About this file

1.To issue corrections in the solicitation to Section B (See Block 14 continuation page 2 thru 32) 2. To include the Questions and Answers (See Attachment A) 3.To extend the proposal submission date from December 10 2015 to December 21 2015 at 17 00 Arabia Standard Time (AST).

View the file

Other files

File Type Posted
Attachment_A_(QA)-20151210.doc DOC document
Amendment_A001.pdf PDF
Quick_Start_Guide_For_New_Foreign_Registrations.pdf PDF
SSA70015R0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

f\.MENI1MENT OF SOLICIT ATION/MODIFICA TION OF CONTRACT I. CONTRACT ID CODE PAGE OF

PAGES

1 131

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

A002 12/10/2015 4216502

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

CODE

Contracting Officer N/A Embassy of the United States of America P.O. Box 94309 Riyadh 11693, Saudi Arabia TeL: 488-3800 Fax: 488-7939 Email: RivadhContracting@,state.gov

8. NAME AND ADDRESS OF CONTRACTOR (NO, street,city,county,State,and ZIP Code) 9a. AMENDMENT OF SOLICITATION NO.

SSA 70015ROO04

X 9b. DATED (SEE ITEM 11) 091812015 lOa. MODIFICATION OF CONTRACT/ORDER NO.

lOb. DATED (SEE ITEM 13)

II. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X 1 The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ 1 is extended, [Xl is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one (1) copy of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12.ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODI FICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGEORDER IS ISSUED PURSUANTTO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14ARE MADE INTHE CONTRACTORDER NO. IN ITEM lOA

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIEDTO REFLECTTHE ADMINISTRATIVECHANGES (such as changes inpaying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANTTO THE AUTHORITYOF FAR 43.103(b)

C. THIS SUPPLEMENTALAGREEMENT IS ENTERED INTO PURSUANTTO AUTHORITYOF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [J is not, [X 1 is required to sign this document and return 01 copies to the issuing office.

14.DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter wherefeasible.)

The purpose of this amendment is to issue the following

1. To issue corrections in the solicitation to Section B (See Block 14 continuation page 2 thru 32)

2. To include the Questions and Answers (See AttachmentA)

3. To extend the proposal submission date from December 10,2015 to December 21, 2015 at 17:00Arabia Standard

Time (AST).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or lOA, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type orprint) 16A NAME OF CONTRACTING OFFICER ~

\0~\ -4~.J'

Kevin M. Phillips #~~q_ 15B. NAME OF CONTRACTOR/OFFEROR 15CDATE 16B. UNI~ATESOFAMER~';:, ~~<i:'!\. -~ !>'1ESIGNED

SIGNED /J} r2 <11.,. ...~~ \i!, Ij I BY J~ -'7('~""'r./;u; I~ :d01S-BY ~-r--:if

(Signature of person authorized to sign) (Signature of Contracting Officer) "'" F IY(>..'il

NSN 7540-01-152-8070

Previous edition unusable

Standard Form 30 (revised 10/83) Prescribed by GSA FAR (48 CFR) 53.243

Page 2 of31 SSA70015R0004-- Amendment A002

Continuation page of Block 14.

The purpose of this amendment to this solicitation is to add and correct the columns (d) Freight Handling

(f) Cost of Van Lifts and (g) Cost ofCratings and (6) Customs Cleareance, to all of Section B.5 thru B9.2.

to now read the following;

B.5 BASE PERIOD PRICES = Embassy of the United States of America, Riyadh

Services Unit of Rate per Estimated Total Est.

Measure Unit Ouantitv" Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net

261,500

(2) Packing ofUAB Kilo net

22,000

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 261,500

(2) Unpacking ofUAB Kilo net

22,000

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

12,000

(d) Freight Handling Transportation between:

(1) Embassy/Consulate Jeddah

(i) Container Cargo 20' Cont. 15

(ii) Container Cargo 40' Cont. 10

(iii) General Cargo 100 Kilo 5,000 net

(iv) Vehicles Unit 10

(2) Embassy/Consulate Dhahran

(i) Container Cargo 20' 10

(ii) Container Cargo 40' 5

(iii) General Cargo 100 Kilo 2,500 net

(iv) Vehicles Unit 5

(3) Embassy/ Dry Port

(i) Container Cargo 20' 100

(ii) Container Cargo 40' 150

(iii) General Cargo 100 Kilo 35,000 net

(iv) Vehicles Unit 55

(4) Embassy/Local Airport 100 Kilo 50,000

(5) Vehicles

(i) Without Boxing Vehicle 55

(ii) With Boxing Vehicle 55

(6) Customs Clearance Shipment

(i) Air shipment 250

(ii) Sea Shipment 300

(e) Cost of fumigating the empty CBM 4000 wooden containers

(f) Cost of Lift vans Each 700

(g) Cost of Crating CBM 250

TOTAL:

Page 3 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

Page 4 of31

B.5.l BASE PERIOD PRICES = American Consulate General, leddah

Services Unit of Rate per Estimated Total Est.

Measure Unit Ouantitv* Amount

(a) Packing Services

(1) Packing of HHE Effects Kilo net

83,000

(2) Packing ofUAB Kilo net

5,500

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 83,000

(2) Unpacking ofUAB Kilo net

5,500

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

5,000

(d) Freight Handling Transportation between:

(1) Consulate leddah/Embassy

(i) Container Cargo 20' Cont. 10

(ii) Container Cargo 40' Cont. 5

(iii) General Cargo 100Kilo 2,500 net

(iv) Vehicles Unit 5

(2) Consulate leddah IConsulate Dhahran

(i) Container Cargo 20' 5

(ii) Container Cargo 40' 3

(iii) General Cargo 100Kilo 2,500 net

(iv) Vehicles Unit 5

(3) Consulate 1eddah I 1eddah Islamic Port

(i) Container Cargo 20' 90

(ii) Container Cargo 40' 50

(iii) General Cargo 100Kilo 15,000 net

(iv) Vehicles Unit 15

(4) Consulate 1eddah ILocal 100Kilo 5,500 Airport net

(5) Vehicles

(i) Without Boxing Vehicle 15

(ii) With Boxing Vehicle 15

(6) Customs Clearance Shipment

(i) Air shipment 100

(ii) Sea Shipment 140

(e) Cost of fumigating the empty CBM 1600 wooden containers

(f) Cost of Lift vans Each 300

(g) Cost of Crating CBM 150

TOTAL:

Page 5 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 6 of31

B.5.2 BASE PERIOD PRICES = American Consulate General, Dhahran

Services Unit of Rate per Estimated Total Est.

Measure Unit Quantity* Amount

(a) Packing Services

(1) Packing of HHE Effects Kilo net

45,500

(2) Packing of UAB Kilo net

2,500

(b) Unpacking Services

(1) Unpacking of HHE Effects Kilo net 45,500

(2) Unpacking of UAB Kilo net

2,500

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

3,000

(d) Freight Handling Transportation between:

(1) Consulate DhahraniEmbassy

(i) Container Cargo 20' Cont. 5

(ii) Container Cargo 40' Cont. 5

(iii) General Cargo 100Kilo 2,500 net

(iv) Vehicles Unit 5

(2) Consulate Dhahran IConsulate Jeddah

(i) Container Cargo 20' 5

(ii) Container Car_go 40' 3

(iii) General Cargo 100Kilo 2,500 net

(iv) Vehicles Unit 5

(3) Consulate Dhahran I King A'Aziz Port

(i) Container Cargo 20' 70

(ii) Container Cargo 40' 40

(iii) General Cargo 100Kilo 15,000 net

(iv) Vehicles Unit 10

(4) Consulate Dhahran ILocal 100Kilo 5,500 Airport net

(5) Vehicles

(i) Without Boxing Vehicle 10

(ii) With Boxing Vehicle 10

(6) Customs Clearance Shipment

(i) Air shipment 35

(ii) Sea Shipment 150

(e) Cost of fumigating the empty CBM 1,100 wooden containers

(f) Cost of Lift vans Each 200

(g) Cost of Crating CBM 100

TOTAL:

Page 7 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 8 of31

B.6 FIRST OPTION YEAR PRICES

Option Term: Twelve (12) Months

R" dhIVa Services Unit of Rate per Estimated Total Est.

Measure Unit Quantity* Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net 288,000

(2) Packing ofUAB Kilo net 24,200

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 288,000

(2) Unpacking ofUAB Kilo net

24,200

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

13,200

(d) Freight Handling Transportation between:

(1) Embassy/Consulate leddah

(i) Container Cargo 20' Cont. 16

(ii) Container Cargo 40' Cont. 11

(iii) General Cargo 100 Kilo 5,500 net

(iv) Vehicles Unit 11

(2) Embassy/Consulate Dhahran

(i) Container Cargo 20' 11

(ii) Container CaI"go 40' 6

(iii) General Cargo 100 Kilo 2,750 net

(iv) Vehicles Unit 6

(3) Embassy/ Dry Port

(i) Container Cargo 20' 110

(ii) Container Cargo 40' 165

(iii) General Cargo 100 Kilo 38,500 net

(iv) Vehicles Unit 60

(4) Embassy/Local Airport 100 Kilo 55,000

(i) Without Boxing Vehicle 60

(ii) With Boxing Vehicle 60

(6) Customs Clearance Shipment

(i) Air shipment 275

(ii) Sea Shipment 330

(e) Cost of fumigating the empty CBM 4,000 wooden containers

(1) Cost of Lift vans Each 700

(g) Cost of Crating CBM 275

TOTAL:

Page 9 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 10 of31

B.6.1 FIRST OPTION YEAR PRICES

Option Term: Twelve (12) Months

Jeddah Services Unit of Rate per Estimated Total Est.

Measure Unit Ouantitv* Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net 91,300

(2) Packing ofUAB Kilo net 6,100

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 91,300

(2) Unpacking ofUAB Kilo net

6,100

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

5,500

(d) Freight Handling Transportation between:

(1) Consulate Jeddah/Embassy

(i) Container Cargo 20' Cont. 11

(ii) Container Cargo 40' Cont. 6

(iii) General Cargo 100Kilo 2,800 net

(iv) Vehicles Unit 6

(2) Consulate Jeddah IConsulate Dhahran

(i) Container Cargo 20' 6

(ii) Container Cargo 40' 4

(iii) General Cargo 100Kilo 2,800 net

(iv) Vehicles Unit 6

(3) Consulate Jeddah I Jeddah Islamic Port

(i) Container Cargo 20' 100

(ii) Container Cargo 40' 55

(iii) General Cargo 100Kilo 16,500 net

(iv) Vehicles Unit 17

(4) Consulate Jeddah ILocal 100Kilo 6,100

(i) Without Boxing Vehicle 17

(ii) With Boxing Vehicle 17

(6) Customs Clearance Shipment

(i) Air shipment 110

(ii) Sea Shipment 155

(e) Cost of fumigating the empty CBM 1,600 wooden containers

(f) Cost of Lift vans Each 300

(g) Cost of Crating CBM 110

TOTAL:

Page 11 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 12 of31

B.6.2 FIRST OPTION YEAR PRICES

Option Term: Twelve (12) Months

Dhahran Services Unit of Rate per Estimated Total Est.

Measure Unit Quantity* Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net 50,100

(2) Packing ofUAB Kilo net 3,000

(b) Unpacking Services

(1) Unpacking of HHE Effects Kilo net 50,100

(2) Unpacking ofUAB Kilo net

3,000

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

3,300

(d) Freight Handling Transportation between:

(1) Consulate DhahraniEmbassy

(i) Container Cargo 20' Cont. 6

(ii) Container Cargo 40' Cont. 6

(iii) General Cargo 100Kilo 3,000 net

(iv) Vehicles Unit 6

(2) Consulate Dhahran IConsulate Jeddah

(i) Container Cargo 20' 6

(ii) Container Cargo 40' 5

(iii) General Cargo 100Kilo 3,000 net

(iv) Vehicles Unit 6

(3) Consulate Dhahran I King A'Aziz Port

(i) Container Cargo 20' 80

(ii) Container Cargo 40' 45

(iii) General Cargo 100Kilo 16,500

(iv) Vehicles Unit 11

(4) Consulate Dhahran /Local 100Kilo 6,100 Airport net

(5) Vehicles

(i) Without Boxing Vehicle 11

(ii) With Boxing Vehicle 11

(6) Customs Clearance Shipment

(i) Air shipment 40

(ii) Sea Shipment 170

(e) Cost of fumigating the empty CBM 1100 wooden containers

(f) Cost of Lift vans Each 200

(g) Cost of Crating CBM 110

TOTAL:

Page 13 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

B.7 SECOND OPTION YEAR PRICES

Option Term: Twelve (12) Months

Page 14 of31

Rivadh Services Unit of Rate per Estimated Total Est.

Measure Unit Quantity* Amount

(a) Packing Services

(l) Packing of HHE Effects Kilo net 315,000

(2) Packing ofUAB Kilo net 27,000

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 315,000

(2) Unpacking ofUAB Kilo net

27,000

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

14,500

(d) Freight Handling Transportation between:

(1) Embassy/Consulate Jeddah

(i) Container Cargo 20' Cont. 17

(ii) Container Cargo 40' Cont. 12

(iii) General Cargo 100 Kilo 6,100 net

(iv) Vehicles Unit 12

(2) Embassy/Consulate Dhahran

(i) Container Cargo 20' 12

(ii) Container Cargo 40' 10

(iii) General Cargo 100 Kilo 3,000 net

(iv) Vehicles Unit 7

(3) Embassy/ Dry Port

(i) Container Car'go 20' 120

(ii) Container Cargo 40' 170

(iii) General Cargo 100 Kilo 42,500 net

(iv) Vehicles Unit 65

(4) Embassy/Local Airport 100 Kilo 61,000 net

(i) Without Boxing Vehicle 65

(ii) With Boxing Vehicle 65

(6) Customs Clearance Shipment

(i) Air shipment 330

(ii) Sea Shipment 370

(e) Cost of fumigating the empty CBM 4,000 wooden containers

(f) Cost of Lift vans Each 700

(g) Cost of Crating CBM 300

TOTAL:

Page 15 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 16 of31

B.7.1 SECONDOPTION YEAR PRICES

Option Term: Twelve (12) Months

Jeddah Services Unit of Rate per Estimated Total Est.

Measure Unit Quantity* Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net 100,500

(2) Packing ofUAB Kilo net 6,700

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 100,500

(2) Unpacking ofUAB Kilo net

6,700

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

6,100

(d) Freight Handling Transportation between:

(1) Consulate JeddahiEmbassy

(i) Container Cargo 20' Cont. 12

(ii) Container Cargo 40' Cont. 7

(iii) General Cargo 100Kilo 3,100 net

(iv) Vehicles Unit 7

(2) Consulate Jeddah IConsulate Dhahran

(i) Container Cargo 20' 6

(ii) Container Cargo 40' 4

(iii) General Cargo 100Kilo 3,100 net

(iv) Vehicles Unit 7

(3) Consulate Jeddah I Jeddah Islamic Port

(i) Container Cargo 20' 110

(ii) Container Cargo 40' 60

(iii) General Cargo 100Kilo 18,000 net

(iv) Vehicles Unit 20

I (4) Consulate Jeddah ILocal 100Kilo 6..700

(i) Without Boxing Vehicle 20

(ii) With Boxing Vehicle 20

(6) Customs Clearance Shipment

(i) Air shipment 120

(ii) Sea Shipment 170

(e) Cost of fumigating the empty CBM 1,600 wooden containers

(f) Cost of Lift vans Each 300

(g) Cost of Crating CBM 120

TOTAL:

Page 17 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 18 of31

B.7.2 SECONDOPTION YEAR PRICES

Option Term: Twelve (12) Months

Dhahran Services Unit of Rate per Estimated Total Est.

Measure Unit Quantity* Amount

(a) Packing Services

(1) Packing of HHE Effects Kilo net 55,000

(2) Packing ofUAB Kilo net 3,300

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 55,000

(2) Unpacking ofUAB Kilo net

3,300

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

3,600

(d) Freight Handling Transportation between:

(1) Consulate Dhahran/Embassy

(i) Container Cargo 20' Cont. 7

(ii) Container Cargo 40' Cont. 7

(iii) General Cargo 100Kilo 3,300 net

(iv) Vehicles Unit 7

(2) Consulate Dhahran IConsulate Jeddah

(i) Container Cargo 20' 7

(ii) Container Cargo 40' 6

(iii) General Cargo 100Kilo 3,300 net

(iv) Vehicles Unit 7

(3) Consulate Dhahran I King A'Aziz Port

(i) Container Cargo 20' 90

(ii) Container Cargo 40' 50

(iii) General Cargo 100Kilo 18,000 net

(iv) Vehicles Unit 12

(4) Consulate Dhahran ILocal 100Kilo 6,700

(i) Without Boxing Vehicle 12

(ii) With Boxing Vehicle 12

(6) Customs Clearance Shipment

(i) Air shipment 45

(ii) Sea Shipment 190

(e) Cost of fumigating the empty CBM 1,100 wooden containers

(f) Cost of Lift vans Each 200

(g) Cost of Crating CBM 120

TOTAL:

Page 19 of31

"This estimated amount ISbased on total estimated Government requirements. This means that If more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 20 of31

B.8 THIRD OPTION YEAR PRICES

Option Term: Twelve (12) Months

R· dhIVa Services Unit of Rate per Estimated Total Est.

Measure Unit Quantity* Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net 330,000

(2) Packing ofUAB Kilo net 28,500

(b) Unpacking Services

(1) Unpacking of HHE Effects Kilo net 330,000

(2) Unpacking ofUAB Kilo net

28,500

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

15,000

(d) Freight Handling Transportation between:

(1) Embassy/Consulate leddah

(i) Container Cargo 20' Cont. 18

(ii) Container Cargo 40' Cont. 13

(iii) General Cargo 100Kilo 6,500 net

(iv) Vehicles Unit 13

(2) Embassy/Consulate Dhahran

(i) Container Cargo 20' 13

(ii) Container Cargo 40' 11

(iii) General Cargo 100Kilo 3,200 net

(iv) Vehicles Unit 8

(3) Embassy/ Dry Port

(i) Container Cargo 20' 125

(ii) Container Cargo 40' 175

(iii) General Cargo 100Kilo 44,500

(iv) Vehicles Unit 70

(4) Embassy/Local Airport 100 Kilo 64,000

(5) Vehicles

(i) Without Boxing Vehicle 70

(ii) With Boxing Vehicle 70

(6) Customs Clearance Shipment

(i) Air shipment 345

(ii) Sea Shipment 380

(e) Cost of fumigating the empty CBM 4,000 wooden containers

(f) Cost of Lift vans Each 700

(g) Cost of Crating CBM 320

TOTAL:

Page 21 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 22 of31

B.8.1 THIRD OPTION YEAR PRICES

Option Term: Twelve (12) Months leddah Services Unit of Rate per Estimated Total Est.

Measure Unit Ouantitv* Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net 105,500

(2) Packing ofUAB Kilo net 7,000

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 105,500

(2) Unpacking ofUAB Kilo net

7,000

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

6,400

(d) Freight Handling Transportation between:

(1) Consulate 1eddah/Embassy

(i) Container Cargo 20' Cont. 14

(ii) Container Cargo 40' Cont. 8

(iii) General Cargo 100Kilo 3,300 net

(iv) Vehicles Unit 8

(2) Consulate leddah IConsulate Dhahran

(i) Container Cargo 20' 7

(ii) Container Cargo 40' 5

(iii) General Cargo 100Kilo 3,300 net

(iv) Vehicles Unit 8

(3) Consulate leddah I leddah Islamic Port

(i) Container Cargo 20' 150

(ii) Container Cargo 40' 65

(iii) General Cargo 100Kilo 19,000 net

(iv) Vehicles Unit 22

(4) Consulate leddah ILocal 100Kilo 7,000

(i) Without Boxing Vehicle 22

(ii) With Boxing Vehicle 22

(6) Customs Clearance Shipment

(i) Air shipment 130

(ii) Sea Shipment 180

(e) Cost of fumigating the empty CBM 1,600 wooden containers

(f) Cost of Lift vans Each 300

(g) Cost of Crating CBM 125

TOTAL:

Page 23 of31

*This estimated amount is based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 24 of3 I

B.8.2 THIRD OPTION YEAR PRICES

Option Term: Twelve (12) Months

Dhahran Services Unit of Rate per Estimated Total Est.

Measure Unit Ouantity* Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net 57,500

(2) Packing ofUAB Kilo net 3,500

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 57,500

(2) Unpacking ofUAB Kilo net

3,500

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

3,800

(d) Freight Handling Transportation between:

(1) Consulate DhahraniEmbassy

(i) Container Cargo 20' Cont. 8

(ii) Container Cargo 40' Cont. 8

(iii) General Cargo 100Kilo 3,500 net

(iv) Vehicles Unit 8

(2) Consulate Dhahran IConsulate Jeddah

(i) Container Car_go 20' 8

(ii) Container Cargo 40' 7

(iii) General Cargo 100Kilo 3,500 net

(iv) Vehicles Unit 8

(3) Consulate Dhahran I King A'Aziz Port

(i) Container Cargo 20' 95

(ii) Container Cargo 40' 55

(iii) General Cargo 100Kilo 19,000 net

(iv) Vehicles Unit 14

(4) Consulate Dhahran ILocal 100Kilo 7,000

(i) Without Boxing Vehicle 14

(ii) With Boxing Vehicle 14

(6) Customs Clearance Shipment

(i) Air shipment 50

(ii) Sea Shipment 200

(e) Cost of fumigating the empty CBM 1,100 wooden containers

(f) Cost of Lift vans Each 200

(g) Cost of Crating CBM 130

TOTAL:

Page 25 of31

*This estimated amount is based on total estimated Government requirements. This means that If more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 26 of31

B.9 FOURTH OPTION YEAR PRICES

Option Term: Twelve (12) Months

R· dhIVa Services Unit of Rate per Estimated Total Est.

Measure Unit Ouantitv* Amount

(a) Packing Services

(1) Packing ofHHE Effects Kilo net 345,000

(2) Packing ofUAB Kilo net 30,000

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 345,000

(2) Unpacking ofUAB Kilo net

30,000

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

16,000

(d) Freight Handling Transportation between:

(1) Embassy/Consulate Jeddah

(i) Container Cargo 20' Cont. 19

(ii) Container Cargo 40' Cont. 14

(iii) General Cargo 100 Kilo 6,800 net

(iv) Vehicles Unit 14

(2) Embassy/Consulate Dhahran

(i) Container Cargo 20' 14

(ii) Container Cargo 40' 12

(iii) General Cargo 100 Kilo 3,300 net

(iv) Vehicles Unit 9

(3) Embassy/ Dry Port

(i) Container Cargo 20' 130

(ii) Container Cargo 40' 180

(iii) General Cargo 100 Kilo 47,000 net

(iv) Vehicles Unit 70

(4) EmbassylLocal Airport 100 Kilo 67,000

(i) Without Boxing Vehicle 70

(ii) With Boxing Vehicle 70

(6) Customs Clearance Shipment

(i) Air shipment 360

(ii) Sea Shipment 400

(e) Cost of fumigating the empty CBM 4,000 wooden containers

(f) Cost of Lift vans Each 700

(g) Cost of Crating CBM 330

TOTAL:

Page 27 of31

"This estimated amount ISbased on total estimated Government requirements. This means that If more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 28 of31

B.9.1 FOURTH OPTION YEAR PRICES

Option Term: Twelve (12) Months leddah Services Unit of Rate per Estimated Total Est.

Measure Unit Ouantitv* Amount

(a) Packing Services

(1) Packing of HHE Effects Kilo net 110,000

(2) Packing ofUAB Kilo net 7,300

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 110,000

(2) Unpacking ofUAB Kilo net

7,300

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

(d) Freight Handling Transportation between:

(1) Consulate 1eddahlEmbassy

(i) Container Cargo 20' Cont. 15

(ii) Container Cargo 40' Cont. 9

(iii) General Cargo 100Kilo 3,500 net

(iv) Vehicles Unit 9

(2) Consulate leddah IConsulate Dhahran

(i) Container Cargo 20' 8

(ii) Container Cargo 40' 6

(iii) General Cargo 100Kilo 3,500 net

(iv) Vehicles Unit 9

(3) Consulate 1eddah I 1eddah Islamic Port

(i) Container Cargo 20' 160

(ii) Container Cargo 40' 70

(iii) General Cargo 100Kilo 20,000 net

(iv) Vehicles Unit 22

(4) Consulate 1eddah ILocal 100Kilo 7,500

(i) Without Boxing Vehicle 22

(ii) With Boxing Vehicle 22

(6) Customs Clearance Shipment

(i) Air shipment 135

(ii) Sea Shipment 190

(e) Cost of fumigating the empty CBM 1,600 wooden containers

(f) Cost of Lift vans Each 300

(g) Cost of Crating CBM 130

TOTAL:

Page 29 of31

"This estimated amount IS based on total estimated Government requirements. This means that if more than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be

Page 30 of31

B.9.2 FOURTH OPTION YEAR PRICES

Option Term: Twelve (12) Months

Dhahran Services Unit of Rate per Estimated Total Est.

Measure Unit Ouantitv* Amount

(a) Packing Services

(1) Packing of HHE Effects Kilo net 60,000

(2) Packing ofUAB Kilo net 3,700

(b) Unpacking Services

(1) Unpacking ofHHE Effects Kilo net 60,000

(2) Unpacking ofUAB Kilo net

3,700

(c) Storage Services

(1) Monthly Storage of Effects Kilo net

4,000

(d) Freight Handling Transportation between:

(1) Consulate Dhahran/Embassy

(i) Container Cargo 20' Cont. 9

(ii) Container Cargo 40' Cont. 9

(iii) General Cargo 100Kilo 3,700 net

(iv) Vehicles Unit 8

(2) Consulate Dhahran IConsulate Jeddah

(i) Container Cargo 20' 9

(ii) Container Cargo 40' 8

(iii) General Cargo 100Kilo 3,700 net

(iv) Vehicles Unit 8

(3) Consulate Dhahran I King A'Aziz Port

(i) Container Cargo 20' 100

(ii) Container Cargo 40'

(iii) General Cargo 100Kilo 20,000 net

(iv) Vehicles Unit 14

(4) Consulate Dhahran ILocal 100Kilo 7,300

(i) Without Boxing Vehicle 14

(ii) With Boxing Vehicle 14

(6) Customs Clearance Shipment

(i) Air shipment 55

(ii) Sea Shipment 210

(e) Cost of fumigating the empty CBM 1,100 wooden containers

(f) Cost of Lift vans Each 200

(g) Cost of Crating CBM 135

TOTAL:

Page 3I of3 I

*This estimated amount is based on total estimated Government requirements. This means that Ifmore than one award is made, the estimated amount of work awarded under task order(s) to any single contractor will be less than the amount shown.

B.10 GRANDTOTAL

Riyadh Jeddah Dhahran Total

BASE YEAR:

FIRST OPTIONYEAR:

SECOND OPTIONYEAR:

THIRD OPTIONYEAR:

FOURTH OPTIONYEAR:

GRAND TOTAL:

File details come from the government source that posted it. Updated .