SSJ_Redacted.pdf
PDF 463 KB Posted
- Attached to
- Sole Source Notice due to Urgency of Need
- Solicitation number
- V214225217EE99
About this file
This document is a Justification for Sole Source (Simplified Acquisitions) for the USS GUNSTON HALL (LSD-44), focusing on the rewind of a fuel oil purifier motor. The specific motor is a General Electric Motor manufactured by GRUNDFROSS, with 40 HP, 1720 RPM, 440 Volts, 48.9 Amps, and design specification 36DS1129D, frame 365TNS, meeting Mil-M-17060E military standards.
The performance period is from 08/18/2025 to 8/27/2025. The contractor's responsibilities include completely disassembling the motor, rewinding the stator, measuring and recording machine fits (including shaft journals, bearing bores, shaft, and keyways), installing new bearings, and delivering the motor prepped and painted. The total quoted cost is redacted, and the document indicates this is a sole source procurement with no available substitutes, representing the minimum requirements of the government.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTION
PERFORMANCE OF WORK STATEMENT
USS GUNSTON HALL (LSD-44)
I. USS GUNSTON HALL (LSD-44) requires:
REWIND OF THE FUEL OIL PURIFIER MOTOR
2. Period of Performance or Delivery Datc(s):
08/18/2025 - 8/27/2025
3. Requirement Linc items ofrepair in accordance with military specification outlined
General Electric Motor - MFG: GRUNDFROSS / HP: 40/ RPM: l 720 / Volts: 440 / Amps:
48.9 / Design: 36DS1129D/ Frame: 365TNS/ Mil-M-17060E
4. It is the responsibility of the contractor to:
a) Disassemble, stator rewind. measurement and recording of machine fits: shaft journals, bearing bores, shaft and keyways.
b) Provision and installment of ne\\' bearings.
c) Have motor prepped, painted and delivered.
File details come from the government source that posted it. Updated .