STATE 0000000524SL-01.docx

DOCX document 226 KB Posted

Attached to
Pump & Treat Services of Contaminated Groundwater
Solicitation number
300000263731026
Issued by
Missouri

About this file

Summary: RFP for Pump & Treat Services of Contaminated Groundwater

This is a Request for Proposal (RFP) issued by the State of Missouri's Office of Administration, Division of Purchasing, on behalf of the Department of Natural Resources for pump and treat services of contaminated groundwater at the Valley Park TCE site. The solicitation (STATE 0000000524SL) seeks a contractor to provide operation, maintenance, and management of the Groundwater Extraction & Treatment System (GETS), which addresses volatile organic compound contamination, primarily trichloroethene (TCE), in the groundwater at Valley Technologies, Inc. in Valley Park, Missouri. Services include project planning, management, system operations, air stripper maintenance, groundwater extraction system operation, remote monitoring, chemical handling, sampling, data management, and coordination with local, state, and federal agencies. The contractor must meet minimum experience requirements of three years in GETS operation and maintenance, site inspection, report preparation, remote monitoring, and related activities. Required personnel include a Missouri-licensed project engineer, field engineer, senior scientist (licensed professional engineer or geologist), and junior scientist (licensed professional engineer or geologist with one year minimum experience). A non-mandatory facility tour is scheduled for August 20, 2026, at 1:00 p.m. at the site. Proposals are due by September 2, 2026, at 2:00 p.m. Central Time, submitted electronically through MissouriBUYS powered by MOVERS. The contract period runs one year from the effective date with three optional one-year renewal periods at the state's discretion.

Pricing must be submitted on Exhibit C as firm, fixed rates for labor classifications, equipment, materials, supplies, and utilities. The contractor is responsible for all operational costs including supplies, subcontractors, system monitoring, and disposal of special waste generated by the GETS. The system must operate continuously 24 hours per day, seven days per week with no more than 10 percent downtime per month. Minor repairs (total cost ≤$10,000) do not require state approval if under $1,000; repairs exceeding $1,000 but under $10,000 require prior approval. Significant repairs exceeding $10,000 remain the state's responsibility. Monthly invoices are due by the last day of the month following service delivery, with payment due within 30 calendar days of receipt. A previous contract exists under contract number CS202656001 (RFPS30034902002656), establishing an incumbent relationship. Vendors must achieve "Approved" status in MissouriBUYS (WebProcure/Proactis) and "Spend Authorized" status in MissouriBUYS powered by MOVERS to be eligible for award. Business compliance requirements include tax compliance certification, Missouri Secretary of State registration, E-Verify enrollment documentation, and anti-Israel boycott certification. The RFP was issued August 5, 2026, with Amendment No. 01 issued August 12, 2026, revising sections 2.1.3, 2.3.1, 2.4.1, and 2.4.2.

View the file

Other files

File Type Posted
REVISED Attachment 1.pdf PDF
Attachment 2.pdf PDF
Attachment 1.pdf PDF
STATE 0000000524SL.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Missouri Office of Administration, Division of Purchasing

Request for Proposal (RFP) for Pump & Treat Services of Contaminated Groundwater

AMENDMENT NO.:
01
SOLICITATION NO.:
STATE 0000000524SL
SOLICITATION ISSUED ON BEHALF OF:
Department of Natural Resources
ISSUE DATE:
08/12/2026
CONTRACT PERIOD:
Effective Date of Contract Through One Year
REQUISITION NO.:
NA

PROPOSAL DUE NO LATER THAN: September 2, 2026 AT 2:00 PM CENTRAL TIME Proposal response must be submitted electronically through MissouriBUYS, powered by MOVERS, at https://missouribuys.mo.gov.

E-mailed, mailed, courier, or hand-delivered proposal responses will not be accepted.

RFP CONTACT INFORMATION:

BUYER: Ryan Bulinski

PHONE NO.: (573) 522 0001

EMAIL: Ryan.bulinski@oa.mo.gov See “RFP Questions” in Section 1 for appropriate communications during the procurement process.

DELIVER SUPPLIES/SERVICES FREE ON BOARD (FOB) DESTINATION TO THE FOLLOWING ADDRESS:

Department of Natural Resources 555 St. Louis Ave Valley Park, MO 63088

ATTENTION:

1. After reviewing the Request for Proposal (RFP), the vendor must complete and return Exhibit A, Proposal Signature Page and all other necessary exhibits.

2. Due to lead times for obtaining the information needed to complete the various Business Compliance Exhibits herein as explained in the RFP’s Vendor Response Exhibits, vendors are encouraged to IMMEDIATELY begin securing these verifications.

3. The vendor must be registered in MissouriBUYS, powered by MOVERS in a “Prospective” or “Spend Authorized” registration status to submit a proposal. The vendor must achieve “Approved” registration status in MissouriBUYS (WebProcure/Proactis) and “Spend Authorized” registration status in MissouriBUYS, powered by MOVERS to be considered for a contract award. Reference Section 5.

AMENDMENT #01 to STATE 0000000524SL

TITLE: Pump & Treat Services of Contaminated Groundwater

CONTRACT PERIOD: Effective Date of Contract Through One Year

PLEASE BE ADVISED OF THE FOLLOWING CHANGES AND CLARIFICATIONS:

1. To correct internal errors in MissouriBUYS powered by MOVERS.

2. Paragraph 2.1.3 and subparagraphs have been REVISED.

3. Paragraph 2.3.1 d. 1) has been REVISED.

4. Paragraph 2.3.1 d. 2) has been REVISED.

5. Paragraph 2.4.1 has been REVISED.

6. Paragraph 2.4.2 has been REVISED.

Vendors may review the revision(s) to the MissouriBUYS, powered by MOVERS electronic solicitation and the amendment document(s) at https://MissouriBUYS.mo.gov. You may be required to acknowledge the electronic amendment.

ATTENTION: IF YOU HAVE ALREADY SUBMITTED A RESPONSE TO THE SOLICITATION, ACCEPTANCE OF THE AMENDMENT AND RESUBMISSION YOUR SOLICITATION RESPONSE IS NECESSARY TO ENSURE THE STATE OF MISSOURI SUCCESSFULLY RECEIVES YOUR SOLICITATION RESPONSE.

Follow the instructions in the Reference Guide for How to Submit Response Online (https://missouribuys.mo.gov/media/pdf/movers-bid-response-instructions ) and outlined below if previously responded to the solicitation prior to the amendment issuance.

1) Log into MissouriBUYS, powered by MOVERS (https://missouribuys.mo.gov/).

2) Under Tasks click View Negotiations below Solicitations.

3) The Active Solicitations page will appear. Utilize the search filters and click on the Solicitation Number to open.

4) The Overview page will display. Click Create Response.

5) A Warning pop-up box will open. The supplier must click Yes to continue to view and acknowledge amendments.

6) The supplier should highlight the Amendment(s) and view the changes made via the amendment(s). Once the review is complete, select the Acknowledgement checkbox for each amendment and click Submit at the top right-hand corner of the page. NOTE: A Warning pop-up box will open if all amendments have not been acknowledged. Click Yes to continue.

7) A Confirmation pop-up box will open confirming amendments have been acknowledged. It will also warn that resubmission of the previously submitted response is necessary prior to response to the amendment. Click OK.

8) Supplier will need to click Create Response again and respond to the amended solicitation. NOTE: The Create Response step includes attaching the supplier’s response again.

State of Missouri Office of Administration, Division of Purchasing

Request for Proposal (RFP) for Pump & Treat Services of Contaminated Groundwater

SOLICITATION NO.:
STATE 0000000524SL
SOLICITATION ISSUED ON BEHALF OF:
Department of Natural Resources
ISSUE DATE:
08/05/2026
CONTRACT PERIOD:
Effective Date of Contract Through One Year
REQUISITION NO.:
NA

PROPOSAL DUE NO LATER THAN: September 2, 2026 AT 2:00 PM CENTRAL TIME Proposal response must be submitted electronically through MissouriBUYS, powered by MOVERS, at https://missouribuys.mo.gov.

E-mailed, mailed, courier, or hand-delivered proposal responses will not be accepted.

RFP CONTACT INFORMATION:

BUYER: Ryan Bulinski

PHONE NO.: (573) 522 0001

EMAIL: Ryan.bulinski@oa.mo.gov See “RFP Questions” in Section 1 for appropriate communications during the procurement process.

DELIVER SUPPLIES/SERVICES FREE ON BOARD (FOB) DESTINATION TO THE FOLLOWING ADDRESS:

Department of Natural Resources 555 St. Louis Ave Valley Park, MO 63088

ATTENTION:

1. After reviewing the Request for Proposal (RFP), the vendor must complete and return Exhibit A, Proposal Signature Page and all other necessary exhibits.

2. Due to lead times for obtaining the information needed to complete the various Business Compliance Exhibits herein as explained in the RFP’s Vendor Response Exhibits, vendors are encouraged to IMMEDIATELY begin securing these verifications.

3. The vendor must be registered in MissouriBUYS, powered by MOVERS in a “Prospective” or “Spend Authorized” registration status to submit a proposal. The vendor must achieve “Approved” registration status in MissouriBUYS (WebProcure/Proactis) and “Spend Authorized” registration status in MissouriBUYS, powered by MOVERS to be considered for a contract award. Reference Section 5.

RFP Organization:

RFP Sections
Section 1
Introduction and Background Information Section
Section 2
Scope of Work Section
Section 3
Terms and Conditions Section
Section 4
General Contractual Requirements Section
Section 5
Vendor Submission, Evaluation, and Award Information Section

RFP Vendor Response Exhibits (Return these exhibits with the proposal)

Exhibit A
Proposal Signature Page
Exhibit B
Proposal Submittal Checklist
Exhibit C
Pricing Page
Exhibit D
Technical Proposal – Experience of Organization and Past Performance
Exhibit E
Technical Proposal – Personnel Qualifications
Exhibit F
Participation Commitment
Exhibit G
Documentation of Intent to Participate

BUSINESS COMPLIANCE EXHIBITS

Exhibit H
State of Missouri Tax Compliance
Exhibit I
Registration of Business Name with the Missouri Secretary of State
Exhibit J
Business Entity Certification, Enrollment Documentation, and Affidavit of Work Authorization
Exhibit K
Anti-Discrimination Against Israel Act Certification
Exhibit L
Services Outside the United States
Exhibit M
Employee/Conflict of Interest

Attachments (Separate Documents) (Do not return these documents with response)

Attachment 1
Operations and Maintenance Manual
Attachment 2
Valley Park TCE Site Groundwater Extraction System Monitoring Form

Separate Documents: The vendor is advised that the separate documents to this document referenced above provide additional requirements, information, and/or instruction. The separate documents must be downloaded from the Division of Purchasing’s MissouriBUYS, powered by MOVERS, website at: https://missouribuys.mo.gov/. The separate documents are downloadable from the same web page where the solicitation document is downloadable. It shall be the sole responsibility of the vendor to obtain the separate documents. The vendor shall not be relieved of any responsibility for performance under the subsequent contract due to the failure of the vendor to obtain a copy of the separate documents.

STATE 0000000524SL Page 68

INTRODUCTION AND BACKGROUND INFORMATION SECTION

Introduction:

Purpose: This document constitutes a request for competitive, sealed proposals for the provision of Pump & Treat Services of Contaminated Groundwater as set forth herein for Department of Natural Resources (hereinafter referred to as “state agency”).

Minimum Experience Qualifications: There are minimum experience qualifications in the RFP (See Section 2.2, Minimum Experience Requirements in Section 2: Scope of Work).

Titles: Titles of paragraphs used herein are for the purpose of facilitating reference only and shall not be construed to infer a contractual construction of language.

Background and Historical Usage Information:

The city of Valley Park, Missouri has land where industrial activity resulted in releasing of volatile organic compounds (VOCs), primarily trichloroethene (TCE), into the groundwater. As a result of this finding, the Groundwater Extraction & Treatment System (GETS), which is the designated pump and treat groundwater remediation system, was put into place at Valley Technologies, Inc. through the United States Environmental Protection Agency (EPA) to provide hydraulic containment and treatment of VOC contaminated groundwater. The treatment removes the VOCs before discharging the treated water to a storm drain that empties into the Meramec River. Previously, the EPA was in charge of the GETS. Since October 1, 2019, the Department of Natural Resources (DNR), Environmental Remediation Program has taken over the groundwater operable unit (including the GETS) from the EPA.

Current and/or Previous Contract Information:

A previous contract exists for the products and/or services being obtained via this RFP. A copy of the contract can be viewed and printed from the Division of Purchasing’s Awarded Bid & Contract Document Search System located on the Internet at: https://purch.oa.mo.gov/bidding-contracts/awarded-bid-contract-document-search. In addition, all proposal and evaluation documentation leading to the award of that contract may also be viewed and printed from the Division of Purchasing’s Awarded Bid & Contract Document Search System. Please reference the RFPS30034902002656 or the contract number CS202656001 when searching for these documents.

State Expenditures: The Missouri Accountability Portal (MAP) located on the Internet at: http://mapyourtaxes.mo.gov/MAP/Expenditures/ provides financial data related to the purchase of the services under the contract. Be sure to read the information provided in the site information and disclaimer links:https://mapyourtaxes.mo.gov/MAP/Help/MapExpendituresHelp.htm and https://mapyourtaxes.mo.gov/MAP/Help/MapExpendituresHelp.htm#disclaimer. Then search by the contract numbers shown above when searching for the financial information.

RFP Questions:

Buyer is Single Point of Contact for Solicitation: Vendors and their agents (including subcontractors, employees, consultants, or anyone else acting on their behalf) must direct all of their questions or comments regarding the RFP, the evaluation, etc., to the buyer indicated on the first page of this RFP. It is preferred that questions be emailed to the buyer.

Except as noted herein, vendors and their agents are instructed not to contact any other state employee regarding any of these matters during the solicitation and evaluation process. Inappropriate contacts are grounds for suspension and/or exclusion from specific procurements. Vendors can be sanctioned for unauthorized contact with any evaluator under 1 Code of State Regulation (CSR) 40-1.060(8)(G) and (H) available at http://www.sos.mo.gov/adrules/csr/csr.asp.

Vendor is Responsible for Asking Questions About the RFP: It is the vendor’s responsibility to ask questions, request changes or clarifications, or otherwise advise the Division of Purchasing if the vendor believes that any language, specifications, or requirements are: (1) ambiguous, (2) contradictory or arbitrary, (3) violate any state or federal law or regulation, (4) restrict or limit the requirements to a single source, or (5) restrict or limit the vendor’s ability to submit a proposal.

Vendor Question Deadline: Every attempt shall be made to ensure that the vendor receives an adequate and prompt response. However, in order to maintain a fair and equitable procurement process, all vendors will be advised, via the issuance of an amendment to the RFP, of any relevant or pertinent information related to the procurement. All questions and issues should be submitted no later than ten (10) calendar days prior to the proposal closing date and time of the proposals. If not received prior to ten (10) calendar days before the proposal closing date and time, the Division of Purchasing may not be able to fully research and consider the respective questions or issues.

State’s Response to Vendor Questions: Upon the Division of Purchasing’s consideration of questions and issues, if the Division of Purchasing determines that changes are necessary, the resulting changes will be included in a subsequently issued RFP amendment(s); absence of such response indicates that the questions and issues were considered but deemed unnecessary for an RFP amendment. All vendors will be advised of any change to the RFP’s language, specifications, or requirements by a formal amendment to the RFP. There will be no posted written records of the questions/communications (i.e., formal question/answer document).

RFP is State’s Only Official Position: The only official position of the State of Missouri shall be that which is contained in the RFP and any amendments thereto.

Amendments:

If the Division of Purchasing determines that changes to the RFP are necessary, the resulting changes will be included in a subsequently issued RFP amendment(s) prior to the proposal closing date and time.

Building Tour:

Non-Mandatory Tour of Building: Potential vendors are strongly encouraged but not required to attend the tour of the Ground water extraction and treatment system at Valley Technologie located at 555 St. Louis Ave, Valley Park, MO 63088, which will be held on August 20, 2026 beginning promptly at 1:00 p.m. The purpose of the tour is to allow potential vendors an opportunity to inspect the building prior to submitting a proposal. Potential vendors shall not be permitted to schedule a tour at a different time or date.

Building Information: Vendors are advised that participation in a tour of the building is considered essential to obtain a clear and complete understanding of the requirements of this RFP. In order to have a clear understanding of the requirements outlined herein, the vendor should attend the building tour. The Division of Purchasing will maintain the attendance record from the scheduled tour as documentation of all vendors who attended the tour. However, the vendor’s response to the RFP should provide any relevant information regarding their familiarity with the physical layout, condition, etc. of the building.

Each vendor is solely responsible for a prudent and complete personal inspection, examination, and assessment of the work site condition, facilities, and/or any other existing condition, factor, or item that may affect or impact on the performance of service described and required by the Section 2: Scope of Work Section herein. The vendor shall not be relieved of responsibility for performance under the contract for any reason whatsoever, including, but not limited to, (1) the vendor’s failure to attend the scheduled tour of the building, (2) the vendor’s failure to observe existing conditions, etc.

Vendors are strongly encouraged to advise the Division of Purchasing, at least five (5) state business days prior to the scheduled tour of the facility/building, of any special accommodations needed for people with health conditions or impairments who will be attending the tour so that these accommodations can be made.

Glossary of Terms and Acronyms:

Whenever the following terms and acronyms appear in the RFP document or any amendment thereto, the definitions or meanings described below shall apply.

General Glossary, Acronyms, and Abbreviations:

Agency and/or State Agency means the statutory unit of state government in the State of Missouri for which the equipment, supplies, and/or services are being purchased by the Division of Purchasing (Purchasing). The agency is also responsible for payment, unless otherwise specified herein.

Amendment means a written, official modification to a solicitation or contract.

Attachment applies to all documents which are included with an RFP to incorporate any informational data or requirements related to the performance requirements and/or specifications.

Buyer means the procurement staff member of Purchasing.

Code of State Regulation (CSR) contains the current administrative rules of executive agencies of Missouri government. The regulations are arranged by agency rather than by subject.

Contract means a legal and binding agreement between two or more competent parties, for a consideration for the procurement of equipment, supplies, and/or services.

Contractor means a supplier, offeror, person, or organization who is a successful vendor as a result of an RFP and who enters into a contract.

Downtime means system shutdowns not associated with routine maintenance or flooding events.

Exhibit applies to forms which are included with an RFP for the vendor to complete and submit with their proposal prior to the specified closing date and time.

May means that a certain feature, component, or action is permissible, but not required.

Must means that a certain feature, component, or action is a mandatory condition.

Party refers to either the State of Missouri or the contractor as an entity that may enter into a contract pursuant to the terms herein.

Pricing Page(s) applies to the form(s) on which the vendor must state the price(s) applicable for the equipment, supplies, and/or services required in the RFP. The pricing pages must be completed and submitted by the vendor with the proposal prior to the specified proposal closing date and time.

Proposal Closing Date and Time and similar expressions mean the exact deadline required by the RFP for the receipt of sealed proposals.

Purchase Order means the authorized document issued by the state agency to the contractor indicating descriptions, quantities, and agreed prices for products and/or services.

Reasonable, Necessary or Proper as used herein shall be interpreted solely by the State of Missouri.

Request for Proposal (RFP) means the solicitation document issued by Purchasing to potential vendors for the purchase of equipment, supplies, and/or services as described in the document. The definition includes the following sections: Introduction and Background Information; Scope of Work; Terms and Conditions (“terms and conditions” and “Terms and Conditions” are used interchangeably throughout the RFP); General Contractual Requirements; and Vendor Submission, Evaluation, and Award Information; and the RFP Vendor Response Exhibits, Attachments, and Amendments of the RFP.

RSMo (Revised Statutes of Missouri) refers to the body of laws enacted by the Legislature which govern the operations of all agencies of the State of Missouri. Chapter 34 of the statutes is the primary chapter governing the operations of Purchasing.

Shall has the same meaning as the word must.

Should means that a certain feature, component and/or action is desirable but not mandatory.

Special waste means any solid waste or combination of solid wastes that due to its quantity, concentration, physical or chemical characteristics or, biological properties, requires special handling and disposal.

State collectively referring to the state government and/or the agencies thereof.

Supplier has the same meaning as the word, vendor.

Vendor means the supplier, offeror, person, or organization that responds to an RFP by submitting a proposal with prices to provide the equipment, supplies, and/or services as required in the RFP document.

Accuracy of Background Information:

Although an attempt has been made to provide accurate and up-to-date information, the State of Missouri does not warrant or represent that the background information provided herein reflects all relationships or existing conditions related to this RFP.

****END OF INTRODUCTION AND BACKGROUND INFORMATION SECTION****

SCOPE OF WORK SECTION

General Requirements:

The contractor shall provide Pump & Treat Services of Contaminated Groundwater for the Department of Natural Resources in accordance with Attachment 1, the provisions and requirements stated herein, and to sole satisfaction of the state agency.

The contractor shall understand and agree that at the time of the submission of the proposal, the contractor shall have no other contractual obligations or have acquired any environmental liability for any contaminated soil or groundwater units at the Valley Park TCE site.

REVISED PER AMENDMENT 01

The contractor shall provide project planning, management, support, operation and maintenance for the state agency to include, at minimum, the following:

Management of contaminants;

Manage hydrogeologic challenges;

GETS design and operations;

Air stripper operation and maintenance;

Groundwater extraction system operation and maintenance;

Remote monitoring of the system;

Chemicals handling and sampling;

Data management and support; and

Coordinating with local, state, and federal agencies.

The contractor shall either provide the services directly or shall provide a person/personnel who must comply with the requirements stated herein. Therefore, references to “the contractor” throughout this document shall also be deemed to include the person/personnel provided by the contractor.

