LABORATORY & TESTING SERVICES FOR BARC’s WATER AND WASTEWATER SYSTEMS Federal contract opportunity
Solicitation number
12305B22Q0005
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

About this file

This statement of work and related federal contract opportunity seek laboratory and testing services for the United States Department of Agriculture's Beltsville Agricultural Research Center water and wastewater systems. The statement of work details the background of BARC's water wells, raw water system, water treatment plant, water distribution system, wastewater collection system, and two wastewater treatment plants. It outlines the scope of work to be performed including sample collection, storage, testing, analysis, documentation, reporting and communication of results. Quotes for the one-year contract with four optional one-year extensions are due by October 14, 2021. The selected contractor will be responsible for ensuring compliance with various Maryland Department of Environment permits for BARC's water and wastewater facilities.

View the file

Other files for this federal contract opportunity

Other files attached to LABORATORY & TESTING SERVICES FOR BARC’s WATER AND WASTEWATER SYSTEMS, newest first.
File Type Posted
sEastside WWTPState Discharge Permit 15DP2525 NPDES Permit MD0020842.pdf PDF
sEastside WWTPMaryland Sewage Sludge Utilization SSU Permit No 2020SAG4345.pdf PDF
sWTPState Water Appropriation and Use Permit No PG1990G0120.pdf PDF
sLab Service Performance Requirments SummaryBA.PDF PDF
sWestside WWTPState Discharge Permit 17DP2787 NPDES Permit MD0020851.pdf PDF
sCI FAC 2021 06.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF AGRICULTURE BELTSVILLE AGRICULTURAL RESEARCH CENTER

FACILITIES SERVICE

UTILITIES MANAGEMENT UNIT

BUILDING 426A, BARC EAST

10300 BALTIMORE AVENUE

BELTSVILLE, MARYLAND 20705-2350

STATEMENT OF WORK AND SPECIFICATION

TO

CONTRACT FOR LABORATORY & TESTING SERVICES FOR BARC’s WATER AND WASTEWATER SYSTEMS

BELTSVILLE AGRICULTUREAL RESEARCH CENTER

BELTSVILLE MARYLAND

August 23, 2021

GENERAL REQUIREMENTS

1. GENERAL

1.1. BACKGROUND

The United State Department of Agriculture (USDA), Agricultural Research Services (ARS), Beltsville Agricultural Research Center (BARC) owns and operates eight (8) Water Wells, a Raw Water System, a Water Treatment Plant (WTP), a Water Distribution System (WDS), a Wastewater Collection System (WWCS), and two Wastewater Treatment Plants (WWTP) located in Beltsville, MD. The WTP and both WWTP are permitted to operate by the Maryland Department of the Environment (MDE) under the following permits:

· BARC WTP:

· State Water Appropriation and Use Permit No. PG1990G012(04)

· Maryland Department of the Environment (MDE), Drinking Water Branch, Drinking Water Watch, Samples and Compliance Schedules, Water System No.: MD0160001

· Additional State and Local Regulations

· BARC Eastside WWTP:

· State Discharge Permit 15-DP-2525; NPDES Permit MD0020842

· Maryland Sewage Sludge Utilization (SSU) Permit No. 2020-SAG-4345

· BARC Westside WWTP:

· State Discharge Permit 17-DP-2787, NPDES Permit MD0020851 Historically, all laboratory and testing services for these facility have been contracted out to outside laboratory services either independently or under the Superintendent contract.

1.2. PROJECT LOCATION

Beltsville Agricultural Research Center (BARC) is located in Beltsville, MD. Work shall be performed within the entire BARC facilities, but the major facilities are as follows:

Water treatment plant – Building 310 Eastside Wastewater Treatment Plant – Building 218 Westside Wastewater Treatment Plant – Building 015

1.3. INTENT

The intent of this solicitation is to award one PERFORMANCE-BASED contract for the sample collection, storage, analysis, testing, documentation and communication of results as appropriate of BARC’s Water and Wastewater Systems as required by the Systems’ Permits issued by the regulatory agencies such as MDE.

1.4. CONTRACTOR’S QUALIFICATIONS

The minimum qualifications by a contractor to be qualified to this job is a combination of the following:

A. Contracting Company

a. Minimum of 5 years as a contracting company

b. Minimum of 5 years performing similar management of laboratory testing contracts for water and wastewater systems, with minimum of 3 years of each.

B. Laboratory Services

a. Reputable laboratory with at least 10 years of experience of providing similar collection, testing, documenting, and reporting services to MDE C. Proof of qualification shall be submitted with contact names and numbers to verify qualifications.

