Valley View Site Kessler
Spring Site
Kelso Depot Visitor Center
Nipton
Hole-in-the-Wall
Cima Road
Interstate 15
Project No.
073.20.001
Date
3/29/21 GW
Drawn By
BR
Checked By
PROFESSIONAL
ENVIRONMENTAL
ENGINEERS, INC.
Figure 1 Park Location and Sites Location Map
Mojave National Preserve (MOJA) Kessler Spring and Valley View Sites
LEGEND
MOJA Boundary
Roadways
MOJA AML Site Location
1" = 8 Miles When Printed 11 in by 17 in
N
1" = 2 Miles When Printed 11 in by 17 in
Kessler Spring
Valley View
Appx Surface Water Runoff
Divide
| Draft MOJA Dome Fire Site Eval CLEAN WORD |
| Table of Contents |
| List of Tables iii |
| List of Figures iii |
| Appendices iii |
| 1. Introduction 1-1 |
| 2. Site Evaluation Activities 2-2 |
| 3. Site Evaluation Results 3-4 |
| 4. Conclusions 4-6 |
| 5. References 5-7 |
| List of Tables |
| List of Figures |
| Appendices |
| Appendix A – Sampling and Analysis Plan |
| Appendix B – Site Reconnaissance Trip Report |
| Appendix C – Field Sampling Documentation |
| Appendix D –Laboratory Analytical Results |
| Appendix E – Asbestos Survey |
| Appendix F – Background ProUCL Calculations |
| List of Abbreviations and Acronyms |
| 1. Introduction |
| 1.1 Background |
| 1.2 Purpose |
| 2. Site Evaluation Activities |
| 2.1 Pre-Planning Activities |
| 2.2 Sampling and Analysis Plan |
| 2.3 Ash/Debris and Soil Sampling |
| 2.4 Asbestos Survey |
| 3. Site Evaluation Results |
| 3.1 Analytical Testing |
| 3.2 Background Soil Threshold Values |
| 3.3 Analytical Results Compared to Screening Levels |
| 3.4 Waste Characterization |
| 4. Conclusions |
| 5. References |
| Tables |
| Table1_Background Summ Stats CIMA Dome Fire Site (002) |
| Sheet1 |
| Table2_3_Analysis Comparison Tables |
| KSR Comparison |
| VVR Comparison |
| Table4_5_Analysis Comparison Tables |
| KSR Data |
| VVR Data |
| Draft MOJA Dome Fire Site Eval CLEAN WORD |
| Figures |
| Figs 1-5 |
| Figure 1 - Park Location and Site Location Mapc |
| Sheets and Views |
| Figure 1 - Park Location and Site Location Map |
| Figure 2 - Site Layout Map Kessler Spring |
| Sheets and Views |
| Figure 2 - Site Layout Map - Kessler |
| Figure 3 - Site Layout Map Valley View |
| Sheets and Views |
| Figure 3 - Site Layout Map - Valley View |
| Figure 4 - Kessler SU Location Map |
| Sheets and Views |
| Figure 4 - Kessler SU Map |
| Figure 5 - Valley View SU Location Map |
| Sheets and Views |
| Figure 5 - Valley View SU Map |
| Draft MOJA Dome Fire Site Eval CLEAN WORD |
| Appendix A – Sampling and Analysis Plan |
| AppA_MOJA Final Dome Fire COMPLETEpdf |
| MOJA Final Dome Fire COMPLETEpdf SAP |
| Table of Contents |
| 1. Introduction 1-1 |
| 2. Site Description, Previous Investigations, and Conceptual Site Model 2-1 |
| 3. DQO Planning Team and Stakeholders 3-1 |
| 4. Data Quality Objectives 4-1 |
| 5. Field Sampling Plan 5-1 |
| 6. Data Management 6-1 |
| 7. Assessment and Oversight 7-1 |
| 8. Investigation Outputs 8-1 |
| 9. References 9-1 |
| Appendices |
| Appendix A – Trip Report |
| Appendix B – PE Standard Operating Procedures |
| Appendix C – Laboratory QA / QC Procedures |
| List of Tables |
| List of Figures |
| List of Abbreviations and Acronyms |
| 1. Introduction |
| 1.1 CERCLA and National Park Service (NPS) Authority |
| 1.2 Purpose of Field Sampling |
| 1.3 Site Location |
| 2. Site Description, Previous Investigations, and Conceptual Site Model |
| 2.1 Key Site Features |
| 2.1.1 Site Descriptions |
| 2.1.2 Operational History |
| 2.1.3 Waste Characteristics |
| 2.1.4 Site Geology and Hydrogeology |
| 2.1.5 Site Hydrology |
| 2.1.6 Local Climate |
| 2.1.7 Sensitive Environments |
| 2.2 Summary of Previous Investigations |
| 2.2.1 Data Quality/Usability |
| 2.2.2 Preliminary Identification of Data Gaps |
| 2.2.3 Contaminants of Potential Concern |
| 2.3 Current and Future Property Use Scenarios |
| 2.3.1 Graphical Conceptual Site Model |
| 2.3.2 Key CSM Assumptions |
| 3. DQO Planning Team and Stakeholders |
| 3.1 DQO Planning Team |
| 3.2 Decision-Makers |
| 3.3 Stakeholders |
| 4. Data Quality Objectives |
| 4.1 The Problem |
| 4.2 Investigation Goals |
| 4.2.1 Principal Investigation Questions |
| 4.2.2 Decision Criteria |
| 4.3 Information Inputs |
| 4.3.1 Previous Data Usability |
| 4.3.2 Data to be Collected in the Current Investigation |
| 4.4 Define the Boundaries of the Investigation |
| 4.4.1 Spatial Boundaries |
| 4.4.2 Decision Units |
| 4.4.3 Sampling Units |
| 4.4.4 Temporal Boundaries |
| 4.5 Develop the Analytical Approach |
| 4.5.1 Decision or Estimation Parameters |
| 4.5.2 Action Levels |
| 4.6 Performance or Acceptance Criteria |
| 4.6.1 Quality Assurance/Quality Control |
| 4.6.1.1. Laboratory Quality Assurance/Quality Control |
| 4.6.1.2. Field Quality Assurance/Quality Control |
4.6.2 Data Verification and Usability
4.7 Plan for Obtaining the Data
| 5. Field Sampling Plan |
| 5.1 Ash/Debris Sampling |
| 5.1.1 Ash/Debris Sampling Locations |
| 5.1.2 Ash/Debris Sampling Protocol |
| 5.1.3 Ash/Debris Sampling Health and Safety |
| 5.1.4 Ash/Debris Field Measurements |
| 5.1.5 Ash/Debris Analytical Methods |
| 5.2 Sample Handling |
| 5.2.1 Sample Designation |
| 5.2.2 Sample Labeling |
| 5.2.3 Sample Handling and Chain of Custody |
| 5.2.4 Documentation and Records |
5.3 Investigation Derived Waste Handling
| 6. Data Management |
| 6.1 Data Collection |
| 6.2 Laboratory Analysis and Data Deliverables |
| 6.3 Data Verification |
| 6.3.1 Field Data |
| 6.3.2 Analytical Data |
| 7. Assessment and Oversight |
| 7.1 Assessment and Corrective Actions |
| 7.1.1 Field Audit and Response Actions |
| 7.2 Quality Assessment Reporting |
| 7.2.1 Data Verification |
7.3 Reconciliation with DQOs and Data Usability
| 8. Investigation Outputs |
| 9. References |
| MOJA Final Dome Fire SAP Fig.App |
| MOJA Draft Cima Dome Fire SAP042321 |
| Figures |
| Dome Fire SAP Figures |
| Sheets and Views |
| Figure 1 - Park Location and Site Location Map |
| Figure 2 - Site Layout Map Kessler Spring.pdf |
| Sheets and Views |
| Figure 2 - Site Layout Map - Kessler |
| Figure 3 - Site Layout Map Valley View.pdf |
| Sheets and Views |
| Figure 3 - Site Layout Map - Valley View |
| Figure 4 - Graphical CSM.pdf |
| Sheets and Views |
| Figure 4 - Graphical CSM |
| Figure 5 - Kessler SU Location Map.pdf |
| Sheets and Views |
| Figure 5 - Kessler SU Map |
| Figure 6 - Valley View SU Location Map.pdf |
| Sheets and Views |
| Figure 6 - Valley View SU Map |
| MOJA Draft Cima Dome Fire SAP042321 |
| Appendix A – Trip Report |
| Cima Dome Fire Kessler Spring and Valley View |
| 1-Trip Report - CIMADOME |
| Binder1c |
| 2a-Photolog Cover |
| Photolog - Kessler Spring |
| Photolog - Valley View |
| 3a-Field Notes Cover |
| Field Notes 3.8.21 |
| MOJA Draft Cima Dome Fire SAP042321 |
| Appendix B – PE Standard Operating Procedures |
| Dome Fire SAP Appendix B |
| Cima Dome Fire Appx |
| SOP No. 1 - Bulk Asbestos Sampling Method draft final |
| SOP NO. 1—BULK ASBESTOS SAMPLING |
| Purpose and Scope |
| Definitions: |
| Procedural Precautions |
| Apparatus, Materials, and Chemicals |
| Summary of Bulk Asbestos Sampling Procedure |
| Personnel Training for Bulk Asbestos Sampling |
| Records and Review Documentation |
| Safety Precautions |
| References |
| MOJA Dome Fire Appendix A SOPs |
| SOP NO. 3—SOIL/SEDIMENT SAMPLING |
| Purpose and Scope |
| Procedures for Soil Sampling |
| Equipment List |
| Decontamination |
| Soil Sample Collection |
| Soil Sample Collection |
| Field Quality Assurance/Quality Control Procedures and Samples |
| Duplicate (QC) Samples |
| Sample Identification, Handling, and Documentation |
| Documentation |
| Field Logbook |
| SOP NO. 5—DECONTAMINATION |
| Introduction and Types of Contamination |
| Site and/or Sample Cross-Contamination |
| Equipment List |
| Decontamination Procedures |
| Personnel |
| Sampling Equipment |
| Decontamination Solutions |
| Responsible Authority |
| Wastewater |
| Emergency Decontamination |
| Documentation |
| SOP NO. 6—SAMPLE HANDLING, DOCUMENTATION, AND TRACKING |
| Purpose and Scope |
| Sample Identification |
| Field Samples |
| Sample Handling |
| Sample Containers |
| Sample Preservation |
| Sample Handling and Shipping |
| Holding Times and Analyses |
| Sample Documentation and Tracking |
| Field Notes |
| Sample Chain-Of-Custody |
| MOJA Dome Fire Appendix A SOPs |
| SOP NO. 3—SOIL/SEDIMENT SAMPLING |
| Purpose and Scope |
| Procedures for Soil Sampling |
| Equipment List |
| Decontamination |
| Soil Sample Collection |
| Soil Sample Collection |
| Field Quality Assurance/Quality Control Procedures and Samples |
| Duplicate (QC) Samples |
| Sample Identification, Handling, and Documentation |
| Documentation |
| Field Logbook |
| SOP NO. 5—DECONTAMINATION |
| Introduction and Types of Contamination |
| Site and/or Sample Cross-Contamination |
| Equipment List |
| Decontamination Procedures |
| Personnel |
| Sampling Equipment |
| Decontamination Solutions |
| Responsible Authority |
| Wastewater |
| Emergency Decontamination |
| Documentation |
| SOP NO. 6—SAMPLE HANDLING, DOCUMENTATION, AND TRACKING |
| Purpose and Scope |
| Sample Identification |
| Field Samples |
| Sample Handling |
| Sample Containers |
| Sample Preservation |
| Sample Handling and Shipping |
| Holding Times and Analyses |
| Sample Documentation and Tracking |
| Field Notes |
| Sample Chain-Of-Custody |
| MOJA Draft Cima Dome Fire SAP042321 |
| Appendix C – Laboratory QA/QC Procedures |
| Dome Fire SAP App C |
| sac-qam_r6_sept2020 |
| Pace Minn QAM |
| Signature Manifest |
| Quality Manual |
| 1.0 Purpose and Scope |
| 1.1 Purpose |
| 1.2 Scope and Application |
| 1.2.1 Quality Manual Template |
| 1.2.2 Laboratory Quality Manual |
| 1.2.3 References to Supporting Documents |
| 2.0 References |
| 3.0 Terms and Definitions |
| 4.0 Management Requirements |
| 4.1 Organization |
| 4.1.1 Legal Identity |
| 4.1.1.1 Change of Ownership |
| 4.1.2 Compliance Responsibility |
| 4.1.3 Scope of the Quality Management System |
| 4.1.4 Organization History and Information |
| 4.1.4.1 Organization Structure |
| 4.1.5 Management Requirements |
| 4.1.5.1 Personnel |
| 4.1.5.2 Roles and Responsibilities |
| 4.1.5.3 Conflict of Interest |
| 4.1.5.4 Confidentiality |
| 4.1.5.5 Communication |
| 4.2 Quality Management System |
| 4.2.1 Quality Management System Objectives |
| 4.2.1.1 Impartiality |
| 4.2.1.2 Risk and Opportunity Assessment |
| 4.2.1.3 Communication of the Quality Management System |
| 4.2.2 Quality Policy Statement |
| 4.2.2.1 Ethics Policy / Data Integrity Program |
| 4.2.3 Management Commitment: Quality Management System |
| 4.2.4 Management Commitment: Customer Service |
| 4.2.5 Supporting Procedures |
| 4.2.5.1 Quality Management System Document Structure |
| 4.2.6 Roles and Responsibilities |
| 4.2.7 Change Management |
| 4.3 Document Control |
| 4.3.1 General |
| 4.3.2 Document Approval and Issue |
| 4.3.3 Document Review and Change |
| 4.4 Analytical Service Request, Tender, and Contract Review |
| 4.5 Subcontracting and In-Network Work Transfer |
| 4.6 Purchasing Services and Supplies |
| 4.7 Customer Service |
| 4.7.1 Commitment to Meet Customer Expectations |
| 4.7.2 Customer Feedback |
| 4.8 Complaints |
| 4.9 Nonconforming Work |
| 4.9.1 Definition of Nonconforming Work |
| 4.9.1.1 Authorized Departure from SOP |
| 4.9.1.2 Authorized Departure from Test Methods (Method Modifications) |
| 4.9.1.3 Stop Work Authority |
| 4.10 Continuous Improvement |
| 4.11 Corrective Action |
| 4.11.1 Root Cause Analysis |
| 4.11.2 Effectiveness Review |
| 4.11.3 Additional Audits |
| 4.12 Preventive Action |
| 4.12.1 Change Management |
| 4.13 Control of Records |
| 4.13.1 General Requirements |
| 4.13.1.1 Procedure |
| 4.13.1.2 Record Legibility and Storage |
| 4.13.1.3 Security |
| 4.13.1.4 Electronic Records |
| 4.13.2 Technical Records |
| 4.13.2.1 Description |
| 4.13.2.2 Real Time Recordkeeping |
| 4.13.2.3 Error Correction |
| 4.14 Audits |
| 4.14.1 Internal Audit |
| 4.14.1.1 Corporate Compliance Audit |
| 4.15 Management Review |
| 4.16 Data Integrity |
| 5.0 Technical Requirements |
| 5.1 General |
| 5.2 Personnel |
| 5.2.1 Personnel Qualifications |
| 5.2.1.1 Competence |
| 5.2.2 Training |
| 5.2.2.1 Training Program and Goals |
| 5.2.2.2 Effectiveness of Training |
| 5.2.3 Personnel Supervision |
| 5.2.4 Job Descriptions |
| 5.2.5 Authorization of Technical Personnel |
| 5.3 Accommodations and Facilities |
| 5.3.1 Facilities |
| 5.3.2 Environmental Conditions |
| 5.3.3 Separation of Incompatible Activities |
| 5.3.4 Laboratory Security |
| 5.3.5 Good Housekeeping |
| 5.4 Test Methods |
| 5.4.1 General Requirements |
| 5.4.2 Method Selection |
| 5.4.3 Laboratory Developed Methods |
| 5.4.4 Non-Standard Methods |
| 5.4.5 Method Validation |
| 5.4.5.1 Validation Description |
| 5.4.5.2 Validation Summary |
| 5.4.5.3 Validation of Customer Need |
| 5.4.6 Measurement Uncertainty |
| 5.4.7 Control of Data |
| 5.4.7.1 Calculations, Data Transfer, Reduction and Review |
| 5.4.7.2 Use of Computers and Automated Acquisition |
| 5.5 Equipment |
| 5.5.1 Availability of Equipment |
| 5.5.2 Calibration |
| 5.5.2.1 Support Equipment |
| 5.5.2.2 Analytical Instruments |
| 5.5.3 Equipment Use and Operation |
| 5.5.4 Equipment Identification |
| 5.5.5 Equipment Lists and Records |
| 5.5.5.1 Equipment List |
| 5.5.5.2 Equipment Records |
| 5.5.6 Out of Service Protocol |
| 5.5.7 Calibration Status |
| 5.5.8 Returned Equipment Checks |
| 5.5.9 Intermediate Equipment Checks |
| 5.5.10 Safeguarding Equipment Integrity |
| 5.6 Measurement Traceability |
| 5.6.1 General |
| 5.6.2 Equipment Correction Factors |
| 5.6.3 Specific Requirements |
| 5.6.3.1 Requirements for Calibration Laboratories |
| 5.6.3.2 Requirements for Testing Laboratories |
| 5.6.4 Reference Standards and Reference Materials |
| 5.6.4.1 Reference Standards |
| 5.6.4.2 Reference Materials |
| 5.6.4.3 Intermediate Checks |
| 5.6.4.4 Transport and Storage |
| 5.7 Sampling |
| 5.7.1 Sampling Plans and SOPs |
| 5.7.2 Customer Requested Deviations |
| 5.7.3 Recordkeeping |
| 5.8 Sample Management & Handling |
| 5.8.1 Procedures |
| 5.8.1.1 Chain of Custody |
| 5.8.1.2 Legal Chain of Custody |
| 5.8.2 Unique Identification |
| 5.8.3 Sample Receipt Checks and Sample Acceptance Policy |
| 5.8.3.1 Sample Receipt Checks |
| 5.8.3.2 Sample Acceptance Policy |
| 5.8.4 Sample Control and Tracking |
| 5.8.5 Sample Storage, Handling, and Disposal |
| 5.8.5.1 Sample Storage |
| 5.8.5.2 Sample Retention and Disposal |
| 5.9 Assuring the Quality of Test Results |
| 5.9.1 Quality Control (QC) Procedures |
| 5.9.1.1 Essential QC |
| 5.9.1.2 Proficiency Testing (PT) |
| 5.9.2 QC Corrective Action |
| 5.9.3 Data Review |
| 5.9.3.1 Primary Review |
| 5.9.3.2 Secondary Review |
| 5.9.3.3 Completeness Review |
| 5.9.3.4 Data Audits |
| 5.10 Reporting |
| 5.10.1 General Requirements |
| 5.10.2 Test Reports: Required Items |
| 5.10.3 Test Reports: Supplemental Items |
| 5.10.3.1 Supplemental Requirements |
| 5.10.3.2 Test Reports: Sampling Information |
| 5.10.4 Calibration Certificates |
| 5.10.5 Opinions and Interpretations |
| 5.10.6 Subcontractor Reports |
| 5.10.7 Electronic Transmission of Results |
| 5.10.8 Format of Test Reports |
| 5.10.9 Amendments to Test Reports |
| 6.0 Revision History |
| 7.0 Appendices |
| 7.1 Appendix A: Certification / Accreditation Listing |
| 7.1.1 PAS-Minneapolis |
| 7.2 Appendix B: Capability Listing |
| 7.2.1 PAS-Minneapolis |
| 7.3 Appendix C: Glossary |
| 7.4 Appendix D: Organization Chart(s) |
| 7.4.1 PAS-Corporate |
| 7.4.2 PAS-Minneapolis, Bloomington |
| 7.5 Appendix E: Equipment Listing |
| 7.5.1 PAS-Minneapolis, Bloomington |
| 8.0 Addendum: Program requirements |
| 8.1 DoD/DOE |
| 8.2 Ohio VAP |
| Section 5.6.3.2 Reference Materials |
| Draft MOJA Dome Fire Site Eval CLEAN WORD |
| Appendix B – Site Reconnaissance Trip Report |
| AppB_Cima Dome Fire Trip Report |
| 1-Trip Report - CIMADOME |
| Binder1c |
| 2a-Photolog Cover |
| Photolog - Kessler Spring |
| Photolog - Valley View |
| 3a-Field Notes Cover |
| Field Notes 3.8.21 |
| Draft MOJA Dome Fire Site Eval CLEAN WORD |
| Appendix C – Field Sampling Documentation |
| C |
| AppC_1Photolog - Kessler Spring |
| AppC_2Photolog - Valley View |
| AppC_36.2021 Field Notes Combined |
| 6.2021 Field Notes Combined.pdf |
| 6.7 Field Notes Pg 1 & 2c.pdf |
| 6.8 Notes Pg 1.pdf |
| 6.8 Notes Pg 2,3.pdf |
| 6.8 Notes Pg 4,5.pdf |
| 6.8 Notes Pg 6,7.pdf |
| 6.8 Notes Pg 8.pdf |
| KS Ranch house map.pdf |
| Kessler Spring Field Map.pdf |
| VV site map.pdf |
| Draft MOJA Dome Fire Site Eval CLEAN WORD |
| Appendix D – Laboratory Analytical Results |
| D |
| AppD_1J74812-1 UDS Level 2 Report Final Report |
| 1. Cover Page |
| 2. Table of Contents |
| 3. Definitions/Glossary |
| 4. Case Narrative |
| 5. Detection Summary |
| 6. Client Sample Results |
| 7. Surrogate Summary |
| 8. Isotope Dilution Summary |
| 9. QC Sample Results |
| 10. QC Association Summary |
| 11. Lab Chronicle |
| 12. Certification Summary |
| 13. Method Summary |
| 14. Sample Summary |
| 15. Subcontract Data |
| 16. Chain of Custody |
| 17. Receipt Checklists |
| AppD_2J74812-2 UDS Level 2 Report Final Report |
| 1. Cover Page |
| 2. Table of Contents |
| 3. Definitions/Glossary |
| 4. Case Narrative |
| 5. Detection Summary |
| 6. Client Sample Results |
| 7. QC Sample Results |
| 8. QC Association Summary |
| 9. Lab Chronicle |
| 10. Certification Summary |
| 11. Method Summary |
| 12. Sample Summary |
| 13. Chain of Custody |
| 14. Receipt Checklists |
| Draft MOJA Dome Fire Site Eval CLEAN WORD |
| Appendix E – Asbestos Survey |
| E |
| AppE_121028581_Kessler Springs & Ranch House & Shed |
| AppE_221028582_Ranch House & VV Dome Fire |
| AppE_321028583_Bunk House & Valley View Dome Fire |
| AppE_421028584_Kessler Springs & Bunk House |
| AppE_521028585_Kessler Springs & Shed |
| Draft MOJA Dome Fire Site Eval CLEAN WORD |
| Appendix F – Background ProUCL Calculations |
| F |
| AppF_1KSR Background, ProUCL Output File |
| Sheet1 |
| AppF_2VVR Background, ProUCL Output File |
| Sheet1 |