Contractor’s Obligation: Unless otherwise specified herein, the contractor shall furnish all material, labor, facilities, equipment, and supplies necessary to perform the services required herein.

This shall include all costs incurred in conducting operation and maintenance of the GETS, including, but not limited to the following:

Supplies (bag filters, chemicals and lubricants);

Subcontractors; and

System monitoring (computers, software and monitoring service).

The contractor shall pay all costs incurred in disposing of special waste, including obtaining the required permits to dispose of special waste (i.e., filter bags) generated from the operation of the GETS.

The contractor shall understand and agree that the state agency will provide the contractor with written authorization to dispose of the special waste on behalf of the state agency.

Minimum Experience Requirements:

The contractor’s service must meet or exceed the following minimum experience requirements at the time of proposal submission and for the duration of the contract.

The contractor must have a minimum of three (3) years’ experience providing each of the following:

Operation and maintenance of Groundwater Extraction and Treatment System (GETS);

Site inspection of GETS;

Preparing GETS reports;

Remote monitoring of GETS operation;

Recording changes to GETS;

Recording minor repairs to the GETS;

Performing minor repairs to the GETS;

GETS data processing;

GETS data reporting; and

Coordinating with local and emergency response teams.

Personnel Qualifications:

The contractor shall include the following team members/personnel to administer and perform the contract requirements:

Project Engineer Requirements: The contractor shall provide one (1) project engineer.

The project engineer must be a professional engineer licensed in Missouri and shall provide remote monitoring of the GETS.

The project engineer should have a minimum of three (3) years’ experience providing each of the following:

a. Preparing GETS operation and maintenance reports;

b. Contract administration;

c. Remote monitoring of GETS operation; and

d. Coordinating with local and emergency response teams and state agency project manager.

Field Engineer Requirements: The contractor shall provide one (1) field engineer.

The field engineer must be a professional engineer licensed in Missouri.

The contractor’s field engineer should have a minimum of three (3) years’ experience providing each of the following;

a. Inspection of GETS.

b. Recording changes to the GETS;

c. Recording minor repairs to the GETS; and

d. Performing minor repairs to the GETS.

Senior Scientist Requirements: The contractor shall provide one (1) senior scientist.

The senior scientist must be either a professional engineer licensed by the State of Missouri, or a professional geologist licensed by the State of Missouri.

The contractor’s Senior Scientist should have a minimum of three (3) years’ experience providing each of the following;

a. Inspection of GETS;

b. Recording minor repairs to the GETS;

c. Performing minor repairs to the GETS;

d. GETS data processing; and

e. GETS data reporting.

Junior Scientist Requirements: The contractor shall provide one (1) junior scientist.

REVISED PER AMENDMENT 01

The junior scientist must be either a professional engineer licensed by the State of Missouri, or a professional geologist licensed by the State of Missouri.

REVISED PER AMENDMENT 01

The contractor’s junior scientist should have a minimum of one (1) year experience providing each of the following;

a. Inspection of GETS;

b. Recording changes to the GETS;

c. Recording minor repairs to the GETS;

d. Performing minor repairs to the GETS;

e. GETS data processing; and

f. GETS data reporting.

The contractor shall designate a contact person who shall serve as the contractor’s contact and shall be the liaison between the contractor and the state agency. By no later than five (5) state business days after authorization by the state agency to proceed with services, the contractor shall provide the state agency with the name, address, email address, and telephone number of the contractor’s contact person. The contractor’s contact person shall (1) oversee all services being provided, (2) assume responsibility and liability for services performed per the contract, and (3) serve as the primary point of contact with the state agency.

The contractor shall understand and agree that the state agency reserves the right to request any of the contractor’s personnel assigned to provide the services be removed without just cause. The contractor shall understand and agree that the state agency will allow the contractor a reasonable time to find a replacement. The state agency shall approve all replacement personnel. The state agency reserves the right to require background checks and non-disclosure agreements (NDA) of selected contractor personnel, at the contractor’s expense.

Operation and Maintenance Requirements:

REVISED PER AMENDMENT 01

The contractor shall operate, maintain, and manage the GETS in compliance with the applicable regulations and permits, in accordance with Attachment 1, Operation and Maintenance Manual.

REVISED PER AMENDMENT 01 – DELETED LANGUAGE

The contractor shall provide a work plan within thirty (30) days of notice to proceed with services by the state agency. The work plan elements that shall be mutually agreed upon by the state agency and the contractor.

The contractor should have a Supervisory Control and Data Acquisition (SCADA) monitoring system.

The contractor shall operate the GETS on a continuous twenty-four (24) hour/seven (7) days per week basis with no more than ten (10%) percent downtime per month.

The contractor shall maintain a permanent log to record all downtime events.

The contractor shall notify the state agency by email of all downtime events within twenty-four (24) hours of the downtime event being discovered.

The contractor shall pay all cost incurred in conducting operation and maintenance of the GETS, including but not limited to the following:

Supplies (bag filters, chemicals, and lubricants)

Subcontractors; and

System monitoring (computers, software, and monitoring services)

The contractor shall pay all cost incurred in disposing of special waste, including obtaining the required permits to dispose of special waste (i.e. filter bags) generated from the operation of the GETS. The contractor shall understand and agree that the state agency will provide the contractor with written authorization to dispose of the special waste on behalf of the state agency.

System Shutdown and Restart: The contractor shall coordinate with the City of Valley Park, Missouri to perform periodic additional visits for remediation system shutdown/alarm response and flooding response, including system shutdown and restart.

The contractor shall notify the state agency by email of all flooding related shutdown and restart events.

