EXHIBIT A _ Scope of Services 10_28_2026_1113.pdf

PDF 1016 KB Posted

Attached to
Geotechnical Testing, Investigation Services & Topographically Surveying Services
Solicitation number
PE-66062-NONST-2027-000000525
Issued by
Fulton County, Atlanta City, Georgia

About this file

This is an Exhibit A Scope of Services document for the City of Atlanta Department of Watershed Management (DWM) soliciting geotechnical, environmental engineering testing, topographical surveying, and investigation services on an on-call, as-needed basis. The contractor will provide a broad range of professional services including Phase I and Phase II Environmental Site Assessments, asbestos and lead-based paint surveys, subsurface utility investigations, geotechnical testing and laboratory services, surveying and mapping services, rock coring, and specialized studies. Services will be provided across multiple City of Atlanta departments including the Department of Public Works, Department of Parks, Recreation and Cultural Affairs, and Department of Planning and Community Development. The contract operates through a task order system where the City requests specific services, the contractor submits proposals with not-to-exceed dollar amounts and timelines, and the City issues Work Authorizations and Notices to Proceed. The City reserves the right to modify the scope, cancel any work authorization at its convenience, and step in with additional service providers if performance standards are not met. Field work must be performed during non-business hours, weekends, and holidays when necessary, and the contractor is responsible for obtaining all necessary permits, providing traffic control, and restoring worksites to pre-disturbance conditions.

Compensation is based on unit rates for identified services as specified in the Cost Proposal Form (Exhibit 1A), with rates including all labor, materials, testing equipment, data analysis, overhead, and profit. Time and materials invoicing is available only for specific project management functions, work not covered in the Cost Proposal, standby time, specialized studies such as geology reports and environmental assessments, and emergency services. Monthly invoices must be submitted by the 25th of the following month with itemized employee information including professional category, hourly rate, and hours worked by date and location. Overtime premiums of 1.25 apply to hourly and non-exempt salaried employees only. The contractor must utilize the City's Project Document Tracking and Control System (DTCS) using Trimble Unity Construct software to track all documentation, submittals, RFIs, change orders, and payment applications. Failure to maintain proper project records, as-built documentation, and daily reports may result in withholding of monthly or final payments. Services must be provided on a 24-hour advance notice basis and may continue for multiple years at the City's discretion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

GENERAL SCOPE OF SERVICES

DRAFT

EXHIBIT A

SCOPE OF SERVICES

1.1 BACKGROUND

Geotechnical, Environmental. Engineering Testing, Topographically Surveying and

Investigation Services shall include all, personnel, materials, and all things necessary to provide all research recommendations, studies, conferences, presentations, written documents, designs specifications, details, drawings, issuance of certificates for payment review of documents, inspections, supervision and approval of work, preparation of estimates, necessary to accomplish specific assignments.

The City reserves the right to modify the scope or services as deemed necessary at its sole discretion.

1.2 DEFINITIONS

The following terms will have the following meanings: (When required, the plural will include the singular and the singular will include the plural.)

DWM (or CITY) - Department of Watershed Management (City of Atlanta)

DPW - Department of Public Works (City of Atlanta)

DPRCA — Department of Parks, Recreation and Cultural Affairs (City of

Atlanta)

DPCD — Department of Planning and Community Development (City of

Atlanta)

GDOT — Georgia Department of Transportation

EPA - United States Environmental Protection Agency, Region 4, Atlanta, Georgia

EPD-Georgia Department of Natural Resources – Environmental Protection

Division

Project Manager - An individual employee responsible for the management of a specific project assigned under a Task Order.

Services Coordinator - The individual designated by the Team to be responsible for the overall management and coordination of services to be provided under the agreement.

1.3 GENERAL REQUIREMENTS

The City intends to engage Contractor to provide technical, professional and other services for various City of Atlanta Department of Watershed Management projects as broadly described in this Scope of Services. Whenever services are requested by the City of Atlanta, the Contractor will submit a written proposal for the specific project based on the scope of services requested by the City of Atlanta. The City may accept/reject the proposal, or decline such services when it is in the best interest of the City to do so. If the

Consultant's proposal is accepted, the City may issue a Work Authorization and Notice to Proceed that specifies the "not-to-exceed" dollar amount of the Work Authorization with the start work and completion date. After having received the Notice to Proceed, including a written approval of the scope and cost of services for a specific project, the

Contractor shall provide the services required for the specific project.

The scope of work provided herein is intended to include a broad range of services and activities that may be performed over a number of years at the City’s discretion in order to meet the City’s strategic objectives. The City will determine the work to be performed.

All Contractor member firms, sub-consultants and their employees are advised to avoid potential conflicts of interest. Full and prompt disclosure of involvement in projects or services to other clients that may be in conflict with the financing, construction, operation and management of the City's projects shall be made to the City in advance so that potential conflicts of interest can be determined.

The City may cancel an outstanding Notice to Proceed or Work Authorization at any time at the City's convenience if it is in the City’s best interest. Upon the cancellation of an outstanding Notice to Proceed, the City will pay the Contractor for any authorized work that has been satisfactorily performed, and through the date of cancellation. In the event of cancellation, the Contractor will not be entitled to any additional compensation for unauthorized work or anticipated lost profits due to such cancellation. All work products for which compensation is received by the Contractor from the City shall be submitted to the City. It is understood and agreed by the Contractor that services performed under the Scope of Services but not be limited to those services described below and to the extent desired by the City.

1.4 INVOICING PROCEDURES

A. Contractor shall utilize the DWM of Atlanta’s Project Document Tracking and

Control System (DTCS) described in the technical specification Section 01350 attached. Primary function of system is to facilitate timely processing and approval of all contract documentation in coordination with overall Project

Schedule established by these Specifications and Contractor. This system will utilize Trimble Unity Construct (TUC) software for document tracking and control, or other software as determined by City of Atlanta.

B. Contractor shall submit a monthly invoice for services provided. The monthly invoice shall be submitted on or before the 25th of the month following the month in which services were rendered.

C. Unit rates for all services identified in Parts I & II of the Cost Proposal Form in

Exhibit 1.A. shall include costs for all field labor, sample collection and handling activities, testing equipment, materials, data analysis, and overhead expense and profit.

D. Time and materials tracking and payment are available only for (1) certain project management and contract coordination functions; (2) work not covered elsewhere in the Cost Proposal Form in Exhibit 1A; (3) work that requires standby-time for field personnel; (4) certain specialized studies and services such geology reports, environmental assessments, etc.; and (5) certain emergency services in which the

City seeks professional advice related to subsurface investigations, construction inspection and testing services.

1. Invoices that include billable hours shall identify each employee's name professional category, hourly rate, and number of hours worked itemized by the date and location:

a. If an employee performs a service lower than his professional status (an

Engineer performing Technician services), that service shall be paid at the classification rate of the service performed;

b. Contractor shall be responsible for insuring that sub-consultant's invoices are submitted in conformance with requirements of this section; and

c. Invoices not in compliance with requirements of this section shall not be paid.

2. Overtime Rates (Overtime rates will apply only as noted in the Cost Proposal

From):

a. No overtime premium on categories that contain salary/exempt employees.

b. An overtime premium of 1.25 is charged on categories containing hourly and salary/non-exempt employees

1.5 PERFORMANCE

RESPONSIBILITIES OF THE FIRM/TEAM

1. The firm/team shall manage, monitor, coordinate, and ensure that all contract work activities are performed and completed in a timely, professional manner. The firm/team shall be responsible for coordinating all aspects of work among its project team, DWM staff, subcontractors, and any other agencies that may be involved with the work.

2. The firm/team will gather all information necessary to complete the work, with support and assistance from DWM as necessary.

3. The firm/team shall maintain tight schedule and fiscal control to keep project timelines on track and expenditures at or below budget limits. The firm/team will propose goals and milestones for delivery defined within time and budget limits and subject to DWM approval.

No change of any task scope, schedule or budget is allowed without the written authorization and approval of DWM.

4. The firm/team shall present to the DWM for its approval a clear, understandable and easily accessible method for determining the progress of the work.

5. The firm/team will be prepared to perform field work during non-business hours, weekends and/or holidays when necessary to avoid major traffic interference or other disruptions deemed unacceptable by the City.

6. The firm/team shall provide traffic control at worksites when applicable.

7. The firm/team will return worksites back to pre-disturbance conditions, including repairs to roadways, sidewalks, curbs, etc.

8. The firm/team shall obtain all necessary federal, state and local permits prior to performing the fieldwork. Work schedules will be adjusted to accommodate restrictions imposed by permits, local ordinances or other City requirements.

9. The firm/team shall be responsible for damaged or lost equipment to ensure limits.

1.6. CLEAN-UP

A. Service Provider shall immediately notify Manager of any spills, safety incidents, accidents, suspected criminal activity, improper activities and any violations of Local, State, and Federal laws, rules, regulations and designated City policy.

B. Service Provider shall promptly clean-up all spills from their operation per Local, State and Federal laws and regulations. Service Provider is responsible for any fines as a result of a spill.

1.7. DELAYS AND FAILURE TO MEET PERFORMANCE STANDARDS

In the event of persistent or repetitive failure on the part of the Service Provider to meet the terms of this Agreement, the City reserves the right to contract with one or more other service providers to provide the equipment and/or manpower to step in and supplement the Service Provider’s performance. The City’s right to step-in and supplement shall in no way modify the City’s termination rights or other remedies under this Agreement.

2.0 SCOPE OF SERVICES

The Contractor’s Basic Services ("Basic Services") shall include but not be limited to the provision of various professional services as hereinafter stated that include geotechnical, environmental engineering testing and investigations, soil sampling, wash boring, and diamond rock coring, topographical surveying, mapping utilities services incidental thereto.

The following types of projects are representative of projects included in the City's Geotechnical, Environmental, Engineering Testing, Topographical Surveying and Investigation Services. The technical speciation Section 01050 – details the scope of work for the Topographical surveying services

2.1 PHASE I — ENVIRONMENTAL SITE ASSESSMENT

Through this Phase I Environmental Assessment, the Contractor shall determine or discover the obvious presence or likely presence of hazardous material, which has been released or is likely to be released on the site. The range of contaminants considered should be consistent with the scope of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and should include petroleum products. This investigation shall consist of a review of the following sources of information regarding the previous use and ownership of the sites under consideration but shall not be limited to these sources of information if the Contractor deems additional sources of information as important or necessary to the thorough and successful completion of the contamination assessment process.

1. Land use history, including names of previous owners and major activities conducted on the property, for a period of at least 50 years, a general characterization of

Surrounding Land Uses.

2. Aerial photographs which may reflect prior uses of the real property and which are reasonably obtainable through state or local government agencies, or through utility companies review available public agency topographic maps, studies, and information on geology, soils, and surface water in the immediate vicinity of the properties.

3. Determination of the existence of recorded environmental cleanup liens against the real property which has arisen pursuant to federal, stale, and local statutes.

4. A visual site inspection of the proposed sites and facilities and improvements on the real property, and a visual inspection of immediately adjacent properties from the proposed sites, including an investigation of any chemical use, storage, treatment and disposal practices on the property. In addition, the focus of the site visit will be on the identification of visual potential sources of adverse environmental impacts such as the presence of underground storage tanks, aboveground storage tanks, stored drums, waste storage piles or impoundments, pipelines, and land filled materials. Identify specific areas on the subject properties where, based upon the above, testing and/or subsurface investigations may be required the photograph pertinent conditions observed during site inspection. The extent to which these inspections will be performed will vary based on the property size, type, current usage and past usage.

5. Federal, state, and local government records of sites or facilities where there have been releases of hazardous substances and which are likely to cause or contribute to a release or threatened release of hazardous substances on the real property. This includes investigation reports for such sites or facilities, federal, state and local government environmental records, obtainable through a Freedom of Information Act request of activities likely to cause or contribute to a release or threatened release of hazardous substances on the real property which including landfill and other disposal location records, underground storage tank records, hazardous waste handler and generator records and spill reporting records and such other federal, state, and local government environmental records which report incidents or activities which are likely to cause or contribute, to release or threatened release of hazardous substances on the real property.

These data sources include the following regulatory database lists and files and the minimum search distances in miles:

a. Comprehensive Environmental Response, Compensation, and Liability Information

System (CERCLIS), 5-mile,

b. National Priorities List (NPL), 10-mile,

c. Facility Index Listing (FINDS), subject sites

d. Federal Agency Hazardous Waste Compliance Docket, l mile,

e. Federal RCRA TSD Facilities List, 1-mile,

f. Federal RCRA Generators List, - Subject sites arid adjoining properties.

Other documents, if available and applicable, include:

a. Georgia State Underground Storage Tank File, - Subject sites and adjoining properties,

b. Georgia Hazardous Site List, 5-mile.

The outcome of Phase I site assessment should determine and recommend the necessity for completing a Phase II Environmental Assessment. If Phase II is recommended for completion, a separate request and contracting document will be initiated.

2.3 PREPARATION OF PHASE II ENVIRONMENTAL ASSESSMENT

If requested, in writing, by the City's Representative, but presented as a separate study authorized by the City, the Contractor shall prepare a Phase II Environmental Site Assessment examining the sites under consideration by the City for the proposed action. The Phase II Assessment will be a continuance of the investigation conducted during Phase I Environmental Site Assessment, Information reviewed for Phase II shall include some or all of the following items, as well as other sources of information the Contractor deems necessary for the successful completion of the study:

1. Sampling of soil from representative locations throughout the entire site area, or other areas as specified by the scope of work, to determine the existence of any significant contamination from past or present circumstances and activities;

2. Sampling of suspect building materials for such contaminants as asbestos, lead, radon, and other materials:

3. Installing geophone or equivalent temporary borings or groundwater monitoring wells and collecting and analyzing groundwater samples:

4. Monitoring ambient air quality;

5. Sampling and identifying potentially hazardous wastes stored on-site;

6. Options for abatement of any and all contaminated materials on the site in full compliance with existing state and federal regulations;

7. Prior to beginning any on-site work, the Contractor shall: obtain permission to enter upon the site from the property owner of records and, notify all municipal agencies and service utility companies having jurisdiction over the area in which the work is to be performed through the Utilities Protective Services "one call" program in order to protect all existing sewer, water, gas, electricity, and other utility services and structures. In the performance of this work, the Contractor shall provide safe support and necessary protection to adjacent property and structures and maintain safe conditions to protect life, limb, and property.

2.3 GUIDELINES FOR PHASE I/PHASE II ENVIRONMENTAL SITE ASSESSMENTS

1. Background and Regulatory/Requirements

The Comprehensive Environmental Response, Compensation, and Liability Act of 1980

(CERLCA), also known as Superfund, was created to provide the authority arid with a source of funding for cleaning up hazardous substances released into the environment. A basic goal of

Congress in writing CERCLA was to make those who are in control of property (owners and operators) contaminated by hazardous substances financially responsible for their clean up.

Under CERCLA, you are potentially liable for cleanup if you were a past owner/lessor/lessee of property when it was contaminated or a current owner/lessor/lessee of contaminated property, or if you buy or lease property already contaminated by someone else.

Current property owners who did not cause Contamination may still be financially liable for contamination associated with because of CERCLA'S provisions of strict liability (or contamination) and joint and several liability among potentially responsible parties (PRP's).

The Superfund Amendment and Reauthorization Act of 1986 (SARA) amended legislative, regulatory, and judicial climate has provided notice to property buyers, developers, and lending institutions of the environmental risks associated with purchasing property. In some cases, the cost of cleaning up a hazardous waste site can far exceed the value of the property. This risk, as well as the "innocent purchaser" defense, has created the need for environmental site assessments.

A Phase I Environmental Site Assessment is an IQ mechanism used to identify and analyze the potential environmental risks and liabilities associated with a real estate transaction. It has three basic components: a site inspection, a historical records search, and public agency file review.

Results are provided in a report.

A Phase II Environmental Site Assessment is required if the results of the Phase I indicate the possible presence of contaminated substance(s), or the need for additional information. The purpose of the Phase Il is to confirm the presence of contamination, determine its type(s), outline and summarize the number of remedial actions that may be required and list any potential risks to current/future users. They will also identify a range of the potential remediation costs. A rough estimate of how long it may take to complete Results are provided in a report.

2. Procedures

A thorough inspection of the site is usually conducted first to familiarize the assessor with the physical parameters of the property and the surrounding properties. During this inspection, the assessor inspects the property and adjacent properties at the property line for signs of obvious contamination such as discolored soil, dead vegetation, underground tank appurtenances, leaking drums or other containers, transformers and, if needed, evidence of asbestos or radon gas. The assessor also takes note of all current facility users and any relevant activity that may have affected the property being assessed. These observations are documented with photographs. If the property is undeveloped, a historical review of agricultural use of the area is conducted to identify possible pesticide or herbicide use. The site visit can include interviews with current business owners and employees to determine current use of the property. Surrounding business owners and employees may also determine past uses of the site and surrounding areas.

Historical records are also searched to determine historical ownership and occupancy of the subject property for the past 50 to 100 years. Chain-of-title documents are obtained from a title company and are reviewed for property ownership. Because property owners are not always property occupants, historical maps and city directories are viewed for property occupancy.

Available aerial photographs are also reviewed for historical and current property occupants and uses. Aerial photographs are often available for the past 50 to 60 years and property development can be verified by reviewing them.

Public agency tiles are then reviewed for information on the subject property. Environmental regulatory agency files are reviewed for documentation of hazardous substance contamination and/or regulation of the subject property. Files and site lists are reviewed at the U.S.

Environmental Protection Agency (EPA).

When required, local and county agencies such as fire departments, health departments and public works department records are also reviewed. These local agency files may contain building and commercial utilities permits (water, sewer, and electrical permits), fire department inspection records/permits for buildings and underground storage tanks and information on zoning adjacent landfills, and electrical transformers. Interviews with representatives of these local agencies are conducted to expand the information found in file reviews.

Based on the site inspection, interviews, historic records, and public agency file reviews, a report is prepared that summarizes the findings and presents recommendations for field and laboratory work, if required. If contamination is identified or suspected, soil and groundwater samples may be collected and analyzed.

3. Substances Addressed during Assessments

While conducting an Environmental Site Assessment, the assessor should be aware of the most common contaminants for a given site, what they are, where they exist, and what may be involved in responding to their presence. Historical and agency research provides the background information needed for determining contaminants present at the site, Hazardous substances commonly found include:

a) Polychlorinated biphenyls (PCBs)

b) Chlorinated Hydrocarbons

c) Petroleum Products

d) Pesticides and Herbicides

e) Heavy Metals

f) Hydrogenated solvents

g) Asbestos and Lead Based Paint Surveys

The number of samples collected will depend on the size of the building and the type of materials found during our site inspections.

2.5 ASBESTOS AND LEAD BASED PAINT SURVEYS

This work will be based on a visual observation of the building components, types of materials used in the construction and a physical assessment of the suspected asbestos and lead-based paint materials. Based on the assessment, the building will be subdivided into sampling areas; each sampling area consisting of homogeneous materials. An inspector will then collect the minimum required samples in accordance with the applicable requirements by AHERA and OSHA. The samples will be transported to the laboratory for testing. A report will be prepared to document the test results and provide a recommendation for abatement and/or repairs.

The City may request all, some, any combination of or none of the services identified in this

Scope of Services. When the City desires services contemplated under this Scope of Services, the

City will contact the Contractor and request a written proposal, estimate of costs and preliminary schedule for the work to be performed on each specific project based on the Scope of Services desired by the City.

2.6 SUBSURFACE UTILITY INVESTIGATION

Subsurface utility investigation services shall consist of industry standard inspections and subsurface investigative techniques including field exploration, utility records review, subsurface geotechnical imaging such as electromagnetic (EM) metal detection, ground penetration radar

(GPR), vacuum excavation, etc. along with analysis, evaluations with appropriate professional interpretations and quality control thereof as well as preparation of report(s) and drawings of existing subsurface utilities and structures. Standards that shall be referenced include Standard

Guide for Using the Surface Ground Penetrating Radar Method for Subsurface Investigation

(ASTM D6432) and Standard Guide for Use of the Metal Detection Method for Subsurface

Investigation (ASTM D7076).

The ground penetrating radar system used shall system consist of a 350 MHz HS digital antenna made by Geophysical Survey Systems Inc. (GSSI), or approved equal equipment, to perform an upper profile geophysical survey. Provide geotechnical sampling and other available methods to verify results of geotechnical imaging as necessary. General reporting and requirements for subsurface investigations are as follows:

1. Field reports/drawings shall locate all possible or probable underground utilities and structures to the depth of 8 feet with their probable sizes, buried depth and type of materials.

2. For services involving subsurface soil condition investigation, field reports/drawings shall all identify all possible subsurface voids under pavements to a minimum depth of 8 feet with its probable dimensions.

3. When the City requests that buried utilities or any potential voids under pavements within the City Rights-of-Way be marked in the field, without a formal report, the proposed area will be free-scanned to allow the data to be interpreted in real-time without post-processing. Approximate locations of any anomalies consistent with buried utilities will then be marked in the field, and their approximate locations will be noted.

4. Data points and cultural features such as roads, buildings, fire hydrants, manholes, storm inlets, valve boxes, utility poles, etc., shall be referenced.

5. Any clearing required for the subsurface investigation is the responsibility of the

Contractor. Prior approval must be obtained from the City before performing any clearing.

Services shall be provided on an on-call, as-needed basis with a minimum 24-hours advance notice for the entire duration of the Agreement, including weekends as required.

2.7 GEOTECHNICAL TESTING & TESTING LABORATORY SERVICES

Geotechnical testing and inspection services shall include field sampling and/or testing as directed by the City.

Geotechnical testing and testing laboratory services shall include:

1. Observation, testing, and inspection of subgrade, bedding, backfill and soil compaction placement operations.

2. Engineering consultation on an as needed basis for tunneling, rock excavation, excavation safety or geotechnical engineering services.

3. Field density testing of subgrade, base, and backfill materials using nuclear density gauges, drive tubes, and/or sand cone.

4. Observation and testing of site excavations, bedding, and backfill operations.

5. Observations and recommendations regarding OSHA trench safety and construction guidelines.

6. Recommendations regarding rock excavation including quantification on an as needed basis.

7. Laboratory testing for Proctor, moisture, sieve analysis, Atterberg Limits, including maximum dry density determination and optimum moisture determination and testing for

Standard and/or Modified Proctor Tests.

8. Field testing of concrete materials including slump, air, temperature, moisture content, placement time.

9. Concrete compressive strength testing including storage.

10. Grout cube compression testing and storage.

11. Examination of in-place materials with regard to suitability for placement with regard to organic content or content of other deleterious materials.

12. PID (Photo-ionization) soil contamination testing and observation.

13. Penetration Testing and Soil Sampling in overburden soil.

14. Auger Boring

15. Diamond Rock Coring

Field reports shall summarize all observation and test results and may include the combination of subsurface investigation techniques such as ground penetrating radar and metal detection with geotechnical testing.

Services shall be provided on an on-call, as-needed basis with a minimum 24-hours advance notice for the entire duration of the Agreement, including weekends as required.

2.8 SPECIFIC SCOPE REQUIREMENTS

The following are typical, yet specific services that may be required from Contractor for the City:

1. Attend project kick-off and progress meetings and prepare minutes of meetings;

2. Collect and compile information;

3. Preparation of preliminary engineering, final engineering and design development reports;

4. Presentation of information at public forums when requested and directed by City.

5. Feasibility studies on Proposed projects, including studies of City’s needs, analysis of conditions or methods of operation, development of alternative concepts, economic analysis, environmental studies and site location studies;

6. Site disturbance and building permits;

7. Geotechnical investigations, archeological, tree impact survey and replacement drawings and environmental permits and surveys;

8. Consultation, coordination and permitting interaction with: Environmental Protection

Agency (EPA) and Environmental Protection Division (EPD); Army Corps of Engineers, Georgia Department of Transportation (GDOT), railroad corporations or other permitting agencies;

9. Planning, scheduling, monitoring, controlling, estimating, budgeting and cash control for specific projects;

10. Maintaining document tracking and control system for duration of project;

11. Development and preparation of detailed calculations, engineering designs, drawings, cost estimates and technical specifications for use with the City's standard contract documents;

12. Development of additional standards for use in the project and for separate submittal to the City for incorporation into the City's standard specifications and details in the absence of such;

13. Issuing supplementary details and instructions as required;

14. Reviewing shop drawings for general compliance with design requirements and contract documents:

15. Reviewing progress certificates and potential change orders for City’s acceptance;

16. Making periodic site visits to assess general progress and conformity of the work with the contract documents;

17. Participating in the testing and start-up at the conclusion of construction;

18. Ensuring that the contractor's as-built record drawings are accurate and up to date on a periodic basis and upon completion of the project, and in format which adheres to the

City's graphic standards:

19. Providing reference surveys to the contractor and, where necessary, checking the contractor's surveys;

20. Providing field sketches or drawing mark-ups to record changed conditions or minor modifications to the plans;

21. Monitoring all prescribed field testing and inspection of materials and equipment; review test results and submissions for adherence to contract documents and special instructions;

22. Maintaining sufficient data to outline current progress of the work and certifying the contractor's request for payments regarding progress, quantities of work completed, materials delivered to the site and potential change orders, including photographic documentation;

23. Providing GPR services to support certain engineering applications such as locating buried infrastructure, studying soils and bedrock, and nondestructive testing of structures and pavements;

24. Rock Coring

25. Laboratory Materials Testing and Engineering: All laboratory test reports shall clearly identify the laboratory at which the test was performed. Test reports shall provide a clear description of each test performed so that the sample and its location are uniquely identified;

26. Sample preparation.

27. Safety program compliance;

Note:

A. All testing will be performed within the bounds of the City’s service areas. The Contractor shall respond to all requests for testing and engineering services within the time frame specified by the City. If the method of testing is not listed, the test will be performed in accordance with an appropriate certifying agency such as ASTM, AASHTO, etc. The results of all tests and engineering services shall be reported to the City in a manner consistent with industry standards and satisfactory to the City;

B. If field sampling or testing has been unreasonably delayed through no fault of the Contractor, the technicians' time shall be reimbursed. This time can be claimed only if the time of delay is signed-off by the City’s on-site representative at the time of the delay (same day). Said documentation shall be included with the invoice.

2.9 SURVEYING AND MAPPING SERVICES

The purpose of the topographical surveying and mapping utility services is to collect accurate spatial, elevation, and site‑feature data to support planning, engineering design, construction, and land development activities. It requires measuring, and mapping natural and man-made terrain features—elevations, structures, utilities, and vegetation—to support civil design and construction. It includes field data acquisition using RTK, total stations, or drones, boundary definition, and the delivery of digital, contour-enabled, CAD-compatible site plans.

The survey will provide a detailed representation of the site’s natural and built features following the DWM’ survey specification Section 0105.

SECTION 01050

SURVEY

PART 1 GENERAL

1.01 GENERAL

A. A Georgia Professional Land Surveyor(s) shall be responsible for the field and office work.

B. The survey shall be performed and meet the Georgia Professional Engineers and

Land Surveyors Board’s Rules and Regulations in Chapter 180-7, Technical

Standards for Property Surveys (pels.georgia.gov/laws-rules-policies/).

C. Plats and final documents require Georgia Professional Land Surveyor seal with signature and date.

D. Survey documents shall be submitted as a PDF and electronic files per AutoCAD

DWG (default), or AutoCAD Civil3D DWG. Latest software version.

1. Progress PDF and DWG submittal may be requested for projects that the duration exceeds 2-months.

2. Some survey requests may be per the GDOT Automated Survey Manual.

This is generally for ATLDOT and GDOT related projects, and not an

AutoCAD DWG product.

E. The finish scale shall be 1” = 20’, 1” = 30’, 1” = 40’, 1” = 50’, or 1” = 100’ unless otherwise noted. The plat may to fit on a minimum sheet size of 11”x 17”, maximum sheet size of 22”x 34” with a ½” border, or 24”x 36” with ½” border.

Scans and images created electronically shall be at full size and legible at a resolution of 300 dpi.

1.02 LOCATION

A. Access to private property requires the landowner to sign a Right-of-Entry prior to the surveying, debris removal, and geotechnical exploration. See PART 3.

B. Attachment A is a drawing for the limits of the survey. (Preferred option)

C. Property Address is 007 My Street SW, Atlanta Georgia 30303.

D. Project limits description…

1.03 ACCURACY

A. Surveys shall be tied to or referenced to Georgia State Plane Coordinate System

West Zone, 1983 North American Datum (2011).

B. Topography for 1-Foot Contours (all visible features). Collect topographic information at a sufficient density to generate 1-foot contours.

C. Tree surveyed point shall be the approximate center of tree. Tree symbols are to be scaled based on the DBH. The DBH inches dimension in feet should be used for the diameter of the symbol.

D. Provide traverses with closure statement. Measurements and computations shall be verifiable.

1.04 TYPE OF SURVEY LIST:

A. The survey requested is based on the items listed below. (Items not required have a strike through or deleted.)

B. Courthouse research, structure cleaning, and 811 coordination costs shall be included in the proposal.

C. Determination means location of the existing feature. Establishment means a new feature. Location (pins, stakes, monuments, and flags) are set in the field.

D. Type of Survey:

1) 811 Locates:

i. File on GA811Protal a Design Ticket and forward all emails.

ii. DWM has filed a Design Ticket and will forward all emails.

2) Boundary and Right-of-Way:

i. Determination

ii. Establishment

3) Topographic (structures, roads, driveways, walls, fences, utilities, and all visible features)

4) LIDAR Surveys:

i. Topographic

ii. Underground Structures, Vaults, and Manholes

5) Asbuilts

6) Flooded Elevations (survey the limits of recent flooding)

7) MARTA ROW

8) Railroad ROW (Railroad fee is a pass-through expense)

9) Sonar Lake Surveys

10) Underground Utilities and Appurtenances:

i. All

ii. Cable TV

iii. Combined Sewers

iv. Communication

v. Electrical

vi. Fiber Optics

vii. Force Mains

viii. Gas Mains and Lines

ix. Sanitary Sewers

x. Storm Sewers

xi. Water Mains

xii. Water Service Lines

xiii. Others

11) Subsurface Utility Engineering (SUE)

i. Quality Level A (QL-A)

ii. Quality Level B (QL-B)

iii. Quality Level C (QL-C)

iv. Quality Level D (QL-D)

12) Tree Surveys:

i. 4-inches and larger

ii. Landscape and Shrubbery

iii. Tree DBH (Diameter Breast Height) inches:

1) Visual Estimate by survey crew

2) Measured by survey crew

3) DBH and species by Arborist or Landscape Architect

iv. Annotation:

1) DBH” TEXT (16” HWD)

a) Text is either HDW or PN (Hardwood or Pine)

2) Text is Arborist’s or Landscape Architect’s DBH and

Species

13) Easement Plats:

i. Easement Determination

ii. Easements Established coordinated with DWM

1) Generally, 20-feet wide centered and extend 10-feet beyond the storm outlet.

2) Preferred procedure is to provide the Design Manager with the DWG file(s). The Design Manager will draw the easements on a new Layer.

iii. Easement Plats with Description

14) Property Plat(s) with Description

15) Set Property and Easement pins

16) Set ROW and Control Monuments

17) Extra Office Hours, ##.

18) Extra Field Days, ##.

PART 2 PROCEDURES

2.01 GENERAL

A. Projects and scope of work can involve working with DWM GIS, Fulton GIS, and

DeKalb GIS for asset collection and inventory.

B. Provide three Benchmarks per site, more for larger sites as required.

C. Trash and debris filled underground structure may require commercial vacuum truck cleaning.

D. Contact the DWM Project Manager or Design Manager for manhole lids that cannot be opened. OES can only request those exposed lids to be opened. Lids not opened and/or covered with pavement shall be noted on the survey.

2.02 SUBSURFACE UTILITY ENGINEERING (SUE) QUALITY LEVELS

A. Quality Level A (QL-A), Locating

1. The highest level of accuracy. Information is obtained through precise horizontal and vertical location of the utilities.

2. Obtained by the actual exposure and subsequent measurement of subsurface utilities.

3. Precise horizontal and vertical position and all significant utility attributes shall be included on the survey.

4. Underground structure’s center established, not always the manhole lid center.

B. Quality Level B (QL-B), Designation

1. Information is obtained through the application of appropriate surface geophysical methods to identify the existence and approximate horizontal position of subsurface utilities.

2. Information is surveyed to standard tolerances, correlated with existing records and surface features, and shown on the survey.

C. Quality Level C (QL-C), Surface Visibility Feature Survey

Information is obtained by surveying and plotting visible above-ground utility features and by using professional judgment in correlating this information to

Quality Level D information.

D. Quality Level D (QL-D), Existing Records

Information is derived solely from existing records and verbal recollection.

2.03 CONTROL TRAVERSES

A. A primary control traverse of first order accuracy to be established along (Insert description). This traverse is tied to State Plane Coordinate System. Concrete monuments with brass tablets are set at approximately (Enter distance) intervals along the route as well as a minimum of three monuments at each end of Project and (Enter other locations as appropriate).

B. Coordinates and vertical datum are established using the Global Positioning

System method and checked by triangulation between known existing monuments in area.

C. In comparing actual measured distances with distances calculated from coordinates or project stationing, it will be necessary to take account of scale factors given on the Overall Alignment Geometry Drawing.

D. Provide monument sheets with descriptions with location sketches for all monuments set.

E. Establish benchmarks along the traverse. Three per site, more as required.

PART 3 RIGHT OF ENTRY

RIGHT OF ENTRY

STATE OF GEORGIA

COUNTY OF FULTON

This agreement (“Right of Entry”) is entered into between the owner(s) of certain property, Happy Citizen, located at 007 My Street SW, also known as Fulton County Tax ID Parcel 00

00000000000. (“Property”), and the City of Atlanta, its agents, or representatives (“City”).

GRANT: The Owner grants to the City the right to enter upon the Property for the purposes of ingress and egress and to undertake certain work, including Surveying, Silt Removal, Debris Removal, Geotechnical Borings, and Sewer Asset Work (“Project.”)

The Owner further grants to the City permission to perform any and all tasks necessary for the completion of the Project. The work shall be done at the expense of the City and with as little inconvenience to the Owner as is consistent with reasonable progress, and the Property shall be restored to a reasonably clean and good condition upon completion of the Project. This work may be performed at the City’s sole discretion, and nothing in this agreement shall obligate the City to commence any work that it deems unnecessary.

The Owner acknowledges and agrees that it holds legal title to the Property, has full authority to sign this Right of Entry, is the only current owner of the Property, and that the signature and consent of no other person or entity is needed on this Right of Entry in order to fully effectuate the intent of this agreement.

HOLD HARMLESS: The Owner releases, discharges, and waives any action, either legal or equitable, that might arise by reason of any action of the City, while undertaking the

Project and exercising the Right of Entry. Such waiver shall not apply in the event of gross negligence or intentional misconduct on the part of the City in undertaking the Project and exercising the Right of Entry.

DISCLAIMER: The Owner agrees that the City has no obligation to perform future maintenance, repairs, or upgrades on the Property or other work related to the Project and that any future access or work will be subject to a separate agreement. In addition, nothing contained in this Right of Entry shall be construed or interpreted as acceptance by the City for ongoing ownership or responsibility for the maintenance or repair of any infrastructure or facilities.

Owner

By:

Date: _________________________

By:

Address of the property owner:

007 My Street SW, Atlanta, Georgia

Date: _________________________

+++END OF SECTION+++

END OF SCOPE OF SERVICES

SECTION 01350

PROJECT DOCUMENT TRACKING AND CONTROL SYSTEMS

PART 1 GENERAL

1.01 SCOPE

A. Utilize DWM of Atlanta’s Project Document Tracking and Control System (DTCS). Primary function of system is to facilitate timely processing and approval of all contract documentation in coordination with overall Project Schedule established by these Specifications and Contractor.

This system will utilize Trimble Unity Construct software for document tracking and control, or other software as determined by City of Atlanta. Trimble Unity Construct software will provide the following:

1 Facilitate communication between Owner, Engineer, and Contractor.

2 Facilitate turn-around time regarding responses and approvals.

3 Provide a central location for all Project information to facilitate all Project participants in performing their tasks based on latest Project data.

4 Provide a standard system of project administration with accountability.

i. Pay Application Process.

ii. Submittals.

iii. RFIs.

iv. Change Notifications.

v. Daily logs.

B. Utilize web based DTCS system to generate documents in proper format for submission to

DWM. Contractor shall access system through internet using a compatible web browser.

C. Generate Project documents and records utilizing the system. Tansmit and submit Project documents within system to DWM.

D. Utilize a high-capacity scanner capable of scanning 11 x 17 documents, double sided, on site for entire duration of Project. All documents must be scanned in and attached to appropriate document, including submittals, shop drawings, O&M’s, and other documents requested by the

Engineer.

E. The Contractor shall utilize Trimble Unity Construct to create and maintain Project documents, including, but not limited to the following:

1. Company Directory: Addresses, Phone Numbers, Personnel Contacts, etc.

2. Drawings Log: Current Drawing revision log

3. Submittals (Integrated with Project Schedule through Activity codes)

4. Transmittals

5. Requests for Information and Answers (RFIs)

6. Change Documents, Including:

i. Requests for Proposal (RFPs)4/2025

ii. Work Authorizations (WAs)

iii. Change Order Requests (CORs)

iv. Change Orders (CO)

v. Design Clarifications (DC)

7. Daily Reports (Daily Diaries)

8. Field Decisions & Clarification Memos

i. Notice of Non-Compliance

ii. Construction Issue Memos

iii. Punchlists

iv. Meeting Minutes & Agendas

v. Correspondence

vi. Work Plans

vii. Start-up Plans

viii. Equipment Operation and Maintenance Training; and

ix. Spare Parts lists.

F. The Contractor shall utilize the complete capabilities of Trimble Unity Construct to meet the requirements of this Section. The Contractor shall provide a highly trained and experienced construction project controls person knowledgeable in construction work sequencing, productivity, scheduling and invoicing. This person, along with the Contractor’s management team, shall work closely with the City to deliver the documents outlined in this Section.

G. Software Provision and Training: DWM will provide access to Trimble Unity Construct software at no cost. DWM will provide training in the use of Trimble Unity Construct software to at least one Contractor’s employee at no cost. It shall be the responsibility of the Contractor to ensure that staff attend City-provided training and are afterwards proficient in the use of Trimble Unity

Construct software.

H. The Contractor shall be required to establish an internet connection to connect to Trimble Unity

Construct, permit the forwarding and receipt of documents.

I. The Contractor shall meet with the City within 15 days after the Contract is awarded to discuss access requirements and the Contractor’s plan to utilize Trimble Unity Construct and execute the document control functions herein.

J. Access through the internet to Trimble Unity Construct shall be operational within 15 days following the pre-construction meeting date.

1.02 COMPANY DIRECTORY

Contractor and DWM will monitor and manage the Company Directory. The Directory must include

Company name, Company abbreviation, contact names, address, phone numbers and e-mail address.

1.03 SUBMITTALS/SHOP DRAWINGS

A. Requirements: This section specifies supplemental requirements to General Conditions related to the processing of submittals and shop drawings. The Contractor will utilize Trimble Unity

Construct to log and track submittals, as well as generate associated transmittal letters.

B. Submittals & Product Data: A list of all required submittals will be entered into Trimble Unity

Construct by the Contractor. Submittals shall be incorporated into packages, with the submittal numbering format to be provided by the COA’s engineer. The Contractor will log and track all submittals utilizing Trimble Unity Construct. Each review cycle shall be entered into Trimble

Unity Construct. The Contractor shall identify as activities in the CPM schedule, to include all data submittals, as well as those involving complex reviews and long lead deliveries, and all procurement items required for construction activities. Submittal schedule information shall be updated monthly with the Contractor’s updated project CPM schedule.

C. Guarantees/Warranties: A list of all required Guarantee/Warranty submittals will be entered into

Trimble Unity Construct by the Contractor. These submittals shall be identified as individual submittals within the submittal packages with numbering as specified above.

D. Work Plans, Start-up Plans, O&M Submittals and Spare Parts: All testing, Start-up and O&M submittals will be entered into Trimble Unity Construct by the Contractor. These submittals shall be identified as individual submittals within the submittal packages identified with numbering as specified above.

E. Submittal Procedures: The Contractor shall prepare all submittal packages utilizing the submitting system, description and packaging conventions described above. Submittals prepared by the Contractor, which fail to follow the conventions described above, will be returned “amend and resubmit”. Should the Contractor determine that a submittal is required and is not covered by the listing within Trimble Unity Construct, the contractor, consultation with the City to determine the submittal number, description and packaging will be required.

1.04 CORRESPONDENCE

The City shall monitor and manage the correspondence, Non-Compliance Notices, Field Decisions &

Clarification Memos and Construction Issue Memo logs. The Contractor is responsible for generating

Project correspondence within Trimble Unity Construct and forwarding the correspondence to the

City.

1.05 TRANSMITTAL LOG

The Contractor and the City will monitor and manage the transmittal log. All Project transmittals shall be created electronically, automatically sequentially numbered and logged into Trimble Unity

Construct system as they are created. The Contractor is responsible for utilizing the system to create transmittals for items transmitted to the Owner, Engineer, Resident Inspection Staff and other

Contractors.

1.06 REQUEST FOR INFORMATION & ANSWERS

The Contractor shall be responsible for generating RFIs on Trimble Unity Construct system. The

Contractor shall notify the City when an RFI is submitted. The City will monitor and manage the RFI log. The City will generate an Answer document in response to each RFI and forward them to the

Contractor. Trimble Unity Construct will track “Ball in Court” for all RFIs and Answers, as well as date of original generation and response date. In addition, the RFIs will reference the relative

Specification Section and Drawings. The Trimble Unity Construct will identify the date of the…