Stack_Testing_Tech_Description.docx
DOCX document 87 KB Posted
- Solicitation number
- 25-P-00182
- Issued by
- Hillsborough County, Florida
About this file
This document is a Technical Specification for Annual Stack Testing for the McKay Bay Waste to Energy (WTE) Facility in Tampa, Florida, issued by the City of Tampa's Purchasing Department. The project involves comprehensive environmental testing across four facility units, including measurements for hydrogen chloride, mercury, particulate matter, metals, dioxins/furans, opacity, oxygen, carbon dioxide, sulfur dioxide, nitrogen oxides, and carbon monoxide using various EPA testing methods. The testing will be conducted over four days, with detailed testing schedules specifying exact parameters, test methods, number of tests, and test durations for each unit and emission point.
The bid response requires a comprehensive pricing structure including annual compliance testing, mobilization, sample analysis, and additional work. Bidders must have five years of experience in complex multi-method stack testing at Waste to Energy Facilities and provide an onsite representative to manage testing communications and safety. The total bid must include all labor, materials, mobilization, hotel/per diem costs, testing, equipment rentals, office trailers, shipping, reports, and lab analyses. Pricing components include a base annual testing lot price, hourly standby/overtime rates, hotel/per diem daily rates, and a markup percentage for other expenses not to exceed 10%. The contract emphasizes strict quality assurance, safety protocols, and precise reporting requirements within specific timeframes.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Department Gregory K. Spearman, CPPO, NIGP-CPP, Director 306 E. Jackson Street, 2E Tampa, Florida 33602
Office (813) 274-8351 Fax: (813) 274-8355
(DATE)
TECHNICAL SPECIFICATIONS FOR
MCKAY BAY WASTE TO ENERGY (WTE) FACILITY ANNUAL STACK TESTING (RE-BID)
8. SCOPE OF WORK
The work included in these specifications shall consist of furnishing all labor, equipment, and technical capability to perform the testing programs outlined in the table below.
9. BIDDER SUBMITTAL AND QUALIFICATIONS
9.1 Minimum Qualifications: The Awardee must have five (5) years’ experience in complex multi-method stack testing and must have experience in testing Waste to Energy Facilities and provide proof of such experience.
9.2 Technical Points:
The Awardee must provide an onsite Representative as an integral part of the test crew. The onsite Representative serves as the prime contact between the WTE Facility test coordinator and the Awardee test crew and ensures that a clear line of communication between the WTE Facility and the Awardee crew is maintained throughout the test program. The onsite Representative will be available to participate in on-site meetings prior to and during the test program. This onsite Representative must also be available to resolve any regulatory questions that may present themselves during the test. Additionally, the onsite Representative serves as a safety lookout for the test crew and provides additional support needed by the crew during the testing.
Awardee’s equipment must be calibrated properly for accuracy, glassware must be cleaned effectively to avoid contamination, backup equipment must be available to avoid malfunction related delays onsite, sample custody must be maintained to ensure integrity, analytical accuracy must be achieved, results must be calculated without errors, and the report must be organized efficiently.
The Awardee must utilize chain-of-custody forms that provide a tracking mechanism for samples, from sample train staging to analysis, because proof of sample custody is critical to the success of this project. The form is started onsite, completed upon sample labeling review following sample recovery, and is shipped with the samples to the analytical laboratory. The form requires signatures from the sample custodian, a reviewer, and the recipient at the analytical laboratory. An area is also provided for the analytical laboratory to note the sample condition upon receipt.
The Awardee must use laptop computers to calculate air flow results and isokinetics during the testing program. This approach allows the onsite results to be validated during and at the end of each test run instead of weeks later. If a question exists concerning any sampling data, the tests can be repeated immediately without jeopardizing the WTE Facility’s test results.
The Awardee will provide preliminary on-site results for particulate and hydrogen chloride. This approach provides preliminary indications of testing results on-site which enables the client to make timely modifications to the process if deemed necessary.
Awardee will wear appropriate personnel protective equipment (PPE) including safety boots, appropriate hand protection, hard hats, safety glasses with permanent side shields, goggles, ear protection, and half-face respirators.
9.3 Analytical Laboratories: The Awardee will provide a list of analytical labs that will be utilized for the hydrogen chloride analysis, the particulate/metals analysis, and the dioxins/furans analysis.
9.4 QA/QC Objectives: The Awardee will collect one field blank for each of EPA Method 23 and EPA Method 29. Additionally, Awardee will analyze one metals sample in duplicate, and will quantify the matrix spike recovery for one metal sample. All mercury analysis will be performed in duplicate. In addition, the Awardee will collect and analyze reagent blanks for metals and hydrogen chloride and laboratory blanks will be analyzed for dioxins/furans and metals.
9.5 Logistical Requirements: The Awardee will provide a Mobile trailer to provide a controlled environment for sample train staging and sample recovery. This will effectively serve as a draft-free and contamination controlled laboratory where sample recovery and analytical procedures can be performed. The WTE Facility will provide the electrical needs for power for the Awardee’s trailers.
9.6 Test Reports: The Awardee will submit the draft report for RATA programs within twenty-eight calendar days of test completion and four copies of the final report within thirty-five calendar days or seven days following client’s comments. The RATA results will be given to the site contact while onsite. The Awardee will submit a draft report for the compliance programs within twenty-eight calendar days of test completion and four copies of the final report within thirty-five calendar days or seven days following client’s comments. Preliminary results will be submitted by email by the Awardee as soon as they become available for all programs. The reports will be in a format suitable for submission to the agency.
9.7 Testing: Dioxins/furans testing will be conducted on one/different Unit each year.
9.8 Bid Response: Total cost must include all labor, materials, mobilization, hotel/per diem costs, all testing, equipment, rentals, office trailers, shipping, reports, lab analyses and any other costs required to perform the testing.
9.9 Protocol: The Awardee will provide an Annual Air Emissions Testing and RATA Protocol prior to the annual scheduled testing so it can be submitted to the EPC. See attached sample 2021 Protocol.
10. SAFETY AND PROTECTION OF PROPERTY
Awardee shall at all times:
| 10.1. | Initiate, maintain, and supervise all safety precautions, and programs in connection with its services, or performance of its operations under this award. |
| 10.2. | Take all reasonable precautions to prevent injury to employees, including City employees, and all other persons affected by its operations. |
| 10.3. | Take all reasonable precautions to prevent damage, or loss to property of the City of Tampa, or of other Contractors, consultants, or agencies, and shall be held responsible for replacing, or repairing any such loss or damage. |
| 10.4. | Comply with all ordinances, rules, and regulation standards that bear on the safety of persons, or property, or their protection from damage, injury, or loss. This includes but is not limited to: |
· Occupational Safety and Health Act, (OSHA).
· National Institute for Occupational Safety & Health, (NIOSH).
· National Fire Protection Association, (NFPA).
10.5 Awardee shall at his/her own expense immediately correct, repair, restore any defective work or damages to any part of the buildings, their contents, or their appurtenances, caused by or which are the result of the activities of the Awardee. In case of failure on the part of the Awardee to restore or to make good such defective work or damages, such property as may be deemed necessary; and the cost thereof shall be deducted from any moneys due or which may become due the Awardee under this award.
11. PARKING
City of Tampa shall not be responsible for any damage to the vehicles while parked on City property. Vehicles towed from City property shall be at the expense of the Awardee. The Awardee’s vehicles shall be properly identified.
12. NON-PERFORMANCE
Pattern of failure to provide the services herein, as specified may result in Awardee being found in default. More than three reported incidents within a treatment cycle shall be considered a pattern of non-performance. Payment shall be withheld until corrective action is taken on the part of the Awardee and/or the City Representative shall also have the right to find the Awardee in default and terminate the award.
13. EMPLOYEES
13.1. Awardee shall employ only qualified people who are skilled in performing stack testing services. Awardee shall require that all employees be neatly attired at all times in company uniform.
13.2. Awardee shall employ upon all parts of the work herein only competent, skillful, and trustworthy persons. Should the City Representative at any time give notice in writing to the Awardee or his duly authorized representative that any employee seems incompetent, unfaithful, to the satisfactory progress of the work, such employee shall immediately be dismissed and not allowed again upon the work.
13.3. Awardee shall furnish and require each employee at the work site to wear a name tag identification that displays the name of the employee and the company. No one will be permitted to work without a displayed nametag.
13.4. No non-employee family members (adult or child) or friends shall be permitted on the premises during the performance of the services required of the award
14. Contractor Safety Requirements: See Attachment D -- “City of Tampa McKay Bay Waste-To-Energy Facility Contractor Environmental, Health, and Safety Requirements”
15. Contractor Notice: See Attachment E – “City of Tampa McKay Bay Waste-To-Energy Facility Contractor Arsenic, Lead, Cadmium, and Hexavalent Chromium Notice”
McKay Bay Annual Compliance/RATA Testing Tentative Test Schedule
Four mercury test runs on each outlet
| TEST DAY |
| PARAMETER |
| TEST |
METHOD
NUMBER OF
TESTS
TEST
DURATION
TIME
ON SITE
| Sunday |
| Travel to site and set up equipment |
Monday
| Unit 4 SDA Inlet |
| Hydrogen Chloride |
| EPA Mod. M26A |
| 3 |
| 60 min. |
| 10 hours |
| Mercury |
| EPA Method 29 |
| 3 |
| 120 min. |
| 9 men |
| Unit 4 FF Outlet |
| Hydrogen Chloride |
| EPA Mod. M26A |
| 3 |
| 60 min. |
| Particulate 1, Cd, Pb, & Hg |
| EPA Method 29 |
| 3 |
| 120 min. |
| Opacity 2 |
| Facility COMS |
| 3 |
| 60 min. |
| Unit 3 FF Outlet |
| 4-8 PCDD/PCDF |
| EPA Method 23 |
| 1 (am) |
| 240 min. |
| Unit 3 FF Outlet |
| Mercury |
| EPA Method 29 |
| 1 (pm) |
| 120 min. |
| Unit 1 SDA Inlet |
| Oxygen/Carbon Dioxide |
| EPA Method 3A |
| 9-12 |
| 25 min. |
| Sulfur Dioxide |
| EPA Method 6C |
| 9-12 |
| 25 min. |
| Unit 2 FF Outlet |
| Oxygen/Carbon Dioxide |
| EPA Method 3A |
| 9-12 |
| 25 min. |
| Sulfur Dioxide |
| EPA Method 6C |
| 9-12 |
| 25 min. |
| Nitrogen Oxides |
| EPA Method 7E |
| 9-12 |
| 25 min. |
| Carbon Monoxide |
| EPA Method 10 |
| 9-12 |
| 25 min. |
| Ash System |
| Fugitive Emissions 3 |
| EPA Method 22 |
| 3 |
| 60 min. |
| Carbon Silo 1 |
| Opacity 3 |
| EPA Method 9 |
| 1 2 |
| ~ 30 min. |
| Carbon Silo 2 |
| Opacity 3 |
| EPA Method 9 |
| 1 2 |
| ~ 30 min. |
| Lime Silo |
| Opacity 3 |
| EPA Method 9 |
| 1 2 |
| ~ 60 min. |
Tuesday
| Unit 3 FF Outlet |
| 4-8 PCDD/PCDF |
| EPA Method 23 |
| 2 |
| 240 min. |
| 10 hours |
| Unit 3 SDA Inlet |
| Hydrogen Chloride |
| EPA Mod. M26A |
| 3 |
| 60 min. |
| 9 men |
| Mercury |
| EPA Method 29 |
| 3 |
| 120 min. |
| Unit 3 FF Outlet |
| Hydrogen Chloride |
| EPA Mod. M26A |
| 3 |
| 60 min. |
| Particulate 1, Cd, Pb, & Hg |
| EPA Method 29 |
| 3 |
| 120 min. |
| Opacity 2 |
| Facility COMS |
| 3 |
| 60 min. |
| Unit 4 FF Outlet |
| Mercury |
| EPA Method 29 |
| 1 (pm) |
| 120 min. |
| Unit 2 SDA Inlet |
| Oxygen/Carbon Dioxide |
| EPA Method 3A |
| 9-12 |
| 25 min. |
| Sulfur Dioxide |
| EPA Method 6C |
| 9-12 |
| 25 min. |
| Unit 2 FF Outlet |
| Oxygen/Carbon Dioxide |
| EPA Method 3A |
| 9-12 |
| 25 min. |
| Sulfur Dioxide |
| EPA Method 6C |
| 9-12 |
| 25 min. |
| Nitrogen Oxides |
| EPA Method 7E |
| 9-12 |
| 25 min. |
| Carbon Monoxide |
| EPA Method 10 |
| 9-12 |
| 25 min. |
Wednesday
| Unit 3 SDA Inlet |
| Oxygen/Carbon Dioxide |
| EPA Method 3A |
| 9-12 |
| 25 min. |
| 10 hours |
| Sulfur Dioxide |
| EPA Method 6C |
| 9-12 |
| 25 min. |
| 9 men |
| Unit 3 FF Outlet |
| Oxygen/Carbon Dioxide |
| EPA Method 3A |
| 9-12 |
| 25 min. |
| Sulfur Dioxide |
| EPA Method 6C |
| 9-12 |
| 25 min. |
| Nitrogen Oxides |
| EPA Method 7E |
| 9-12 |
| 25 min. |
| Carbon Monoxide |
| EPA Method 10 |
| 9-12 |
| 25 min. |
| Unit 2 SDA Inlet |
| Hydrogen Chloride |
| EPA Mod. M26A |
| 3 |
| 60 min. |
| Mercury |