Minor Repair: The contractor shall understand and agree that minor repairs shall be defined as repairs in which the total cost of supplies, equipment, subcontractor(s), and additional contractor hours are less than or equal to $10,000.00.

The contractor shall understand and agree that minor repairs in which the total cost is less than or equal to $1,000.00 shall be performed without prior approval of the state agency.

The contractor shall understand and agree that if the total cost for minor repairs is more than $1,000.00, the contractor shall obtain prior approval for the state agency before proceeding with repairs.

Significant Repair: The contractor shall understand and agree that significant repairs are defined as repairs in which the total cost of supplies, equipment, subcontractor(s) and additional contractor hours exceed $10,000.00.

The contractor shall understand and agree that if a significant repair is required, the contractor shall notify the state agency of the need for significant repair. The contractor shall not be held responsible for performing significant repairs.

State’s Obligations:

The state agency will designate a contract representative who shall be the liaison between the state agency and the contractor (hereinafter referred to as the Contracting Officer’s Representative (COR). The state agency will provide the contractor with the name, email address, and telephone number of the state agency’s COR.

The state agency will provide access to the GETS building to the vendor.

Reporting Requirements:

Periodic Reports: On a quarterly basis by no later than thirty (30) calendar days after the end of the reporting period, the contractor shall provide the state agency with a progress report outlining the following:

Operation & Maintenance Report: The Operational & Maintenance Report shall include Attachment 2 and a description of the following:

Operation and Maintenance of each GETS;

Repairs performed; and

Utility usage during the quarter.

As requested by the state agency, the contractor shall provide work status reports for any services not reported in the Operational and Maintenance Report.

Retention of Records and Documents: Unless specified in writing as a shorter period of time, the contractor shall preserve and make available with no limitation all books, documents, papers, and records involving transactions related to the contract for a period of ten (10) years from the date of the cancellation, expiration, or termination of the contract. Records and supporting documentation under audit or involved in litigation shall be kept for ten (10) years following the conclusion of the litigation or audit. During the contract period, access to these items shall be provided through a vehicle specified by the state agency. During the post contract period delivery and access to these items shall be at no cost to the state agency.

Electronic Funds Transfer, Invoicing, and Payment Requirements:

Electronic Funds Transfer (EFT): The State of Missouri will submit contract payments to the contractor at the remittance address listed in the contractor’s MissouriBUYS (WebProcure/Proactis) vendor registration. However, the contractor understands and agrees the state reserves the right to make contract payments to the contractor through EFT. Therefore, prior to any payments becoming due under the contract, the contractor must verify and update, if applicable, their vendor registration with their current remittance address and ACH-EFT payment information at https://MissouriBUYS.mo.gov.

Invoicing: The contractor shall submit invoices monthly. Invoices shall be due by the last day of the month following the month in which the contractor provided services under the contract. The contractor shall perform the services prior to invoicing the state agency.

The contractor shall invoice the state agency on the contractor’s original descriptive business invoice form and submit the invoice to the address on the front page of this document / the following address:

Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102

Labor: The contractor’s invoice must itemize the quantity of services performed by each labor classification and applicable firm, fixed per hour price stated on Exhibit C, Pricing Page.

Equipment/Materials/Supplies: The contractor’s invoice must itemize the equipment/materials/supplies used and number of hours, days, and/or weeks each piece of equipment/materials/supplies was used for the maintenance and minor repairs and the applicable firm, fixed unit price stated in the price list/catalog less any percentage discount stated on Exhibit C, Pricing Page.

Utilities: The contractor’s invoice must itemize the utility costs incurred at Valley Park TCE site for operating the GETS for reimbursement.

The contractor shall identify any subcontracted services utilized by the contractor for the operation and maintenance, minor repairs and project management of the GETS. The contractor shall include a copy of any invoices for subcontracted services with the contractor’s invoice.

The contractor must submit a copy of the Valley Park TCE Site Groundwater Extraction System Monitoring Logs (Attachment 2) with the contractor’s invoice.

The contractor shall use uniquely identifiable invoice numbers to distinguish an invoice from a previously submitted invoice and shall include on the invoice the remittance address listed in the contractor’s MissouriBUYS (WebProcure/Proactis) vendor registration.

Each contractor invoice must be on the contractor’s original descriptive business invoice form and must contain a unique invoice number and the remittance address included in the contractor’s MissouriBUYS (WebProcure/Proactis) vendor registration. The invoice number will be listed on the state’s EFT addendum record to enable the contractor to properly apply state payments to invoices. The contractor must comply with all other invoicing requirements stated in the RFP.

The statewide financial management system has been designed to capture certain receipt and payment information. For each purchase order received, an invoice must be submitted that references the purchase order number and should be itemized in accordance with items listed on the purchase order. Failure to comply with this requirement may delay processing of invoices for payment.

The contractor shall not invoice federal or state taxes unless otherwise required under law or regulation.

Payment:

Payments are due upon receipt of a valid invoice, payable in thirty (30) calendar days. All invoices for equipment, supplies, and/or services purchased by the State of Missouri shall be subject to late payment charges as provided in section 34.055, RSMo.

The State of Missouri does not pay state or federal taxes unless otherwise required under law or regulation.

The State of Missouri assumes no obligation for equipment, supplies, and/or services shipped or provided in excess of the quantity ordered. Any unauthorized quantity is subject to the state's rejection and shall be returned at the contractor's expense.

The contractor may obtain detailed information for payments issued for the past 24 months from the State of Missouri’s central accounting system (SAM II) on the Vendor Services Portal at https://www.vendorservices.mo.gov/vendorservices/Portal/Default.aspx.

Inspection and Acceptance Specifications: For purposes of acceptance, no equipment, supplies, and/or services received by the state pursuant to a contract shall be deemed accepted until the state has had reasonable opportunity to inspect said equipment, supplies, and/or services.

All equipment, supplies, and/or services which do not comply with the specifications and/or requirements or which are otherwise unacceptable or defective may be rejected by the state. In addition, all equipment, supplies, and/or services which are discovered to be defective or which do not conform to any warranty of the contractor upon inspection (or at any later time if the defects contained were not reasonably ascertainable upon the initial inspection) may be rejected.

The State of Missouri reserves the right to return any such rejected shipment at the contractor's expense for full credit or replacement and to specify a reasonable date by which replacements must be received.

The State of Missouri's right to reject any unacceptable equipment, supplies, and/or services shall not exclude any other legal, equitable or contractual remedies the state may have.

If the state agency denies a request by the contractor for payment, the state agency will provide the contractor with written notice of the reason(s) for denial.

If the contractor is overpaid by the state agency the contractor, upon notification by the state agency, shall provide the state agency (1) with a check payable as instructed by the state agency or (2) deduct the overpayment from the invoice(s) as requested by the state agency.

Other than the payments specified in the contract, no other payments shall be made to the contractor.

****END OF SCOPE OF WORK SECTION****

TERMS AND CONDITIONS SECTION

Applicable Laws and Regulations:

The contract shall be construed according to the laws of the State of Missouri. The contractor and the State of Missouri must follow all applicable federal, state, and local laws and regulations that apply to the performance of the contract. To the extent that a provision of the contract is contrary to the Constitution or laws of the State of Missouri or of the United States, the provisions shall be void and unenforceable. However, the balance of the contract shall remain in force between the parties unless terminated by consent of both the contractor and Purchasing.

Non-Discrimination and Affirmative Action:

The contractor must comply with applicable federal and state laws and regulations addressing discrimination in employment.

Americans with Disabilities Act:

In connection with the furnishing of equipment, supplies, and/or services under the contract, the contractor and all subcontractors shall comply with all applicable requirements and provisions of the Americans with Disabilities Act (ADA), ADA is 42 U.S.C. section 1201, et seq.0

Anti-Discrimination Against Israel Act Contractor Requirements:

If the contractor meets the definition of a company as defined in section 34.600, RSMo, and has ten or more employees, the contractor shall not engage in a boycott of goods or services from the State of Israel; from companies doing business in or with Israel or authorized by, licensed by, or organized under the laws of the State of Israel; or from persons or entities doing business in the State of Israel as defined in section 34.600, RSMo.

If during the life of the contract, the contractor’s business status changes according to section 34.600, RSMo, then the contractor shall comply with, complete, and submit to the Division of Purchasing an updated Exhibit L, Anti-Discrimination Against Israel Act Certification.

Authorized Personnel/E-Verify:

For work performed under the contract, the contractor shall only employ personnel authorized to work in the United States in accordance with applicable federal and state laws, including section 285.530, RSMo and Executive Order 07-13. If the contractor employs personnel not authorized to work in the United States, the state shall have the right to cancel the contract immediately without penalty or recourse, and to pursue any other remedies permitted by the contract or by applicable state or federal law.

Prior to the performance of any services, a contractor meeting the definition of a business entity in section 285.525, RSMo, shall maintain enrollment and participation in the E-Verify Federal work authorization program with respect to the employees hired after enrollment in the program for work in connection with the contracted services included herein. If the contractor’s business status changes during the life of the contract to become a business entity as defined in section 285.525, RSMo, pertaining to section 285.530, RSMo, then the contractor shall enroll and participate in the E-Verify program.

The contractor shall only be required to provide the affidavits required in section 285.530.2, RSMo, to the state on an annual basis. https://purch.oa.mo.gov/vendor-information/affidavit-work-authorization-annual-renewal

The contractor shall ensure that its subcontractors comply with section 285.530, RSMo.

Business Registration:

The contractor must meet the requirements for conducting business in the State of Missouri, prior to performance of services under the contract, and for the duration of the contract. The contractor must be registered and maintain good standing with the Secretary of State of the State of Missouri and other regulatory agencies, as may be required by law or regulations. Such business requirements for formation and operation include, but are not limited to, those in Chapters 347-359, RSMo.

Data Breach:

If a data breach impacting the State of Missouri’s data requires the state to comply with section 407.1500, RSMo, the contractor shall assist the state by providing to the state any requested information held by the contractor concerning the breach and the state’s data stored in the software and services being provided as a result of the contract.

Elected or Appointed Officials and Employees:

Elected or appointed officials or employees of the State of Missouri or any political subdivision thereof, serving in an executive or administrative capacity, must comply with sections 105.452 and 105.454, RSMo, regarding conflict of interest.

Indemnification:

Unless expressly provided by Missouri law to the contrary, pursuant to the Constitution of the State of Missouri, Article III, section 39, subsections 2 and 5, the state shall not indemnify, hold harmless, or agree in advance to defend, any person or entity.

Legal Proceedings:

For any legal action or other proceedings, per section 27.050 and section 27.060, RSMo, the Missouri Attorney General is given the authority to represent the State of Missouri’s interests. The venue for any legal proceeding relating to or arising out of the RFP or resulting contract shall be in circuit court for Cole County, Missouri or the United States District Court for the Western District of Missouri, Central Division.

The contractor and the state agree that if a dispute concerning the contract arises that the parties shall make an attempt to resolve the dispute through informal methods before initiating litigation.

