Statement of Need - Utility Tractors updated.pdf

PDF 132 KB Posted

Attached to
460 CES Compact Utility Tractors
Solicitation number
FA254325Q0020
Issued by

About this file

This Statement of Need details the US Space Force's requirement for two utility tractors for mission-critical base operations at Buckley Space Force Base. The specific requirements include 4-wheel drive diesel tractors with 38.7 horsepower, a 31.1 Power Take Off (PTO), 2,200 lbs lifting capacity, closed cab with heat and air conditioning, and a front-mounted blade attachment. Delivery must occur within 190 days after contract award, with transportation via a lowboy delivery vehicle due to limited base access and no off-loading ramp. The tractors will be primarily used for multiple operational tasks, with a specific emphasis on snow removal operations, and will be inspected by government officials upon delivery.

View the file

Other files

File Type Posted
Utility Tractors Solicitation Description Verbiage.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF NEED

US Space Force Utility Tractors

Current as of 23 April 2025

1. SCOPE:

460 CES requires two (2) Utility tractors to conduct mission essential base operations.

Utility tractor will be in use consistently for multiple actions including all snow removal operations.

2. REQUIREMENT:

Product Quantity Utility Tractors 2

3. SPECIFICATIONS:

-Utility Tractor Shall be 4-wheel drive.

-Utility Tractor shall be powered by diesel fuel.

-Utility Tractor Shall be closed cab with heat and air conditioning.

-Utility Tractor shall have a Front Mounted Blade attachment

-Utility Tractor shall have 38.7 horsepower

-Utility Tractor Shall have a 31.1 Power Take Off (PTO)

-Utility Tractor Shall have a lifting capacity of 2200lbs (998kg)

4. DELIVERY:

Must be delivered to Buckley Space force Base. A lowboy delivery vehicle will be required, as there is limited access and no off-loading ramp available. The contractor shall deliver the above requirements no later than 190 days after receipt of a w a rd.

Items, when delivered, will be accepted and inspected by the government officials responsible for receiving the products and performing any required inspections.

File details come from the government source that posted it. Updated .