| EPA Method 29 |
| 3 |
| 120 min. |
| Unit 2 FF Outlet |
| Hydrogen Chloride |
| EPA Mod. M26A |
| 3 |
| 60 min. |
| Particulate 1, Cd, Pb, & Hg |
| EPA Method 29 |
| 3 |
| 120 min. |
| Opacity 2 |
| Facility COMS |
| 3 |
| 60 min. |
| Unit 1 FF Outlet |
| Mercury |
| EPA Method 29 |
| 1 (pm) |
| 120 min. |
McKay Bay Annual Compliance/RATA Testing Tentative Test Schedule -- continued --
| TEST DAY |
| PARAMETER |
| TEST |
METHOD
NUMBER OF
TESTS
TEST
DURATION
TIME
ON SITE
Thursday
| Unit 4 SDA Inlet |
| Oxygen/Carbon Dioxide |
| EPA Method 3A |
| 9-12 |
| 25 min. |
| 10 hours |
| Sulfur Dioxide |
| EPA Method 6C |
| 9-12 |
| 25 min. |
| 9 men |
| Unit 4 FF Outlet |
| Oxygen/Carbon Dioxide |
| EPA Method 3A |
| 9-12 |
| 25 min. |
| Sulfur Dioxide |
| EPA Method 6C |
| 9-12 |
| 25 min. |
| Nitrogen Oxides |
| EPA Method 7E |
| 9-12 |
| 25 min. |
| Carbon Monoxide |
| EPA Method 10 |
| 9-12 |
| 25 min. |
| Unit 2 FF Outlet |
| Mercury |
| EPA Method 29 |
| 1 (pm) |
| 120 min. |
| Unit 1 SDA Inlet |
| Hydrogen Chloride |
| EPA Mod. M26A |
| 3 |
| 60 min. |
| Mercury |
| EPA Method 29 |
| 3 |
| 120 min. |
| Unit 1 FF Outlet |
| Hydrogen Chloride |
| EPA Mod. M26A |
| 3 |
| 60 min. |
| Particulate 1, Cd, Pb, & Hg |
| EPA Method 29 |
| 3 |
| 120 min. |
| Opacity 2 |
| Facility COMS |
| 3 |
| 60 min. |
Demobilize from site
Test Schedule Notes:
1 A soot-blow cycle will be conducted during one EPA Method 5 test run on each unit.
2 Opacity measurements will be taken from the facility’s COMS during each particulate test run in accordance with 40CFR60.11(e)(5).
3 EPA Method 22 fugitive emissions observations on the Ash Handling/Conveying System and EPA Method 9 opacity observations on the Carbon and Lime Silo Bin Vent Filters will be conducted at various times during the test week as necessary, not specifically on Monday as noted. Carbon and Lime Silo Bin Vent Filters opacity observations shall be completed during one truck’s unloading operation.
4 One biogenic carbon sample will be composited from 8 hours of ORSAT samples.
BID RESPONSE FOR
MCKAY BAY WASTE TO ENERGY (WTE) FACILITY ANNUAL STACK TESTING (RE-BID)
Please Print or Type
We the undersigned, as Bidders, hereby declare that we have carefully read this proposal or bid and the provisions, terms and conditions concerning the equipment, materials, supplies or services as called for, and with full knowledge and understanding of the requirements and conditions, do hereby agree to furnish and to deliver as indicated, FOB, City Facility Location, with all transportation charges prepaid, and for the prices quoted thereon as follows.
A. ANNUAL TESTING
DESCRIPTION
QTY
UOM
TOTAL COST
| Annual Compliance Testing and RATA same Mobilization, audit sample acquisition and analysis, CO2 sample and analysis, four mercury test runs on the outlet of each unit, Dioxins/Furans Testing |
| 1 |
| Lot |
| $ _____________________ |
B. STANDBY/OVERTIME/ADDITIONAL WORK:
DESCRIPTION
| Hourly Rate (Per Person) |
| 270 |
| Hours |
| $ _____________________ |
C. HOTEL/PERDIEM DAILY RATE:
(If additional work is requested or testing is delayed which will cause additional days of testing)
DESCRIPTION
| Hotel/Per Diem Daily Rate |
| 3 |
| Days |
| $ _____________________ |
D. OTHER EXPENSES MARKUP PERCENTAGE (NOT TO EXCEED 10%): ____________%
TOTAL AMOUNT OF BID (A+B+C): $
image1.jpg image2.jpeg