Stairwell picturespdf.pdf
PDF 48 MB Posted
- Solicitation number
- S-29100-00010989
- Issued by
- Union County, Oregon
About this file
This document appears to be related to a state and local contract opportunity from the State of Oregon. The contract is for the Eastern Oregon Correctional Institution (EOCI) and requires the contractor to furnish all materials, tools, equipment, transportation, labor, and supervision to successfully install and dismantle scaffolding and outer containment material per the manufacturer's specifications and all regulations. This includes the setup of scaffolding and the exterior wrapping with a material to contain paint overspray in 13 stairwell locations at EOCI.
The contract requires the successful contractor to have the necessary expertise and capabilities to complete the scaffolding setup and takedown work. The contract does not provide any specific pricing terms, set-asides, information about incumbents, funding requirements, or other salient financial details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFPAttG Responsibility Inquiry.doc | DOC document | |
| Exhibit 2 C, D2, D3 Stairs.pdf | ||
| Exhibit 1 G Stairs.pdf | ||
| 10989 ITB EOCI Scaffolding.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .