StandardSpecList.pdf
PDF 113 KB Posted
- Solicitation number
- 1240LT24R0023
About this file
This document is the Standard Specification List FP-14 for the Dolores Cattleguard Replacement project. It provides the general requirements, project requirements, earthwork, aggregate and base courses, incidental construction, and materials specifications for this contract opportunity.
The related federal contract opportunity is for the Cattle Guard Replacement on the Dolores and Columbine Ranger Districts of the San Juan National Forest. The contractor will be responsible for purchasing and installing new cattle guard bases, running surfaces, and wings, as well as disposing of the removed material. Bedding material, approach aggregate, and minor fence work may also be required. Traffic control is the contractor's responsibility, with delays not to exceed 30 minutes. The work will occur on gravel surfaced Level 3 and 4 roads, and the typical operating season is May 1 - November 30. Operations must avoid freeze-thaw conditions, and the contracting officer must approve the timing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ColumbineCattleGuard_AS_signed Maps.pdf | ||
| DescriptionOfWork.pdf | ||
| Wage Determination.pdf | ||
| FSSS.pdf | ||
| Schedule of Items Columbine.xlsx | XLSX spreadsheet | |
| DoloresCattleGuard_AS_signed Maps.pdf | ||
| 1240LT24R0023.pdf | ||
| Schedule of Items Dolores.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD SPECIFICATION LIST FP-14 FOR DOLORES CATTLEGUARD REPLACEMENT
TABLE OF CONTENTS
DIVISION 100 GENERAL REQUIREMENTS
Section 101. — TERMS, FORMAT, AND DEFINITIONS Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT Section 103. — SCOPE OF WORK Section 104. — CONTROL OF WORK Section 105. — CONTROL OF MATERIAL Section 106. — ACCEPTANCE OF WORK Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Section 108. — PROSECUTION AND PROGRESS Section 109. — MEASUREMENT AND PAYMENT
DIVISION 150 PROJECT REQUIREMENTS
Section 151. — MOBILIZATION Section 153. — CONTRACTOR QUALITY CONTROL Section 154. — CONTRACTOR SAMPLING AND TESTING Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS Section 156. — PUBLIC TRAFFIC
DIVISION 200 EARTHWORK
Section 203.- REMOVAL OF STRUCTURES AND OBSTRUCTIONS Section 204. — EXCAVATION AND EMBANKMENT
DIVISION 300 AGGREGATE AND BASE COURSES
Section 301. — UNTREATED AGGREGATE COURSES Section 303. – ROAD RECONDITIONING
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 619. - FENCES, GATES, CATTLE GUARDS AND BOLLARD POSTS Section 635. – TEMPORARY TRAFFIC CONTROL
DIVISION 700 MATERIAL
Section 703. — AGGREGATE
703.05 Subbase, Base, and Surface Course Aggregate
File details come from the government source that posted it. Updated .