About this file

This is a system monitoring and inspection form for the Valley Park TCE Site Groundwater Extraction System, a remediation facility addressing trichloroethene (TCE) contamination. The form documents operational status, physical component readings, and maintenance activities required at regular intervals. The monitoring checklist captures data on extraction well performance, antiscalant metering systems, sediment bag filters, air stripper equipment, and variable frequency drive (VFD) settings. Inspectors record system status upon arrival and departure, measure flow rates (target range 178-182 gpm), water levels, pressure readings across multiple components, and antiscalant inventory. Monthly maintenance tasks include checking antiscalant levels, inspecting outfall conditions, maintaining air stripper trays, and gauging monitoring wells MW-55 and MW-56. The form also requires verification of control panel indicator lights and switch positions to ensure proper operational configuration.

The document includes specific operating ranges and setpoints for all monitored components, including extraction well pressure (8-15 psi), air stripper pressure (35-42 in H2O), and water level thresholds (50-58 feet below top of casing). Personnel conducting inspections must document readings through the SiteLink Controls online platform and verify that automated systems are functioning correctly. This monitoring form, last revised March 13, 2020, serves as the primary documentation tool for ongoing operational oversight and regulatory compliance at this groundwater remediation site, ensuring consistent performance of extraction, treatment, and air stripping systems.

View the file

Other files

File Type Posted
REVISED Attachment 1.pdf PDF
Attachment 1.pdf PDF
STATE 0000000524SL-01.docx DOCX document
STATE 0000000524SL.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Inspected: ___________________ System Status At Arrival: [ ] running [ ] stopped [ ] alarmed

Time Inspected: ___________________ [ ] running [ ] stopped [ ] alarmed

Inspected By: ______________________

Check Physical Components

Component Reading Units (typical operating range)

Extraction Well and Flow Meter

E+H Flow Meter gpm (178 to 182 gpm)

E+H Flow Meter Kgl

E+H Flow Meter gal (use the plus sign only)

Extraction Well Water Level ft below TOC (35 to 50 ft.)

Extraction Well Pressure Gauge psi (8 to 15 psi)

Antiscalant and Metering Pump

Metering Rate gal/day (~0.03 gal/day)

Pump Pressure bar (~3.5 bar)

50:50 Antiscalant Volume gal

Undiluted Antiscalant Onhand drums

Sediment Bag Filters

Pre Bag Filter Pressure psi (5 to 9 psi)

6591A-pre psi (3 to 9 psi)

6591A-post psi (2.5 to 7 psi)

6591A-pre psi (3 to 9 psi)

6591B-post psi (2.5 to 7 psi)

Post Bag Filter Pressure psi (5 to 7 psi)

Capsu-Photohelic Reading (black) (DP-10) in H2O

Capsu-Photohelic Gauge Setpoint (red) (DP-10) ~ 300 in H2O Note: 300 in H2O = 11 psi

Air Stripper Blower

Air Stripper Pressure in H2O (35 to 42 in H2O)

Air Stripper Input Flow cfm x 10 (350 - 450 cfm x10)

TECO-Westinghouse Variable Frequency Drive (VFD)

VFD Freq. Cmd Hz (37 to 42)

VALLEY PARK TCE SITE

GROUNDWATER EXTRACTION SYSTEM MONITORING

System Status When Leaving:

Form Revised 3/13/2020

Control Panel and PLC

Site Walk-Around, Well Gauging, and Other Items

Check Each Visit Check Monthly (first week of month)

[ ] Site walk-around [ ] Check antiscalant level

[ ] Check outfall in storm grate [ ] Check air stripper trays

[ ] Drain air stripper stack [ ] Tighten Fernco fittings on air stripper trays

[ ] Gauge monitoring wells

MW-55

MW-56

SiteLink Controls (https://sitelink.newterra.com/)

Flow Meter Readings

FM-10 Flowrate gpm (178 to 182 gpm)

FM-10 Total Volume gal.

Water Level (LC-10) Control

Water over LC-10 ft.

Water Level ft. below TOC

LC-10 Position ft. below TOC (58 ft)

Low Water Well (Low SP) ft. below TOC (56 ft)

Pump On Level (ON SP) ft. below TOC (50 ft)

Dosing Pump (DP-CH) Setpoints

Manual SP % (50 %)

Automatic SP gpm (200 gpm)

Runtimes

VB-SVE & FAN HRS 0 hrs

ASP-10 Blower HRS hrs

P-10 WELL HRS hrs

DP-VLS PUMP HRS 0 hrs

Notes

Depth to Water

(ft btoc)

Total Depth

(ft btoc)

Verify: Are ASP-10 BLOWER-ON and VFD P-10 ON lights illuminated red and all others are off?

[ ] yes [ ] no, explain:

Verify: Are switch positions: AUTO, OFF, OFF, OFF, AUTO [ ] yes [ ] no, explain: