STA Depoe Bay SOW Paving.pdf
PDF 528 KB Posted
- Attached to
- Parking Lot Paving Station Depoe Bay
- Solicitation number
- 70Z03326QSEAT00003
About this file
This is a Statement of Work for paving services at the U.S. Coast Guard Station Depoe Bay located at 240 Coast Guard Dr., Depoe Bay, Oregon 97341.
The contractor is required to grade and fully pave the upper parking lot, providing all labor, materials, services, equipment, and supervision. Specific tasks include excavating and removing failed asphalt and unsuitable base materials; preparing and grading the subgrade for proper drainage; furnishing, placing, and compacting 1 inch of crushed aggregate base; applying a tack coat; placing and compacting approximately 2 inches of hot mix asphalt over the approximately 3,984 square foot project area; and performing final site cleanup and restoration. The pavement must be capable of supporting multiple standard vehicles, properly graded to prevent water pooling, and installed in compliance with applicable specifications and USCG standards. All work must be performed in a workmanlike manner utilizing OSHA Safety and Health Standards (29 CFR Part 1926) and comply with all applicable federal, state, and local safety requirements. The contractor must furnish a contract manager with full authority and English language proficiency, maintain neat appearance of personnel, and provide valid identification for all employees entering the Coast Guard facility. Standard working hours are Monday through Friday, 8:00 a.m. to 4:00 p.m., unless adjusted with 24-hour written notice to the Contracting Point of Contact. Invoices must be submitted through the Invoice Processing Platform (IPP) at https://www.ipp.gov/. The government will furnish 120-volt power supply and water supply; the contractor is responsible for all other materials and equipment. Government acceptance of completed work will be made by the Point of Contact as documented on contractor-generated testing and completion forms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
USCG STA Depoe Bay Paving
USCG STA Depoe Bay 240 Coast Guard Dr. Depoe Bay, OR 97341
PART 1 - GENERAL
1 - Scope Of Work
The intent of this Statement of Work (SOW) is to have the contractor grade and fully pave upper parking lot. The contractor will provide all labor, materials, services, equipment, and supervision needed to complete the work at U.S. Coast Guard Station Depoe Bay, located at
240 Coast Guard Dr., Depoe Bay, OR 97341.
2 - Place of Performance
USCG STA Depoe Bay 240 Coast Guard Dr. Depoe Bay, OR 97341
Contractor Personnel
Contract Manager
• The contractor must provide a contract manager who must be responsible for the performance of the work.
• The contract manager or alternate(s) must have full authority to act for the contractor on all contract matters relating to daily operation of this contract
• The contact manager and alternate or alternates must be able to read, write, speak, and understand the English language.
Contractor employees
• The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
• Contactor personnel must present a neat appearance and be easily recognized as contractor employees.
• The contractor must not employ any person who is an employee of the U. S.
Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U. S. Coast
Guard unless such person seeks and receives approval according to U. S. Coast Guard regulations.
Security requirements
Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, while onboard a Coast Guard facility, shall have proper valid identification. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition.
Hours of Operation – Projected Date of Completion
• The contractor must perform the tasks as required by the SOW under this contract during the following hours:
• Monday through Friday between 08:00 am and 16:00 pm unless other time is specified.
• Holidays: If applicable.
• Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required above, the contractor must request the same in writing. Submit written request to the Contracting Point of
Contact (POC) a minimum of 24 hours before the requested adjusted work schedule.
If the desired schedule change is to be effective on a Monday, the request must be submitted to the (POC) prior to 9:00am on the Friday prior to commencement of work.
Invoicing
In conjunction with the subject award, proper invoices will be submitted through the Invoice
Processing Platform (IPP) at https://www.ipp.gov/. IPP is a secure web-based electronic invoicing system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal
Service in partnership with the Federal Reserve Bank of St. Louis (FRSTL). IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.
Actions to take:
If you are already enrolled in IPP:
If your company is already registered to use IPP, you will not be required to re-register and you do not need to contact IPP.
If you are NOT already enrolled in IPP:
The point of contact you provided in your SAM.gov registration will receive two emails from ipp.noreply@mail.eroc.twai.gov. Please note that emails from this email address may filter into your spam or junk folder:
1. The first email will have the IPP Logon ID and a link to the IPP application.
2. A second email, which will be sent within 24 hours of the first email, contains a temporary password.
Once your contact receives these emails, please ensure they log into IPP and complete the registration process.
Once registered to use IPP, your company may submit invoices electronically, receive e-mail notifications when requests are paid, view payment history, and access remittance downloads.
The e-mail notification of payment is sent when a payment is distributed to your bank account and may include the following payment information: Date of payment, dollar amount, invoice number, paying agency, payee name, and ACH trace number.
Vendor training materials, including a first time login tutorial, are available on the https://www.ipp.gov/ website. Once you have logged in to the IPP application, you will have access to user guides that provide step-by-step instructions for all IPP capabilities, ranging from creating and submitting an invoice to setting up email notifications. Live webinars are held monthly and provide a great opportunity to learn the basic of the system and to call in and ask the IPP team questions about the IPP application.
IPP Customer Support is available to assist users of the system and can answer your questions related to accessing IPP or completing the registration process.
• Toll-free number: 866-973-3131
• Email address: IPPCustomerSupport@fiscal.treasury.gov
• Hours of operation: Monday through Friday (excluding bank holidays) from 8:00 am -
6:00 pm ET
PART 2 - DEFINITIONS
General Definitions
When the (SOW), solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulations (FAR), the word or term has the same meaning as the definition as contained in section 2.101 of the FAR. The FAR index is available via the
Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix.
Defective Service: A service or commodity output that does not meet the standard of performance requirement specified in the contract for that service or commodity.
Quality Assurance: A planned and systematic pattern of all government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government assurance functions for a contracted service.
Quality Control: Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements.
Technical Definitions: Not applicable to contract.
PART 3 - GOVERNMENT FURNISHED PROPERTY AND SERVICES
General Information
The Government must provide the facilities, equipment, materials, and services listed here:
Government Furnished Equipment:
The following utilities are available for use at no cost by the contractor:
• 120v power supply
• Water supply
Government Furnished Material: None.
PART 4 - CONTRACTOR FURNISHED ITEMS AND SERVICES
Except for those items, services, or commodities specifically stated in part 3 above as government furnished, the contractor must furnish everything needed to perform this contract according to all its terms.
PART 5 - SPECIFIC TASKS
The contractor shall dig out and haul away existing unsuitable base material and portion of existing failed asphalt. Shape, import and place 1'-0 crushed aggregate, grade and compact.
Base, tack, pave, and overlay @2" nominal compacted depth commercial asphalt concrete pavement. Total area (+/-)3,984 SF. The installation must meet all associated specifications for the job and USCG standards.
DETAILED TASKS
All tasks shall comply with relevant local, state, and federal regulations, and adhere to industry best practices for safety and quality assurance.
1. The contractor shall mobilize to the project site at Station Depoe Bay and prepare the work area for safe operations, including placement of necessary signage and barriers.
2. The contractor shall cut, excavate, and remove failed asphalt and unsuitable base materials, and legally dispose of all debris off-site.
3. The contractor shall prepare, shape, and grade the subgrade to promote proper drainage and provide a stable foundation.
4. The contractor shall furnish, place, and compact 1”-0 crushed aggregate base to the required depth and density.
5. The contractor shall apply a tack coat to ensure proper bonding between existing pavement and new asphalt.
6. The contractor shall place and compact approximately 2 inches of hot mix asphalt over the project area ensuring a smooth and uniform surface.
7. The contractor shall compact and finish the pavement in accordance with applicable Standards.
8. The contractor shall perform final cleanup, remove all equipment and excess materials, and leave the site in a clean and serviceable condition.
OTHER
1. All work shall be performed in a workmanship-like manner utilizing OSHA Safety and Health Standards.
2. The new asphalt concrete pavement shall be capable of holding multiple standard vehicles.
3. The new asphalt concrete pavement shall be graded in manner to prevent large puddles, collection of water and ensuring proper drainage.
4. The installation site must be cleaned and restored to its original condition upon completion of the project.
5. The contractor must coordinate all work schedules to minimize weather delays.
Interferences:
The contractor shall be responsible for any/all interferences that may be encountered while completing this SOW.
Safety:
All work shall be conducted in a safe manner and shall comply with all applicable Federal, State, and local safety standards and requirements. The US Coast Guard reserves the right to inspect for compliance with safety standards and requirements. The Contractor shall comply with all Federal, State, and local laws, including OSHA.
Operations and Storage Facilities:
The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the on-site representative with the concurrence of the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.
PART 6 - TESTING AND ACCEPTANCE
Testing
The contractor shall document and advise cure time.
Acceptance
Acceptance on behalf of the government will be made by the POC as attested to / witnessed by signatures on the contractor generated document / form per section 6 "Testing" above.
PART 7 - APPLICABLE PUBLICATIONS AND FORMS
Publications and forms that apply to the (SOW) are listed below. The publications and forms have been designated as either mandatory or informational. The contractor is obligated to follow those publications and use those forms designated as mandatory to the extent specified in other sections of this (SOW). The contractor must be guided by those publications or use those forms designated as informational to the extent necessary to accomplish requirement in this (SOW).
Publications
OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for
Construction
END