronic equipment, asbestos, railroad ...
Non-hazardous Debris Removal. Contractor shall remove, segregate, contain, label, and stage non-hazardous burned structural debris removal at the TDSR.
Recyclable Metals. Contractor shall remove, segregate, contain, label, and stage metal debris suitable for recycling at the TDSR.
Ash and Underlying Soils removal. After hazardous- and non-hazardous debris, and materials for recycling are removed from the structural burn site, the first half-inch (1/2”) of ash and soils shall be scraped, segregated, containerized for in-park ...
Contractor shall consolidate hazardous debris, non-hazardous debris, recyclable metals, the upper ½” ash and soils, and the lower 1/” ash and soil for waste characterization. Regarding consolidating ash and soils, Contractor may propose an alternati...

E. Waste Characterization. Contractor shall perform waste characterization testing to identify waste classification of segregated wastes and report to the COR the testing results, identified waste classification by container, container volume, and a ...

3. Post-removal confirmatory samples:
A. Contractor will perform three exit samples per removal site (as defined in Table 1) after debris and soils removal work has been completed. Sampling and analysis shall be performed in accordance with the Sampling and Analysis Plan (Appendix A of t...
4. Waste Transportation, and Disposal:
A. Once the segregated wastes are characterized and characterized as hazard waste (CA Hazardous or Resource Conservation Recovery Act (RCRA) Hazardous), asbestos-containing, or non-hazardous, the wastes shall be contained, labeled and transported for ...
B. Contractor shall ensure legally required manifest documents are transported with the wastes and that the transporting vehicles are weighted upon arrival and departure at these certified scales at these disposal and recycling sites. Weights for dis...
5. General Work Requirements
A. Contractor shall perform work in accordance with approved plan submittals and retain documentation to demonstrate conformance to the approved plans.
B. The responsibilities of the Contractor include, but are not limited to, the following work items:
Submit daily QC report detailing work performed on that date.
Obtain all permits, licenses, and maintain these documents at the project site where work is to be performed and have such documents readily available.
All trucks, equipment and vehicles used in the execution of this task order shall comply with all California Department of Transportation (CA DOT) regulations.
Assure all trucks hauling debris shall be covered and have acceptable tailgates.
Install and maintain six-foot tall, temporary cyclone security and safety fencing around the Contractor Staging and Temporary Disposal Storage and Reduction (TDSR) site at a location to be identified by the park COR.
Compliance with all applicable local, state, and federal laws and regulations pertaining to dust control; removal, transportation, processing, and disposal of debris; and other operations associated with this contract.
C. Health and Safety Considerations:
All mishaps (accidents, incidents, and near misses) shall be reported to the COR. This is to be accomplished within the same shift, preferably as soon after the accident as is practical. Fill out an Occupational Safety and Health Administration (OSH...
In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements...
6. Project Specific Requirements
A. Workday: Hours of work are 7 a.m. to 6 p.m. Monday through Friday. Weekend work and work on federal holidays will only be allowed when approved in advance by the Contracting Officer.
B. Vehicles may only be parked in previously disturbed areas.
C. Construction equipment must have adequate mufflers and pollution emission controls.
D. The Contractor shall incorporate decontamination procedures for all vehicles, trucks, and equipment used at the site to control and prohibit the transfer of noxious weeds and plants into the park environment. Vehicles and equipment will be inspecte...
E. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during site work. Do not idle equipment not in use for more than 5 minutes. Do not dispose of volatile wastes or oils in storm or sanitary dr...
F. Do not operate or park equipment outside construction limits, except as approved by Park Representative. Do not operate or store vehicles and equipment leaking oil, gas, or antifreeze within park boundaries. Do not drain oil, hydraulic fluids, anti...
G. Daily, prior to the commencement of work, all equipment will be inspected for leaks and repaired immediately. Do not use equipment that is leaking. Keep supply of acceptable absorbent materials at job site in event of spills. Acceptable absorbent m...
H. Constantly keep project sites clean of construction debris during duration of project. Provide trash dumpsters with animal proof cover lids to contain construction debris. Collect and dispose waste material outside park boundaries. Provide enough c...
I. Do not feed or disturb wildlife within park boundaries. Comply with food-storage and garbage disposal requirements at all times. Suspend construction activities when dangerous animals (mountain lions, bears, etc.) come near an active construction a...
J. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Pick up all construction debris from the site. At...
K. Desert tortoise season is from March through October. If work continues into Desert Tortoise season, contractors must either: (1) install temporary snow fence along access routes and work sites or (2) have a park-approved Desert Tortoise monitor on...
L. All onsite workers must watch the Desert Tortoise Awareness Video: https://www.nps.gov/media/video/view.htm?id=DBCCFE6F-F66A-FDCE-1909BC5E55030DFF
M. Fill all trenches or holes at the end of each day. If this is not possible, all holes or trenches shall be fitted with escape ramps or capped to prevent the entrapment of wildlife.
N. If unknown cultural resources are uncovered during the project, all work shall be stopped in the discovery area pending further investigation and consultation. If concealed archaeological resources are encountered during project activities, all ne...
O. If human remains, funerary objects, sacred objects, or objects of cultural patrimony are discovered during project activities, the substantive requirements of the regulations implementing the Native American Graves Protection and Repatriation Act (...
V. SUBMITTALS
As listed below, the following submittals are required to be submitted to the Contracting Officer in accordance with the schedule summarized below. All submittals must be submitted and approved by the Contracting Officer (CO) prior to commencing any s...
1. Submittals
A. Demolition and Remediation Schedule:
Contractor shall submit a Project Schedule for submittals and field work milestones prior to the commencement of work. Contractor should assume mobilization is weather dependent. Based on park conditions, the Contractor shall commence mobilization...
B. Debris Removal Operations Plan (DROP). The DROP shall be developed to be describe removal activities with site-specific details for each of the two discrete removal areas identified in Subsection 1.2.1. The DROP shall outline the Technical Approac...
Describe and diagram the topographic features (grade and natural drainages), pre-burn site improvements, use history, burned debris remaining on-site, and other Site Visit observations. Site features to note include:
o Foundation(s) and other hardscape;
o Ash footprint;
o Property-specific hazards (including any hazardous materials that may have been stored on the property);
o Water lines or wells (if applicable);
o Electrical sources (i.e., generators, solar panels, etc.);
o Septic Systems, leach fields, pit or vault toilets, and sewer lines (if applicable); and
o Hazard trees in the vicinity of the work areas or along the access route that the Contractor deems to be a potential safety hazard to their workers or subcontractors.
Specifies dust control measures, such as providing water, to prevent dust nuisance at each site.
C. Storm Water Pollution Prevention Plan
Contractor will develop a Storm Water Pollution Prevention Plan (SWPPP) that follows the guidelines and permit requirements of the California State Water Resources Control Board and the local regulator, the Lahontan Regional Water Quality Control Boar...
D. Health and Safety Plans (HASP). The level of detail and scope of the plan shall be commensurate with the expected variety of activities and severity of hazards to be encountered. The contractor shall comply with applicable Occupational Safety and H...
The plan must specify only properly trained workers wearing proper personal protective equipment or PPE (sturdy footwear, gloves, respiratory protection, etc.) should sample, handle, sort, process and/or transport these materials.
The HASP shall identify the qualifications required to perform and oversee the full range of work specified under this contract and consistent with applicable federal and State laws and regulations.
2. Post-Demolition Submittal
A. Waste Characterization Memorandum. Prior to shipment of any wastes off-site, the Contractor shall submit to the COR a summary of waste characterization sampling results performed on the removed and segregated wastes and communicate the disposal fa...
B. Removal Site Evaluation Report. The Contractor shall prepare and submit a report of summarizing all removal activities, include field observations, removal work accomplished, materials disposed of off-site, recycled materials, post-removal samplin...
A summary describing original site features, use history, and the results of waste characteristic sampling and the asbestos survey by removal site location. Include diagrams of site features and sampling locations and pre-fire and pre-work photogra...
Describe waste removal actions at each location, including diagrams and photographs of documenting phases of removal work. Describe how wastes were segregated and consolidated by waste type. Document how materials (metals, concrete, and masonry) w...
Summarize the volume (by removal area and total from all areas) and weight (total) of waste removed by waste class, along with receiving waste disposal facilities. Attach copies of all manifests, certificates of disposal, and weight tickets which m...
Calculate and summarize in a table the BTVs for the 95 percent upper tolerance limit (UTL) with 95 percent coverage (UTL95-95) for all analytes and each location.
Summarize analytical results and diagram locations sampled for the post-removal confirmatory samples and those used for determining the Background Threshold Values for each removal area. Indicate on a map where post-removal samples exceed the BTV c...
Compare post-removal confirmatory sampling results to background levels (previously documented in the Site Evaluation Report, August 2021) and evaluate relative to applicable and relevant regulatory action levels and risk thresholds for contaminants...
The draft report shall be submitted within 30 days following the completion of field activities to the Contracting Officer. The final report shall be submitted within 10 days of receiving comments from NPS. The final report shall be submitted to the...
VI. OPTION LINE ITEM SUBMITTALS (If exercised at time of award, subject to the availability of funds)
1. Screening Level Ecological Risk Assessment SLERA).
A. Screening Level Ecological Risk Assessment (SLERA). The ecological risk assessment will begin with a Screening Level Ecological Risk Assessment, which is Steps 1 and 2 of the ecological risk assessment process as described in USEPA Ecological Risk...
The development of a site-specific CSEM for ecological exposure as part of the screening level problem formulation.
The selection of Contaminants of Potential Ecological Concern (COPECs) by comparing maximum concentrations listed in the most recent version of NPS (NPS 2018) and State of California Ecological Screening Values (ESVs). Use the lowest ESV.
For identified COPECs, the calculation of refined screening level risk estimates using the 95UCLs and receptor-specific ESVs for use in refined SLERAs may be used as an intermediate step prior to a full Baseline Ecological Risk Action (BERA).