The State of Missouri does not agree to any arbitration. The State of Missouri does not voluntarily agree to the payment of attorneys’ fees. The state may, but is not required to, mediate any dispute arising under the contract, and any vendor provisions requiring mediation or dispute resolution processes shall not be binding upon the state.

Negotiations:

The State of Missouri does not negotiate contracts after award. Any competitive negotiation, if conducted by the state, must have occurred prior to contract award in accordance with Chapter 34, RSMo, 1 CSR 40-1.050 and as stated in this RFP.

Invoicing and Payment:

Invoicing and payments must follow section 33.120, section 34.055, and section 8.960, RSMo. All payments shall be made in arrears, unless the requirements of 1 CSR 10-3.010 allow for advance payment of goods or services.

Non-Appropriation of Funds:

The contractor understands and agrees that funds required to fund the contract must be appropriated by the General Assembly of the State of Missouri for each fiscal year included within the contract period. The contract shall not be binding upon the state for any period in which funds have not been appropriated, have been withheld, or have been restricted, and the state shall not be liable for any costs associated with termination caused by lack of appropriations or authority to spend. This includes, but is not limited to, the provisions of the Mo. Const. Article IV, sections 23, 27, 28 and in sections 33.030 and 33.065, RSMo and 1 CSR 10-3.010 (1)(B).

To the extent that federal funding is used for the contract, the contract shall not be binding upon the state for any period in which such funding is reduced, terminated, withheld, restricted, or is frozen or paused.

Work Outside the United States:

Unless work outside the United States is prohibited by the RFP, any work performed outside of the United States for the contract must comply with Executive Order 04-09.

Open Records:

Pursuant to section 610.021, RSMo, the contract and related documents are available for public review. Pursuant to section 610.021, RSMo, proposals and related documents shall not be available for public review until after a contract is executed or all proposals are rejected.

Protests:

Any proposal award protest must be received within ten (10) state business days after the date of award in accordance with the requirements of 1 CSR 40-1.050.

Record Access:

The contractor shall grant the State Auditor access to records/items as stated in section 29.235, RSMo.

State Preferences:

If the contractor’s awarded proposal included state preferences, the contractor must comply with the rules applicable to those preferences including:

Section 34.070 and section 34.073 RSMo for Missouri business preferences;

Section 34.074 RSMo and 1 CSR 40-1.050 for Service Disabled Veteran Enterprises; and

Section 34.165 RSMo and 1 CSR 40-1.050 for Organizations for the Blind/Sheltered Workshops.

Taxes:

The contractor must timely file and pay all Missouri sales, withholding, corporate and any other required Missouri tax returns and taxes, including interest and additions to tax. No contract shall be awarded to a vendor that does not meet the conditions of section 34.040.7, RSMo.

*****END OF TERMS AND CONDITIONS SECTION*****

GENERAL Contractual REQUIREMENTS SECTION

Contract Definition:

A binding contract shall consist of the following documents:

The most current version of the RFP (including all Exhibits and Attachments included in the RFP) as amended by: RFP amendment(s) issued prior to bid closing, Best and Final Offer (BAFO) requests, and contract amendment(s);

The most current version of the contractor’s proposal, including the contractor’s BAFO responses, state-requested clarification responses, and contract amendment responses; and

The Division of Purchasing’s acceptance of the proposal by “notice of award”.

The contract expresses the complete agreement of the parties and performance shall be governed solely by the specifications and requirements contained therein.

The vendor’s response, whether responding to a mandatory requirement or a desired attribute, will be binding upon the contractor in the event the vendor’s response is accepted by the state and a contract is awarded.

The contractor further agrees that the language of the RFP shall govern in the event of a conflict with the contractor’s proposal.

The contractor shall agree to furnish all awarded services specified in the contract, at the prices quoted therein.

A notice of award issued by the State of Missouri does not constitute an authorization for shipment of equipment or supplies or a directive to proceed with services. Before providing services for the State of Missouri, the contractor must receive a properly authorized purchase order or other form of written authorization to proceed from the state, such as an order form, (in addition to the Division of Purchasing’s “notice of award”).

The state agency may sign or “click-through” and accept agreements if required by the contractor in order to receive services; however, all provisions of such agreements that conflict with the contract shall have no force or effect.

Contract Amendment:

All changes to the contract must be accomplished by a formal contract amendment executed by both the contractor and the Division of Purchasing prior to the effective date of such change. No other means shall be used or construed as an amendment or modification to the contract.

Contract Period:

The original contract period shall be as specified on the cover page and the subsequent Notice of Award of the RFP.

Renewal Options: The Division of Purchasing shall have the right, at its sole option, to renew the contract for three (3) additional one-year period(s), or any portion thereof. In the event the Division of Purchasing exercises such right, all terms and conditions, requirements and specifications of the contract shall remain the same and apply during the renewal period, pursuant to applicable option clauses of this document.

Contract Pricing:

All prices shall be firm, fixed, and as indicated in Exhibit C, Pricing Pages. The state shall not pay nor be liable for any other additional costs, including but not limited to taxes, shipping charges, insurance, interest, penalties, termination payments, liquidated damages, attorney fees, etc.

Renewal Pricing: If the option for renewal is exercised by the Division of Purchasing, the contractor shall agree that the prices for the renewal period shall not exceed the prices for the applicable renewal period stated on Exhibit C, Pricing Pages.

If renewal prices are not provided with the accepted proposal, then prices during the renewal period shall be the same as the original contract period pricing.

In addition, the contractor shall understand and agree that any renewal period increases specified in the contract are not automatic. At the time of contract renewal, if the state determines funding does not permit the specified renewal pricing increase or even a portion thereof, the renewal pricing shall remain the same as during the previous contract period.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .