Statement of Proponent Qualifications 10_28_2.pdf
PDF 194 KB Posted
- Solicitation number
- PE-66062-NONST-2027-000000525
- Issued by
- Fulton County, Atlanta City, Georgia
About this file
This is a Statement of Proponent's Qualifications form for an annual contract for Geotechnical Testing, Topographical Surveying and Investigation Services issued under RFP-S-XXXXXXXX. The document establishes minimum qualification criteria that proponents must satisfy to be deemed responsible and responsive bidders. Key requirements include demonstrated experience with three similar projects completed within the last seven years involving soil survey evaluation, Standard Penetration Test borings, groundwater level measurement, well screen piezometer installation, field permeability testing, thin-walled tube sample recovery, muck probing, and laboratory soil classification and strength testing. Proponents must submit an organizational chart showing the Design-Build lead, key project personnel, and key subcontractors, along with resumes demonstrating relevant experience aligned with proposed team roles. The form requires proponents to identify an Overall Project Manager, Construction Manager, Construction Superintendent, QA/QC Manager, Engineering Design Manager, Lead Geotechnical Design Engineer, Lead Structural Design Engineer, Licensed Surveyor, and Site Safety Officer.
Specific personnel qualifications include a Project Manager and Engineering Design Manager who must have successfully completed at least two similar contracts within seven years, with the Construction Manager and Construction Superintendent required to have completed two similar contracts with one being design-build. The QA/QC Manager must possess minimum ten years of construction experience in geotechnical testing and investigation. A Professional Land Surveyor currently licensed and registered in Georgia must be assigned and must have worked on at least two similar contracts. The Site Safety Officer must have five years of construction loss control/safety experience and be a certified safety professional. Additionally, proponents must maintain an established Safety Program, demonstrate Workers' Compensation Ratings not exceeding an average EMR of 1.0 over three years, maintain OSHA Incidence Rates not exceeding industry standards for heavy civil construction, and disclose any fatalities or serious incidents from the last five years that may result in disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A DRAFT Topographical Surveying Se.pdf | ||
| EXHIBIT A _ Scope of Services 10_28_2026_1113.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF PROPONENT’S QUALIFICATIONS
This Statement is to accompany bids submitted for the following project: RFP -S- XXXXXXXX, Annual Contract for Geotechnical Testing, Topographical Surveying and & Investigation Services. Proponents must meet the minimum qualification criteria set forth under items 5, 7, 8, 9, 10, 11 and 12 of this section and must provide the organization chart as set forth under item 6 of this section to be deemed a "Responsible and Responsive Proponent″.
1. NAME OF BIDDER:
2. BUSINESS ADDRESS:
3. TELEPHONE NUMBER:
a. OFFICIAL REPRESENTATIVE AND TITLE:
5. Using the forms provided in this Section, list previously completed or current projects which are similar in scope and complexity to this project which were completed or assigned to your firm or joint venture, including: Name of project, location of project, owner's name, address and phone number, description of work performed, initial contract amount, final contract amount, start date, scheduled completion date and actual completion date. (If a joint venture, list separately for each joint venture partner.) Limit to 5.
a. Proponent shall have successfully designed, constructed, managed and successfully completed three (3) similar projects within the last seven (7) years.
Similar projects shall be defined as projects requiring the evaluation of soil survey maps; interpret and evaluate general subsurface conditions; perform Standard Penetration Test (SPT) borings; measure groundwater levels; install well screen piezometers; perform field permeability tests; recover thin-walled tube samples;
perform muck probing; and conduct laboratory tests to aid in classification of soils and measure strength of materials. The qualifications of individual design team members shall be provided in a graphic organizational chart that shows the relationship of the Design-Build lead, Key Project Personnel and Key Subcontractors. Resumes of all key personnel shall be provided with a matrix summary of the team members that describe experience of the Design-Build Project References presented in the Qualification Statement.
b. The Proponents (contractors and subcontractors) shall have a current Georgia Utility Contractor’s License. (See the Proposal Requirements Information).
6. Provide the following information for the organization proposed for this project:
a. Organizational chart
b. Indicate the participation by the various members in the organization, as shown on the organizational chart; in the management; and in the division of work (if a joint venture, indicate percent of man hours and percent of project cost to be performed by each joint venture member).
7. Using the forms provided in this section, provide information for key project personnel:
Overall Project Manager, Construction manager, Construction Superintendent, QA/QC Manager, Engineering Design Manager, Lead Geotechnical Design Engineer’ Lead Structural Design Engineer, Licensed Surveyor, and Site Safety Officer.
a. Project Manager must have been project manager for duration of project and successfully completed at least two similar contracts within the last seven (7) years. Similar projects shall be defined as projects requiring the evaluation of soil survey maps; interpret and evaluate general subsurface conditions; perform Standard Penetration Test (SPT) borings;
measure groundwater levels; install well screen piezometers; perform field permeability tests; recover thin-walled tube samples; perform muck probing; and conduct laboratory tests to aid in classification of soils and measure strength of materials.
b. Construction Manager and Construction Superintendent must have successfully completed at least two similar contracts within the last seven (7) years. Similar projects shall be defined as projects requiring the evaluation of soil survey maps; interpret and evaluate general subsurface conditions; perform Standard Penetration Test (SPT) borings;
measure groundwater levels; install well screen piezometers; perform field permeability tests; recover thin-walled tube samples; perform muck probing; and conduct laboratory tests to aid in classification of soils and measure strength of materials. One (1) of the projects shall be design-build.
c. The QA/QC Manager must have a minimum of ten (10) years of construction experience involving Geotechnical Testing and Investigation.
d. Engineering Design Manager must have been project manager for duration of project and successfully completed at least two (2) similar contracts within the last seven (7) years.
Similar projects shall be defined as projects requiring the evaluation of soil survey maps;
interpret and evaluate general subsurface conditions; perform Standard Penetration Test (SPT) borings; measure groundwater levels; install well screen piezometers; perform field permeability tests; recover thin-walled tube samples; perform muck probing; and conduct laboratory tests to aid in classification of soils and measure strength of materials.
e. Lead Geotechnical Design Engineer must have been involved in at least two (2) similar contracts within the last seven (7) years. Similar projects shall be defined as projects requiring the evaluation of soil survey maps; interpret and evaluate general subsurface conditions; perform Standard Penetration Test (SPT) borings; measure groundwater levels;
install well screen piezometers; perform field permeability tests; recover thin-walled tube samples; perform muck probing; and conduct laboratory tests to aid in classification of soils and measure strength of materials. One (1) of the projects shall be design-build.
f. Lead Structural Design Engineer must have been involved in at least two (2) similar contracts within the last seven (7) years. Similar projects shall be defined as projects requiring the evaluation of soil survey maps; interpret and evaluate general subsurface conditions; perform Standard Penetration Test (SPT) borings; measure groundwater levels;
install well screen piezometers; perform field permeability tests; recover thin-walled tube samples; perform muck probing; and conduct laboratory tests to aid in classification of soils and measure strength of materials.
g. The Proponent shall have access to, or employ, a Professional Land Surveyor (PLS) currently licensed and registered in the State of Georgia to perform surveying services associated with scope of services; utility plan preparation, easement exhibits, right-of-way documentation, and construction support activities. The Licensed Survey must have worked on at least two (2) contracts involving similar facilities and complexity. The Proponent shall submit the following with its proposal:
a. Copy of the Licensed Surveyor's current Georgia Professional Land Surveyor license.
b. Résumé demonstrating relevant utility and infrastructure survey experience.
c. Description of the Surveyor's role on the project.
d. Name and contact information of the Professional Land Surveyor who will be assigned to the project.
e. Copies of any required certifications or registrations requested by the City
h. Site Safety Officer must have worked on at least two (2) contracts involving similar facilities and complexity as this project, possess five (5) years of construction loss control/safety experience in heavy construction, and be a certified safety professional.
8. The Proponent must have an established Safety Program that as a minimum includes those items as listed on the attachment entitled “SAFTETY RECORD FORM,”
9. The Proponent’s Workman’s Compensation Ratings (EMR-Experience Modification Rate) must not exceed an average of 1.0 over the last three (3) years (provided for each team member).
Proponent’s Workman’s Compensation Ratings (EMR-Experience Modification Rate)
10. The Proponent’s OSHA Incidence Rates must not exceed the most current Industry Standard published by the U.S. Department of Labor (2013) for the last three (3) years for heavy civil construction – water and sewer utilities, NAICS code 23711 (i.e. Total Recordable Case Rates must not exceed 3.6; Injuries and Illness with Lost Work Days must not exceed 0.9).
The following will be provided by the Proponent for each member of the Design Build Team:
a. Total Recordable Case Rates;
b. Injuries and Illness with Lost Work Days;
c. Injuries and Illness with Job Transfer or Restricted Work Days.
11. If there have been any fatalities during the last five (5) years on any projects performed by the Proponent or on any work performed under the direct supervision of a proposed Project Manager and the Contractor or proposed Project Manager was cited by OSHA for “Willful”, in performing the work in which the fatality occurred, the Proponent will be disqualified based on the City’s review. The Proponent may also be disqualified in the event that a Recordable Incident occurred due to the same condition that existed when a previous fatality occurred and resulted in an OSHA citation or failure to implement a corrective action plan.
a. Fatalities during the last five (5) years where Contractor was cited by OSHA for
“Willful” or “Serious” Violation
b. Fatalities during the last five (5) years where the proposed Project Manager was cited by OSHA for “Willful” or “Serious” Violation.
12. If there have been any incidents during the last five (5) years on any projects performed by the Proponent or on any work performed under the direct supervision of a proposed Project Manager that resulted due to the actions of the Proponent or Project Manager or failure of the Proponent or Project Manager to perform work on schedule, the Proponent will be disqualified based on the City’s review.
The previous statements and attachments are true, correct, and complete to the best of my knowledge.
Date:
Firm Name:
By:
Title:
Sworn to and subscribed before me this day of _____________ , 201
Notary Public of: (State)
My Commission Expires:
STATEMENT OF PROPONENT'S QUALIFICATIONS
PROPONENT PROJECT EXPERIENCE FORM
NAME:
Project No.
(Complete Form Only For Projects That Meet Minimum Criteria)
Project Name Project Location Contractor’s Project Manager Contractor’s Project Superintendent Owners Representative & Phone Number
Design Engineer Representative Name & Phone Number
Initial Contract Amount $ Final Contract Amount $ Project Duration Date Started:
Date Completed:
Time Extensions:
Was Project Completed on Time?
Description of Major Project Components
*Proponent may provide documentation showing equivalent information substantiating minimum qualifications required for this Project.
STATEMENT OF PROPONENT'S QUALIFICATIONS
KEY PERSONNEL EXPERIENCE
NAME:
TITLE:
Project No.
(Complete Form Only For Projects That Meet Minimum Criteria)
Project Name Project Location Contractor’s Project Manager Owners Representative & Phone Number
Design Engineer Representative Name & Phone Number
Initial Contract Amount $ Final Contract Amount $ Project Duration Date Started:
Date Completed:
Time Extensions:
Was Project Completed on Time?
Description of Major Project Components
*Proponent may provide documentation showing equivalent information substantiating minimum qualifications required for this Project.
| STATEMENT OF PROPONENT’S QUALIFICATIONS |
| This Statement is to accompany bids submitted for the following project: RFP -S- XXXXXXXX, Annual Contract for Geotechnical Testing, Topographical Surveying and & Investigation Services. Proponents must meet the minimum qualification criteria set fort... |
| STATEMENT OF PROPONENT'S QUALIFICATIONS |
| Project No. |
| STATEMENT OF PROPONENT'S QUALIFICATIONS |
| Project No. |
File details come from the government source that posted it. Updated .