Statement of Requirements_Newline_Replacements_AFSNCOA.pdf
PDF 385 KB Posted
- Attached to
- FY25 Newline Smart Boards
- Solicitation number
- FA330025Q2009
About this file
This Statement of Requirements details the procurement of 25 interactive whiteboards for the Barnes Center for Enlisted Education at Maxwell Air Force Base-Gunter Annex. The required displays must be 65-inch, all-in-one digital touchscreen units with specific technical specifications including 4K resolution, LED backlight, Android embedded operating system, Windows 11 Pro OPS modules, and compatibility with multiple operating systems. Key technical requirements include a 400-nit brightness, 50,000-hour lifetime, front-facing speakers, anti-glare/anti-fingerprint tempered glass touch surface supporting up to 40 touch points, and comprehensive port configurations. The whiteboards must be brand new, mountable on existing mobile stands, and include standard manufacturer warranties, with delivery to be made to the specified address in Alabama.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Requirements
Barnes Center for Enlisted Education- AFSNCOA Interactive Whiteboard Replacements
1. PURPOSE: The Thomas N. Barnes Center enlisted professional military education classrooms located at Maxwell Air Force Base (AFB) – Gunter Annex- AFSNCOA has multiple white boards that have experienced total failure. Replacing the broken Newline interactive white boards will enable our classes to continue to run without delays and interruptions.
2. DESCRIPTION OF ITEMS: The following items are required for performance under this contract: all-in-one digital touchscreen display, all required cables, software and licenses, and on-board (OPS) expansion PC modules that have windows 11. The display will need to be compatible with other operating systems, such as MacOS, Android, Linux, and Chrome, provided through a software solution rather than additional hardware (e.g. casting, slinging).
Software licensing will need to be identified as annual renewal or one-time purchase and will be included in the contract price. If annual renewal, prices for additional years will be included.
2.1. Display characteristics should meet these minimum requirements:
2.1.1. Display
Screen Size: 65 inch
Backlight: LED
Resolution: 3840 x 2160 pixels
Display Ratio: 16:9
Brightness: 400nit
Viewing Angle: 178°
Lifetime Hours: 50,000 hours
2.1.2. Speakers
Speaker Position: Front
Power Output: (2) 20W
2.1.3. Power
Max Power Consumption: ≤ 550W (Standby =0.5W)
Working Voltage: AC 100-240V, 50/60Hz
2.1.4. Touch
Touch Surface: Anti-Glare + Anti-Fingerprint + Anti-microbial Tempered Glass
Touch Points: Up to 40 Points
Writing Tools: Stylus or Finger
2.1.5. Ports
Front Interface Ports
• USB Type-C 65W x 1
• HDMI 2.0 x 1
• USB Type-B (Touch) x 1
• USB 3.0, Type-A x 1
• Mic in x 1
Inputs
• HDMI IN 2.0 x 2HDMI IN 2.0 x 2
• DisplayPort (4K@60Hz) x 1
• USB Type-B (Touch) x 3
• RJ45 (Gigabit) IN x 1
• OPS Slot x 1
Outputs
• HDMI Out x 1
• RJ45 (Gigabit) IN x 1
• Audio Line out x 1
2.1.6. Other Major Features
Embedded Operating System: Android
OPS Included: Yes
Wireless Screen Casting: Yes
Object Recognition: Yes
2.2. OPS modules should meet these minimum requirements:
• Operating System: Win 11 Pro (License included)
• CPU: i7-7500U - 2.90GHz or higher
• RAM: 16GB DDR4
• Storage: 256GB SSD
• WiFi: 802.11 b/g/n/ac
2.3. Mounting solutions: The display must be capable of attaching securely to Barnes Center’s pre-existing mobile stands by three mounting locations at a minimum.
3.0.DELIVERY REQUIREMENTS: Delivery will be made to the following addresses:
3.1.Maxwell AFB, AL
POC: Brittany Cain
ITEC Account: 00GW
Barnes Center for Enlisted Education
550 Mcdonald St
Maxwell AFB-Gunter Annex, AL 36114
Quantity: 25
4.0.STANDARD WARRANTY: The contractor shall provide any Original Equipment Manufacturer (OEM) standard commercial warranty applicable to the products being purchased at no additional cost to the Government.
4.1.Prior to project acceptance, the contractor shall provide the customer with all manufacturer warranties as needed for any component incorporated into this project such as equipment manuals, literature, CDs and DVDs and other documentation on all equipment and software.
4.2.Prior to project acceptance, the contractor shall provide written procedures, points of contact within company and required information for all warranty services prior to project acceptance. This information shall include written confirmation of the warranty period, phone numbers and contact information/procedures for technical support, troubleshooting assistance and replacement of faulty equipment and/or software.
5.0.GENERAL INFORMATION: Items must be brand new. Refurbished items are not authorized.
File details come from the government source that posted it. Updated .