This document is a Justification and Approval for Other Than Full and Open Competition for the acquisition of proprietary Chicago Gooseneck Faucet assemblies adapted with Powers thermostatic cartridge assemblies. The VA Pittsburgh Healthcare System (VAPHS) requires these faucet assemblies for a renovation project on the East floor of the Pittsburgh University Drive medical center. The Chicago Gooseneck Faucet assembly is the only product that meets the VA's requirements for preventing the spread of germs, controlling water temperature to prevent scalding, and easy maintenance. No other manufacturer offers a comparable product. The contract will be awarded as a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under a larger construction project. The estimated value of the faucet assemblies is redacted. The related federal contract opportunity is for the renovation of the B1 2E Clinics at the Pittsburgh VAMC, with a period of performance of 730 calendar days and an estimated construction value of over $10 million.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

Justification and Approval (J&A) For

Other Than Full and Open Competition (>SAT)

Acquisition Plan Action ID:

Contracting Activity:

Department of Veterans Affairs, VISN 04, VAPHS, University Drive Campus, Pittsburgh, PA 15240

Nature and/or Description of the Action Being Processed: Acquistition of proprietary Chicago Gooseneck Faucet assembly to be adapted with Powers thermostatic cartridge assembly for Powers 215A15. These faucet assemblies are the current application throughout VAPHS due to Chicago Gooseneck faucet assembly is easily adaptable with use of Powers thermostatic cartridge assembly and all key components are above sink level for easy access. These are part of the large renovation of the East floor at the Pittsburgh University Drive medical center this is a complete floor renovation.

These faucets are to be used as the only faucet that is part of this renovation since they meet the standard that VISN 4 has put out as guidance to all of its medical centers to ensure patient safety and to limit the spread of germs. Chicago Goosneck Faucet assembly consist of the following parts:

Chicago Faucet 2302 – ABCP, Chicago Spout 626 – FCABCP, Sloan Trim Plate MIX-104-A.

This Sole Source Product is for Chicago Gooseneck faucet assembly adapted with the Powers thermostatic cartridge assembly 215A15 to be used in this project. This item will be approximately

Description of Supplies/Services Required to Meet the Agency’s Needs: The VAPHS uses Chicago Gooseneck faucet assembly adapted with a thermostatic cartridge assembly throughout all facilities on both the University Drive and Heinz Campuses. Powers Gooseneck Faucet has been found to give the most advantage to prevent Legionella, and use of an anti-scalding device – a perfin wax ring located inside the cartridge. This is in coherence with VA policy 1061. Anti-Scald Device. Anti-scald device is a temperature actuated appurtenance used in plumbing systems to reduce/stop water flow exceeding a defined temperature. Individual anti-scald devices must meet the American Society of Sanitary Engineers (ASSE) 1062 Standard. Anti-scald devices may be add-on or integrated into plumbing fixtures or integrated into water tempering valves. It is very easy to routinely clean and disinfect by the custodial staff using common products eliminating the need to stock numerous different cleaning products. Powers thermostatic cartridge assembly allows for temperature control providing safety to patients and staff from scolding water; while simutanlously allows the boilers to maintain 140 degrees to help kill potentially bacteria such as legionella in the water. The anti scaling device also allows the facility to rest assure the patient or staff member that may have hand sensory issues using the faucet never gets scalded incase of a plumbing failure with the faucet. Chicago Gooseneck Faucet assembly has qualities, as noted below, that are key factors in the standardization process. This allows for quick replacements to be completed by our M&R with no adverse side effects to our patients. Allows for stock replacement pieces to be avaible with quick turn around in repair and cost. VAPHS has been making a conscious effort to standardize the finishes throughout the restroom, laboratory and clinical areas to make them more resistant to infectious pathogens and easier for the limited custodial staff to maintain.

The Chicago Gooseneck Faucet assembly is used across the VAPHS campuses are designed with the following performance criteria:

Chicago Faucet 2302-ABCP Features & Specifications:

Single hole with side valve 5-1/4" rigid/swing gooseneck spout Pressure compensating Softflo aerator 2.2 GPM 2-3/4" lever handle Ceramic operating cartridge with volume control and hot water limit stop ECAST® design provides durable cast brass construction with total lead content equal to or less than 0.25% by weighted average Complies with the requirements of the Buy American Act of 1933.

Item Ships in 3 Days of order

Performance Specification:

Rated Operating Pressure: 20-125 PSI Rated Operating Temperature: 40-140°F (Note: 180°F max.

during temporary high-temperature system flush)

Chicago Spout 626-FCABCP

Features & Specifications:

1.5 GPM (5.7 L/min) laminar flow control insert in spout inlet 5-1/4" rigid/swing gooseneck spout with 1.5 GPM flow control ECAST® design provides durable cast brass construction with total lead content equal to or less than 0.25% by weighted average Complies with the requirements of the Buy American Act of 1933.

Performance Specification:

Rated Operating Pressure: 20-125 PSI Rated Operating Temperature: 40-140°F

Sloan MIX-104-A TRIM PLATE 8” (Double Hole) Features & Specifications:

Direct replacement cover for discontinued Chicago cover plate - 232-CP

4. Statutory Authority Permitting Restricted Competition:

( X ) Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements in accordance with FAR 6.302-1(b)(1)(i)

( ) Unusual and Compelling Urgency ( ) Industrial Mobilization, Engineering, Developmental or Research Capability or Expert

Services ( ) International Agreement ( ) Authorized or Required by Statute ( ) National Security ( ) Public Interest

5. Demonstration that the Contractor’s Unique Qualifications or Nature of the Acquisition Requires the Use of the Authority Cited Above (applicability of authority): The acquistition is authorized pursuant to 10 U.S.C. 2304 (c)(1), and is implemented by FAR 6.302-1 (c), Only one responsible source and no other supplies or services will satisfy agency requirements. This product currently is only made by one manufactor, at current market research no other manufactors have been found that provide equal product qualities that the faucet and thermostatic cartridge assembly does to satifiy the plumbing requirements set by the VA plumbing design guidelines. Granite – a mixing valve under the sink could work as well. But time and time again in our facility plumbing experts have noticed that these 3/8’’ mixing valves fail causing cross contaimanation throughout an entire wing or floors. Simplification of this assembly helps avoid additional maintaince and taking up inventory space of many different faucet assemblies. The installation of material finishes other than noted faucet with assembly would require duplication of maintenance materials and could expose our veteran patient population to dangerous pathogens unnecessarily.

6. Description of Efforts Made to ensure that offers are solicited from as many potential sources as deemed practicable: Current market shows no competion for the suppliers of the Chicago Gooseneck Faucet Assembly adapted with Power thermostatic cartridge assembly. Any other product without thermostatic cartridge would cause an undue hardship on the VA Pittsburgh Healthcare System due to the potential risk it poses staff and patients without the features this faucet offers. There are other manufactorers that provide a thermostatic cartridge to ensure adequate tempeartures and prevent burns, but no other manufactor offers the ability to disassemble and clean the faucet the way that Chicago Gooseneck faucets do. These features in combination with one another leave no other supply fully capable of supplying a facuet that can be safe and prevent the spread of germs or water borne patogenes.

7. Determination by the CO that the Anticipated Cost to the Government will be Fair and

Reasonable: This item is being sole sourced under a larger construction project that will be competed as a 100% Service Disabled Veteran Owned Small Business (SDVOSB) set aside.

Therefore, competition will be provided on the base contract which will lead to a fair and reasonable price.

8. Description of the Market Research Conducted and the Results, or a Statement of the Reasons

Market Research Was Not Conducted: These faucets have been used on a number of projects the prior faucets that were the VA’s standard equipment were discontinued which required a search by multiple plumbing sub contractors through various supply sources to find something that met the specifications required. This equipment was the only item that met all crietria others feature some of the same features as this manufator but none in the same combination. The prior knowledge from other contracts and speaking with our industry partners about these facuet fulfilled our requirement per FAR part 10. At this time we have exhausted standard means of market research for commercially available items any other item available would be a non-commerical or custom ordered product that would drastically increase cost. At this time this is the only manufacturer speaking with various supplies who relayed that manufactorers find it too expensive to include all of these features for a limited market ensure that we will likely need to rely on this item for the foreseeable future.

9. Any Other Facts Supporting the Use of Other than Full and Open Competition: N/A

10. Listing of Sources that Expressed, in Writing, an Interest in the Acquisition: N/A

11. A Statement of the Actions, if any, the Agency May Take to Remove or Overcome any Barriers to Competition before Making subsequent acquisitions for the supplies or services required: N/A.

12. Requirements Certification: I certify that the requirement outlined in this justification is a Bona Fide Need of the Department of Veterans Affairs and that the supporting data under my cognizance, which are included in the justification, are accurate and complete to the best of my knowledge and

Contract Officer Representative Date

11. Approvals in accordance with the VHAPM Part 806.3 OFOC SOP:

a. Contracting Officer or Designee’s Certification (required): I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

b. One Level Above the Contracting Officer (Required over SAT but not exceeding $750K): I certify the justification meets requirements for other than full and open competition.

Branch Chief, Construction West Date

Network Contracting Office 4