SSFOX_LAKE_PARKBid_Set_7826.pdf

PDF 3 MB Posted

Attached to
Fox Lake Park Boat Ramp Dock Replacement
Solicitation number
B-8-26-39
Issued by
Brevard County, Florida

About this file

This is a set of civil engineering drawings and construction documents prepared for Brevard County Parks and Recreation for the Fox Lake Park Boat Ramp Dock Replacement project located at 4400 Fox Lake Road, Titusville, Florida 32796. The project scope encompasses the demolition of the existing dock structure and installation of a replacement dock facility. The bid set includes a civil cover sheet, erosion control and stormwater pollution prevention plan (SWPPP), existing conditions and demolition plan, site and grading plan, and construction details prepared by Construction Engineering Group under Project Number 240108. The drawings are dated February 27, 2026, and were designed by RJN and drawn by SMB, with review and approval by David M. Tom, Professional Engineer (Florida License No. 56699). The contractor is required to obtain an NPDES Notice of Intent (NOI) and receive acknowledgment prior to construction commencement, unless exempt. Technical specifications and structural drawings are referenced as part of the procurement documents, with two addenda issued during the bidding period (Addendum 1 on June 26, 2026, and Addendum 2 on July 13, 2026).

The proposal deadline was July 17, 2026, with bid tabulation posted on the same date, indicating the bidding period has closed and the selection process has commenced. The procurement documents include a draft contract, detailed specifications (B82639_INV__SPECS.pdf), structural drawings, survey data, and photographic site documentation. The project incorporates standard Brevard County Public Works engineering development notes and requirements for erosion and sedimentation control, including silt fencing, soil tracking prevention devices, and curb inlet sediment control measures. No specific contract pricing, funding sources, or award information is detailed in these engineering drawings, as they function as technical design and construction specifications rather than financial or procurement summary documents.

View the file

Other files

File Type Posted
Notice_of_Award.pdf PDF
Bid_Tabulation.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
Bid_Tabulation__Names_Only.pdf PDF
Addendum_2.pdf PDF
Fox_Lake_dock_2.jpg JPG image
SSFOX_LAKE_PARKBid_Set_7826.pdf PDF
Fox_Lake_dock.jpg JPG image
Fox_Lake_dock_2.jpg JPG image
Fox_lake_dock_3.jpg JPG image
Addendum_2.pdf PDF
Fox_lake_dock_3.jpg JPG image
Fox_Lake_dock.jpg JPG image
Fox_Lake_dock_4.jpg JPG image
Fox_lake_dock_5.jpg JPG image
Fox_Lake_dock_4.jpg JPG image
Fox_lake_dock_5.jpg JPG image
Addendum_1.pdf PDF
Addendum_1.pdf PDF
Attachment_A__Survey.pdf PDF
Attachment_A__Survey.pdf PDF
Attachment_B__Structural_Drawings.pdf PDF
B82639_INV__SPECS.pdf PDF
B82639_INV__SPECS.pdf PDF
Attachment_C__Draft_Contract.pdf PDF
Attachment_B__Structural_Drawings.pdf PDF
Attachment_C__Draft_Contract.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NTS

FOX LAKE DOCK

TITUSVILLE, FL

DATE:

FEBRUARY 27, 2026

PREPARED FOR:

BREVARD COUNTY PARKS AND REC

SITE DATA:

2. CONTACT INFORMATION:

LOCATION MAP

CIVIL INDEX OF DRAWINGS:

CIVIL LEGEND:

C

IV

IL

C

O

VE

R S

H

EE

T

CIVIL ENGINEER:

SURVEYOR:

LOCATION:

Consulting Engineers

CONSTRUCTION

ENGINEERING

GROUP

G-1

3. SITE CHARACTERISTICS:

1. GENERAL STATEMENT:

PREPARED BY:

F O

X

LA

KE

R

O

AD

T

IT

U

SV

IL

LE

, F L

R

EV

D

AT

E

R

EV

IS

IO

N

D R

AW

IN

G T

IT

LE

240108

PROJ. NO. :

SCALE

DATE

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DRAWING NO.

FO

X

LA

KE

D O

C K

RJN

SMB

02/27/26 ww w.

ce ge ng ine eri ng

.co m

M elb ou rne

, F L

Ea u G all ie Blv d., Su ite A

Te

l. 3

.25

3.1

CO

A

C on su lti ng

E ng in ee rs

CO

NS

TR

UC

TI

ON

EN

GI

NE

ER

IN

G

GR

OU

P

DAVID M. TOM, PE

PE # 56699

DMT

CONTRACTOR SHALL PERMIT THE NPDES NOTICE OF

INTENT (NOI) AND RECEIVE THE ACKNOWLEDGEMENT

LETTER PRIOR TO BREAKING GROUND UNLESS EXEMPT

OWNER:

SITE

FOX

LAKE

FOX

LAKE

PARK

FOX LAKE ROAD

I-9

S. C

AR

PEN

TER

R O

AD

M

AR

TI

N

L U

TH

ER

K

IN

G J

R . B

LV

D

D

A

V

I

D

M

T

O

M

D

A

V

I

D

M

T

O

M

P

R

O

F

E

S

S

I

O

N

A L

E

N

G

I

N

E

E

R

P

R

O

F

E

S

S

I

O

N

A L

E

N

G

I

N

E

E

R

L

I

C

EN

S

E

L

I

C

EN

S

E

F

L

O

R I

D

A

F

L

O

R I

D

A

STATE OF

No. 56699

EROSION CONTROL PLAN

ST

O

RM

W

AT

ER

P O

LL

UT

IO

N

PR

EV

EN

TI

O N

PL

AN

(S W

PP

P)

G-2

CONTRACTOR RESPONSIBILITIES FOR NPDES (SWPPP)

DEWATERING PLAN:

DEWATERING SPECIFICATIONS:

EROSION AND SEDIMENTATION

CONTROL REQUIREMENTS

DANDY CURBTM

NOTES FOR SILT FENCES

TYPICAL FDOT SILT FENCE DETAIL

NTS

SOIL TRACKING PREVENTION DEVICE

NTS

NOTES:

TYPICAL FRAME AND FILTER

BARRIER FOR AREA DRAINS DETAIL NTS

NTS

CONTRACTOR SIGN-OFF / ACKNOWLEDGEMENT:

A

A

SECTION A-A

CURB INLET SEDIMENT CONTROL

1"=30'

1"=30'

F O

X

LA

KE

R

O

AD

T

IT

U

SV

IL

LE

, F L

R

EV

D

AT

E

R

EV

IS

IO

N

D R

AW

IN

G T

IT

LE

240108

PROJ. NO. :

SCALE

DATE

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DRAWING NO.

FO

X

LA

KE

D O

C K

RJN

SMB

02/27/26 ww w.

ce ge ng ine eri ng

.co m

M elb ou rne

, F L

Ea u G all ie Blv d., Su ite A

Te

l. 3

.25

3.1

CO

A

C on su lti ng

E ng in ee rs

CO

NS

TR

UC

TI

ON

EN

GI

NE

ER

IN

G

GR

OU

P

DAVID M. TOM, PE

PE # 56699

DMT

CONTRACTOR SHALL PERMIT THE NPDES NOTICE OF

INTENT (NOI) AND RECEIVE THE ACKNOWLEDGEMENT

LETTER PRIOR TO BREAKING GROUND UNLESS EXEMPT

C-1

NOTES:

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

AN

D D

EM

O

LI

TI

O N

P

LA

N

1"=10'

EXISTING CONDITIONS AND DEMOLITION PLAN

F O

X

LA

KE

R

O

AD

T

IT

U

SV

IL

LE

, F L

R

EV

D

AT

E

R

EV

IS

IO

N

D R

AW

IN

G T

IT

LE

240108

PROJ. NO. :

SCALE

DATE

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DRAWING NO.

FO

X

LA

KE

D O

C K

RJN

SMB

02/27/26 ww w.

ce ge ng ine eri ng

.co m

M elb ou rne

, F L

Ea u G all ie Blv d., Su ite A

Te

l. 3

.25

3.1

CO

A

C on su lti ng

E ng in ee rs

CO

NS

TR

UC

TI

ON

EN

GI

NE

ER

IN

G

GR

OU

P

DAVID M. TOM, PE

PE # 56699

DMT

CONTRACTOR SHALL PERMIT THE NPDES NOTICE OF

INTENT (NOI) AND RECEIVE THE ACKNOWLEDGEMENT

GENERAL NOTES: BREVARD COUNTY GENERAL NOTES:

C-2

NOTES:

SI

TE

A N

D G

R

AD

IN

G

P

LA

N

1"=10'

SITE AND GRADING PLAN

F O

X

LA

KE

R

O

AD

T

IT

U

SV

IL

LE

, F L

R

EV

D

AT

E

R

EV

IS

IO

N

D R

AW

IN

G T

IT

LE

240108

PROJ. NO. :

SCALE

DATE

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DRAWING NO.

FO

X

LA

KE

D O

C K

RJN

SMB

02/27/26 ww w.

ce ge ng ine eri ng

.co m

M elb ou rne

, F L

Ea u G all ie Blv d., Su ite A

Te

l. 3

.25

3.1

CO

A

C on su lti ng

E ng in ee rs

CO

NS

TR

UC

TI

ON

EN

GI

NE

ER

IN

G

GR

OU

P

DAVID M. TOM, PE

PE # 56699

DMT

CONTRACTOR SHALL PERMIT THE NPDES NOTICE OF

INTENT (NOI) AND RECEIVE THE ACKNOWLEDGEMENT

TYPICAL RAISED SIDEWALK DETAIL TYPICAL FDOT TYPE "D" CURB

C-3

NTS

F O

X

LA

KE

R

O

AD

T

IT

U

SV

IL

LE

, F L

R

EV

D

AT

E

R

EV

IS

IO

N

D R

AW

IN

G T

IT

LE

240108

PROJ. NO. :

SCALE

DATE

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DRAWING NO.

FO

X

LA

KE

D O

C K

RJN

SMB

02/27/26 ww w.

ce ge ng ine eri ng

.co m

M elb ou rne

, F L

Ea u G all ie Blv d., Su ite A

Te

l. 3

.25

3.1

CO

A

C on su lti ng

E ng in ee rs

CO

NS

TR

UC

TI

ON

EN

GI

NE

ER

IN

G

GR

OU

P

DAVID M. TOM, PE

PE # 56699

DMT

CONTRACTOR SHALL PERMIT THE NPDES NOTICE OF

INTENT (NOI) AND RECEIVE THE ACKNOWLEDGEMENT

LETTER PRIOR TO BREAKING GROUND UNLESS EXEMPT

BR

EV

AR

D

C O

U N

TY

P

U

BL

IC

W

O R

KS

E

N G

IN

EE

R

IN

G S

TA

N

D

AR

D D

EV

EL

O

PM

EN

T

N O

TE

S

2026-07-08T11:07:23-0400
David M Tom

File details come from the government source that posted it. Updated .