SSJ Redacted.pdf
PDF 118 KB Posted
- Solicitation number
- N3220525Q2410
About this file
This is a Memorandum for Use of Other Than Full and Open Competition under the Simplified Acquisition Threshold for a naval equipment procurement. The document details a non-competitive acquisition for an open and inspection of a main circulating pump's steam turbine drive for the USS Mt Whitney. The specific requirement is for a steam turbine drive manufactured by Curtiss-Wright in the late 1960s, with the sole design rights held by the original equipment manufacturer (OEM).
The procurement is justified under restrictive rights provisions, as Military Sealift Command (MSC) does not own the drawings and lacks the engineering capability to reverse engineer the design package. The period of performance is from 1 through 30 September 2025, with the intended use being a spare pump drive for the USS Mt Whitney. The procurement will be sourced directly from Curtiss-Wright, with the procurement request number 1301258810, following Federal Acquisition Regulation (FAR) guidelines for single-source acquisitions under the simplified acquisition threshold.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220525Q2410.docx | DOCX document | |
| MTW SOW 25-002 MCP Turbine.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 June 2018)
Date: 18 June 2025
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) PR Number(s): 1301258810
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
Provide a description of the item or service required, to include: An open and inspection of a main circulating pump’s steam turbine drive.
1.
a) the name of the required source or brand name
Steam turbine drive for USS Mt Whitney’s main circulating water pump
b) the required delivery date/period of performance and
POP: 1 thru 30 September 2025
c) its intended use.
USS MT Whitney spare pump drive
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
Curtiss-Wright
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. _____ Only one responsible source (select all that apply):
1. _X__ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights. The steam turbine was manufactured in the late 1960’s and the sole design rights are held by the OEM Curtis Wright.
b. If drawings are included, who is identified as “owning” the drawings. MSC does not own drawings and lacks the engineering capability to reverse engineer a design package.
Additionally, MSC does not have manufacturing and technical information required to
2 Ver 2.0 (01 June 2018) evaluate and determine whether non-OEM service and replacement parts offered are equivalent to the OEM components and replacement parts. The OEM has access to provide parts and technical data/drawings as required by ABS.
2. ___ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)
3. ___ OTHER REASON:
a. _____ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number: _______________________
b. ____ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s):
ii. Identify other vessels with this Make / Model:
c. ____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
ii. Describe how the equipment must be compatible with the existing configuration.
d. ___ OTHER:
4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: __________
b. Required delivery date / Period of Performance: _________
c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement. _________
3 Ver 2.0 (01 June 2018)
d. Estimated production lead time: __________.
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number: ____________
File details come from the government source that posted it. Updated .