Exhibit 1 G Stairs.pdf
PDF 2 MB Posted
- Solicitation number
- S-29100-00010989
- Issued by
- Union County, Oregon
About this file
This document is Exhibit 1 G Stairs.pdf, which is related to the Eastern Oregon Correctional Institution Scaffolding Setup/Takedown contract opportunity. The contractor shall furnish all materials, tools, equipment, transportation, labor, and supervision required to successfully install and dismantle scaffolding and outer containment material per Manufacturer's Specifications and all regulations at 13 stairwell locations at the Eastern Oregon Correctional Institution (EOCI). This includes the setup of scaffolding and the exterior wrapping with a material to contain paint overspray.
The contract does not provide any information on pricing terms, set asides, incumbents, funding requirements and sources, or other salient details. The document only outlines the scope of work for the scaffolding setup and takedown services required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFPAttG Responsibility Inquiry.doc | DOC document | |
| Exhibit 2 C, D2, D3 Stairs.pdf | ||
| 10989 ITB EOCI Scaffolding.pdf | ||
| Stairwell picturespdf.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .