Statement of Requirements.pdf
PDF 500 KB Posted
- Attached to
- Tilt-A-Way Vertical Pivot Gate
- Solicitation number
- 70Z03325QBASEA008
About this file
This is a Statement of Requirements from the U.S. Coast Guard Base Astoria for the procurement of a Tilt-A-Way vertical pivot gate to secure the main entrance against unauthorized vehicle and personnel intrusion. The document specifies the requirement for one HYJG model Tilt-A-Way Hydraulic Pivot Gate measuring 21' x 9' with RAM Box Hardware, along with associated components including a cylinder heating strip (PEO247), in-tank oil heater with thermostat (TWO520), hydraulic pump and reservoir insulating cover (110135), cylinder insulating cover (110134), electrical box heating strip (PEO252), and an electrical box insulating cover.
The justification states that the vertical pivot gate provides superior protection against vehicle ramming, improved maintainability, enhanced reliability, and better performance in extreme weather conditions compared to the existing rolling gate which experiences weekly seize-ups. The equipment is to be delivered to CG Base Astoria at 2185 SE 12th Place, Warrenton, OR 97146.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Supply Clauses.pdf | ||
| SAP Justification Signed and Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
Coast Guard Base Astoria
STATEMENT OF REQUIREMENTS FOR THE PURCHASE OF
VERTICAL PIVOT GATE
Requirements
1 JUSTIFICATION
USCG intends to procure a Tilt-A-Way vertical pivot gate. The gate will be used to secure the main entrance of USCG Base Astoria against unauthorized vehicle and personnel intrusion. The vertical pivot gate offers superior protection against vehicle ramming, is easier to maintain, is more reliable, and is rated for more extreme wind/temperature/weather conditions. The procurement of this gate reduces the risk of a gate seize-up which is currently happening on a weekly basis with Base Astoria’s existing rolling gate.
2 STATEMENT OF REQUIREMENTS
Tilt-A-Way Vertical Pivot Gate
Name Part/Model Number Quantity Tilt-A-Way Hydraulic Pivot Gate 21’ x 9’ with RAM Box Hardware. Dimensions specified in Reference Drawing 1.
HYJG 1
Cylinder Heating Strip PEO247 1 In Tank Oil Heater with Thermostat
TWO520 1
Hydraulic Pump & Resivoir Insulating Cover
110135 1
Cylinder Insulating Cover 110134 1 Electrical Box Heating Strip PEO252 1 Electrical Box Insulating Cover n/a 1
1. DELIVERY LOCATION
CG Base Astoria 2185 SE 12th Place Warrenton, OR 97146
File details come from the government source that posted it. Updated .