1.5. GENERAL RESPONSIBILITIES AND REPORTING

A. Under this contract, the Contractor Laboratory Services will be reporting internally to BARC’s Utilities Management Unit Manager (UMUM). In coordination with, and under the general supervision of the BARC’s management, and BARCs Contracting Superintendent, the Contractor Laboratory Services shall be fully responsible for the collection, storage, testing, analysis, documentation and communication of compliance reporting of BARC’s Water and Wastewater Systems, the general responsibilities of this contract include but aren’t limited to:

1. Sample collection

2. Testing and analysis of samples collected

3. Documentation of testing and analysis results

4. Communication of documented results as appropriate

2. ADMINISTRATIVE

2.1. MANDATORY PR-EBID MEETING AND SITE VISIT

A. All prospective bidders must attend a mandatory meeting and a site visit during which a full description of the systems will be provided and a site visit to major systems’ facilities and components will be performed. The mandatory meeting and site visit date and time are as follows:

Meeting Date:September ????, 2021
Meeting Time:9 AM
Meeting Location:BARC Building 426, Conference Room
426 Powder Mill Rd, Beltsville, MD 20705

B. All questions/answers from the meeting will be published as an addendum to the Bid Documents.

C. Additional questions will be accepted only by email (john.blunt@usda.gov) for a one-week period from the day of the meeting, all submitted questions will be answered as an addendum to the bid documents.

D. Direct contacts with any BARC personnel about this solicitation isn’t permitted during the advertisement period of this solicitation and will disqualify the bidder.

2.2. SECURITY

All employees of general contractor and subcontractors shall comply with ARS security management program, obtain permission of the ARS Location Manager, be identified by project and employer by wearing contractor-issued identification badges at all times on ARS property, and restricted from unauthorized access.

2.3. SAFETY/OSHA CERTIFICATION

B. Prior to commencing work, the general contractor shall provide proof that an OSHA identified “competent person” (CP) (29 CFR 1926.32(f) will be present when Contractor’s personnel access any BARC sites that require such designation.

"Competent person" means one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.

C. The BARC facilities identified above and the work to be performed under this contract may include locations and activities that will require certain safety measures (confined space, trip hazard, fall hazard, chemical hazard, …etc.), the contractor is required to have OSHA Certified personnel enter such facilities or perform such activities.

D. Training:

1. All employees of the general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training.

2. Submit training records of all such employees to the Contracting Officer for approval before the start of work.

3. SCOPE OF WORK

3.1. DESCRIPTION OF WORK

A. The US Department of Agriculture, BARC is seeking a Contractor Laboratory Service for BARC’s Water and Wastewater Systems, including, Water Wells, Raw Water System, Water Treatment Plant (Building 310), Water Distribution System, Wastewater Collection System, and Wastewater Treatment Plants (Buildings 218, 015), located at the USDA BARC Campus.

B. The Contractor Laboratory Service shall be responsible for the collection, storage, testing, analysis, documentation, reporting and management of samples of the water and wastewater systems noted above, within the applicable rules and regulations of the Maryland Department of the Environment (MDE) and the permits for these facilities.

C. The Contractor Laboratory Service availability at the facilities shall be as follows:

1. As required by the Water and Wastewater System’s permits requirement for collection, storage, testing, analysis of samples.

D. The Contractor Laboratory Service shall represent and act on behalf of USDA BARC on all permit related samples collection, storage, testing, analysis, documentation, reporting and communication to the appropriate entities identified in this SOW. The Contractor Laboratory Service shall include the BARC’s UMUM, the Contracting Officer Representative (COR) and any other BARC employees or contractors designated by the UMUM in all correspondence.

E. Communication of results of periodic testing and analysis of samples collected by the Contractor Laboratory Service for the purposes of compliance reporting shall be as follows:

1. The main copy of all reports and documentation shall be communicated to the BARC Contractor Superintendent.

2. A copy of all reports and documentation shall be communicated to BARC UMUM.

3. A copy of all report and documentation shall be communicated to the COR.

4. A copy of all reports and documentation shall be communicated to any BARC’s employees or contractors designated by the UMUM to receive such reports.

F. Report of testing results shall be communicated in both Portable Document Format (pdf) and MS Office Excel format.

G. Raw water, Water Treatment Plant water, treated water and Distribution System water samples collection and analysis shall be planned, scheduled, and executed in coordination with the BARC Superintendent contracted by USDA, BARC to satisfy all conditions to provide full reporting as required by the:

1. Maryland Department of the Environment (MDE), Drinking Water Branch, Drinking Water Watch, Samples and Compliance Schedules, Water System No.: MD0160001.

2. Samples collection and analysis shall also conform to the requirements for semi-monthly iron testing as required by the Prince George's County System Engineer.

H. Sample collection, storage, analysis, and documentation of Collection System wastewater; Wastewater Treatment Plants influent, effluent and through the plants processes wastewater shall be planned, scheduled and executed in coordination with the BARC Superintendent contracted by USDA, BARC to satisfy all condition to provide full reporting as required by the following permits:

1. BARC Eastside WWTP

a. State Discharge Permit 15-DP-2525; NPDES Permit MD0020842

b. Maryland Sewage Sludge Utilization (SSU) Permit No. 2020-SAG-4345

2. BARC Westside WWTP:

a. State Discharge Permit 17-DP-2787, NPDES Permit MD0020851 I. The Contractor Laboratory Services shall HIGHLIGHT any results violating permit requirements or identify such results in their written correspondence cover letter/email that accompanies these results. The Contractor Laboratory Services shall report any existing, new, unusual problems, deficiencies and deviations from standards encountered to the BARC Superintendent and UMUM.

3.2. QUALITY ASSURANCE PLAN

For any performance-based contract, USDA-BARC has a plan to ensure Quality expectations are met and the work is being performed to specifications. For the work being performed under this SOW, the Quality Plan and Quality Assurance Procedures are as follows:

A. All work being performed by the successful contractor will be checked for quality as follows:

1. USDA-BARC shall require the contractor to share their work schedule and periodically check on the presence of the contractor’s personnel per that schedule

2. Prior to commencing work, USDA-BARC shall interview the Contractor Laboratory Services Project Manager and team on their understanding of the Systems’ Permits and their requirements of performance and reporting. Such interview will be carried out if any change in contractor’s personnel takes place.

3. USDA-BARC shall ensure that its designated personnel are included in all correspondence between the Contractor Laboratory Services and the BARC Superintendent and the permitting agencies.

4. USDA-BARC personnel shall periodically check on samples collection, storage and analysis collected by the Laboratory Services.

5. USDA-BARC personnel shall continuously monitor communication and reporting between the Contractor Laboratory Services and Superintendent to verify accurate reporting.

6. USDA-BARC personnel shall periodically check the testing results record for accuracy, completeness, proper documentation and communication of such records.

3.3. DESCRIPTION OF FACILITIES

A. Raw Water System The BARC’s raw water system consists of Eight (8) Water Wells and a Raw Water piping that conveys water from the Eight (8) wells to the BARC Water Treatment Plant. Each well has a Well House which houses a check valve, isolation valves, a meter, a sampling point, pressure gauges and switches.

B. Water Treatment Plant & Distribution System BARC’s Water Treatment Plant draws water from the 8 water wells described above. Water is permitted under the State Water Appropriation and Use Permit No PG1990G012(04). The Water Plant is permitted for 750,000 gpd average flow and 1,000,000 gpd average flow at maximum month flow. Its Processes include:

· Aeration Tower

· Chemical addition (Soda Ash for PH)

· Chlorination

· Raw Water Wet Well and Transfer Pumps

· Filtration (6 Pressure Media Filters)

· Treated Water Storage Tank and High Service Pump Station

· 3 Elevated Storage Tanks (elevated towers)

· Distribution Network C. Wastewater Collection System BARC’s Wastewater Collection System consists of a network of separate sanitary sewer and in portions of the area it has a combined storm/sanitary sewer system. In addition to the sanitary sewer system, the collection system includes:

· 6 satellite lift stations (194, 304, 308C, 1008, 1500, and 1286)

· Eastside WWTP lift station

· Westside WWTP lift station

· Overland Flow Storage Pond/Lagoon D. Westside WWTP The Westside WWTP serves the west side of the Beltsville Agricultural Research Center. It is a small Package Plant rated at an Annual Average Flow of 0.2 MGD. Its major processes and equipment include:

· A duplex influent lift station

· A dual grit removal facility

· A flow equalization tank

· Two treatment units each consist of:

· Activated sludge aeration basin

· A clarifier, and

· An aerobic digester

· WAS/RAS Pump Stations

· Two effluent filters

· A two battery Ultra-violet disinfection followed by cascade aeration

· Effluent pump station

· A sludge holding tank

· Other ancillary equipment E. Eastside WWTP The Eastside WWTP is the major WWTP of the complex and is currently permitted for 0.62 MGD average daily flow. The plant’s main process is an Enhanced Nutrient Removal (ENR) treatment plant, its major processes and facilities include:

· Overland flow storage pond

· Two comminutor channels and a bypass screen channel

· A duplex influent lift station

· A fine bar screen and a bypass channel

· A grit removal unit

· A 5-stage ENR Bardenpho Process

· Two final clarifiers

· WAS/RAS pump stations

· 3 effluent filters

· Chlorination basin

· Sulfur dioxide de-chlorination

· Outfall pumps

· Chemical processes include:

· Pack feed

· Supplemental carbon feed

· Sodium Hydroxide to be replaced with Magnesium Hydroxide

· Two 180,000 gallons sludge holding tanks

· Other ancillary equipment

4. PERIOD OF PERFORMANCE:

The period of performance for the Contractor Laboratory Services Contract is from October 1, 2021, to September 30, 2022, a period of ONE (1) YEAR, and is renewable for FOUR (4) periods of ONE (1) YEAR each as desired by BARC for a full term of contract (including the option periods) of FIVE (5) YEARS to expire on September 30,2026

5. ATTACHMENTS

The following is attached in order for bidders to fully understand the scope of work and performance expectations based on permit requirements, limitations, required testing and lab services, frequencies, …

· BARC WTP:

· State Water Appropriation and Use Permit No. PG1990G012(04)

· Maryland Department of the Environment (MDE), Drinking Water Branch, Drinking Water Watch, Samples and Compliance Schedules, Water System No.: MD0160001.

· BARC Eastside WWTP:

· State Discharge Permit 15-DP-2525; NPDES Permit MD0020842

· Maryland Sewage Sludge Utilization (SSU) Permit No. 2020-SAG-4345

· BARC Westside WWTP:

· State Discharge Permit 17-DP-2787, NPDES Permit MD0020851