Summary of RFP: Greenbelt Vision Zero Action Plan, Health Analysis, and Demonstration Projects
This Request for Proposals (RFP 2026-09-R) is issued by the City of Greenbelt, Maryland, Department of Planning & Community Development for professional consulting services to develop a comprehensive Vision Zero Action Plan, conduct a supplemental health analysis, and design and evaluate up to three quick-build demonstration projects utilizing a Safe System Approach. The selected consultant must complete a Project Management Plan, conduct existing conditions and transportation safety analysis including crash analysis and High Injury Network development, develop a health analysis framework with community health assessments, execute a robust public engagement strategy with three public workshops and stakeholder interviews, implement demonstration projects with site selection through evaluation phases, and produce a final Vision Zero Action Plan with prioritized project lists and funding strategies. A mandatory pre-proposal conference is scheduled for September 16, 2026, at 11:00 AM at the Greenbelt Community Center. Proposals are due October 2, 2026, at 3:00 PM, submitted to Jaime Fearer, Acting Director of Planning & Community Development. Optional interviews may be conducted in October 2026, with consultant selection expected by October 31, 2026, City Council approval on November 9, 2026, and Notice to Proceed on November 16, 2026. The contract term extends from execution through June 30, 2028, with all deliverables becoming property of the City.
The total project budget is $250,000, consisting of $200,000 in Federal Highway Administration (FHWA) Safe Streets and Roads for All (SS4A) Planning and Demonstration Grant funds (Federal Award No. 693JJ32540818) and $50,000 in required local match funds from the City of Greenbelt. The anticipated allocation designates $190,000 for professional services and $60,000 for demonstration project implementation. Cost proposals will be evaluated for reasonableness and completeness rather than lowest price. The technical evaluation is weighted at 100 points across criteria including understanding of project scope, SS4A/Vision Zero experience, health analysis experience, public engagement approach, demonstration project experience, project team qualifications, and state/local government experience. Cost proposals are worth up to 10 points, and optional interviews may add up to 20 points, resulting in a maximum possible score of 130 points (or 110 if interviews are not conducted). The consultant must comply with federal requirements including 2 CFR Part 200, Title VI of the Civil Rights Act, Americans with Disabilities Act, NEPA, Build America Buy America Act, and maintain comprehensive insurance coverage including $1,000,000 professional liability per claim, with the City named as additional insured.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF GREENBELT
25 Crescent Road
Greenbelt, MD 20770
REQUEST FOR PROPOSALS (RFP)
PROFESSIONAL CONSULTING SERVICES FOR THE
GREENBELT VISION ZERO ACTION PLAN, HEALTH ANALYSIS, AND
DEMONSTRATION PROJECTS
Safe Streets and Roads for All (SS4A) Planning and Demonstration Grant
Contract No. 2026-09-R
Proposals Due
October 2, 2026 @ 3:00 PM
This project is funded by the City of Greenbelt and a USDOT grant administered by the Federal Highway Administration (FHWA). It must meet all City of Greenbelt procurement requirements. The City of Greenbelt is an Equal Opportunity Employer.
Greenbelt Department of Planning & Community Development 15 Crescent Road, Suite 200 Greenbelt, Maryland 20770
(301) 345-5417
I. GENERAL INFORMATION
A. RFP Title
Greenbelt Vision Zero Action Plan, Health Analysis, and Demonstration Projects
B. RFP Number
2026-09-R
C. Issuing Department
City of Greenbelt Department of Planning & Community Development 15 Crescent Road, Suite 200 Greenbelt, Maryland 20770
D. Issuing Officer
Jaime Fearer, Acting Director of Planning & Community Development
E. Funding Source
This project is funded through the U.S. Department of Transportation Federal Highway Administration Safe Streets and Roads for All (SS4A) Program under Federal Award No.
693JJ32540818. The grant award provides $200,000 in federal funds and requires a $50,000 local match for a total project budget of $250,000.
F. Procurement Schedule
Milestone Date*
RFP Issued September 9, 2026
Pre-Proposal Conference** September 16, 2026
Question Due September 17, 2026
Responses Posted September 24, 2026
Proposals Due October 2, 2026
Interviews (Optional) October 2026
Milestone Date*
Consultant Selection October 2026
City Council Approval November 9, 2026
Notice to Proceed November 16, 2026
* The City reserves the right to modify these dates.
** A pre-proposal conference will be held at the Greenbelt Community Center (15 Crescent Road, Room 114, Greenbelt, MD) on Wednesday, September 16, 2026, 11:00 am – 12:00
pm. Attendance is not mandatory.
II. PROJECT BACKGROUND
The City of Greenbelt was originally envisioned to be a walkable, bikeable community, and at its core, much of the central historic district remains relatively safe for multimodal transportation. As Federal and State highways expanded, the City and its land uses were carved into disparate sections divided by heavy, fast-moving traffic. City staff and elected leaders propose developing a Vision Zero Action Plan, complemented and informed by a supplemental health analysis and quick-build demonstration projects, that incorporates a Safe System Approach.
The City was awarded an SS4A Planning and Demonstration Grant to:
• Develop a comprehensive Vision Zero Action Plan that establishes a framework for eliminating roadway fatalities and serious injuries;
• Conduct a supplemental Health Analysis; and
• Design and evaluate up to three quick-build demonstration projects;
III. PROJECT GOALS
The selected consultant shall:
• Develop a comprehensive Vision Zero Action Plan;
• Utilize the Safe System Approach;
• Conduct a health analysis;
• Develop a High Injury Network (HIN);
• Engage community stakeholders;
• Identify and prioritize transportation safety improvements;
• Design and evaluate demonstration projects; and
• Position the City for future implementation grants.
IV. SCOPE OF WORK
Task 1. Project Management
Deliverables
• Project Management Plan
• Detailed Schedule
• Monthly Progress Reports
• Meeting Summaries
Task 2. Existing Conditions and Transportation Safety Analysis
Activity Target Date
Project Kickoff Meeting November/December 2026
Existing Conditions Data Collection December 2026 - February 2027
Crash Analysis and High Injury Network January - March 2027
Existing Conditions Technical Memo March 2027
Existing Conditions Presentation April 2027
Deliverables
• Existing conditions report
• Crash analysis
• High Injury Network
• GIS Database
Task 3. Health Analysis
Health Analysis Framework Development January - March 2027
Community Health Assessment February - April 2027
Draft Health Analysis May 2027
City Review June 2027
Final Health Analysis July 2027
• Health analysis framework
• Community assessment
• Draft health analysis
• Final health analysis
• Equity prioritization criteria
Task 4. Public Engagement
Engagement Plan Development January 2027
Stakeholder Interviews February - May 2027
Public Workshop #1 April 2027
Public Workshop #2 June 2027
Demonstration Project Outreach Summer 2027
Public Workshop #3 Fall 2027
Draft Plan Public Review Period January - February 2028
• Public engagement plan
• Outreach materials
• Stakeholder interviews
• Survey results
• Public workshops
• Engagement summary report
Task 5. Demonstration Projects
The City’s SS4A grant includes up to three quick-build demonstration projects, preferably one in each of the discrete areas of the City. The selected consultant shall assist with:
• Site selection
• Preliminary concepts
• Final concept design
• NEPA coordination support
• Installation support
• Data collection
• Evaluation
Activity Target Date
NEPA Completion (Categorical Exemption) January 2027
Demonstration Site Selection April - June 2027
Preliminary Designs May - July 2027
Final Concept Designs August 2027
Installation September - October 2027
Performance Evaluation October 2027 - February 2028
Demonstration Project Assessment March 2028
• Site selection memorandum
• Concept designs
• Before-and-after analysis
• Demonstration evaluation report
Task 6. Vision Zero Action Plan
Draft Goals and Strategies Fall 2027
Administrative Draft Plan January 2028
Public Review Draft February 2028
Advisory Planning Board Review February - March 2028
City Council Review March - April 2028
Final Plan Publication April 30, 2028
• Administrative draft plan
• Public review draft
• Final Vision Zero Action Plan
• Executive summary
• Prioritized project list and project estimates
• Funding strategy
Task 7. Grant Closeout
Final Reporting Documentation May - June 2028
Final SS4A Report Submission June 30, 2028
V. PROJECT SCHEDULE
Major Milestones
Milestone Date
NEPA Completion (CE) January 2027
Existing Conditions Complete March 2027
Milestone Date
Draft Health Analysis May 2027
Final Health Analysis July 2027
Demonstration Site Selection April - June 2027
Demonstration Project Installation September - October 2027
Administrative Draft Vision Zero Action Plan January 2028
Public Review Draft February 2028
Final Plan Published April 30, 2028
SS4A Final Report June 30, 2028
VI. PROJECT BUDGET
Funding Source Amount
FHWA SS4A Grant $200,000
City Match $50,000
Total Project Budget $250,000
Anticipated Allocation
Category Amount
Professional Services $190,000
Demonstration Project Implementation $60,000
Total $250,000
VII. PROPOSAL REQUIREMENTS
A. Executive Summary
B. Firm Qualifications
C. Project Team
D. Technical Approach
E. Public Engagement Strategy
F. Health Analysis Approach
G. Demonstration Project Approach
H. Detailed Schedule
I. References
Minimum three references.
J. Cost Proposal
Including:
• Labor Rates
• Level of Effort
• Reimbursables
• Not-to-Exceed Fee
VIII. EVALUATION CRITERIA
Technical Evaluation
Criteria Maximum Points
Understanding of Project and Technical Approach 25
SS4A / Vision Zero Experience 20
Health Analysis Experience 10
Public Engagement Approach 15
Criteria Maximum Points
Demonstration Project Experience 10
Project Team Qualifications 15
State and Local Government Experience 5
Total Maximum Technical Score 100
Cost Proposal Evaluation
Cost will be evaluated for reasonableness and completeness rather than for selecting the lowest cost proposal.
Criteria Maximum Points
Budget Completeness 5
Cost Reasonableness 5
Total Maximum Cost Score 10
Optional Interview If interviews are conducted, up to 20 additional points may be assigned.
Criteria Maximum Points
Team Presentation 5
Understanding of Greenbelt Issues 5
Project Management Approach 5
Responses to Questions 5
Total Maximum Interview Score 20
Final Score
Component Maximum Points
Technical Proposal 100
Interview (Optional) 20
Cost Proposal 10
Maximum Possible Score 130*
*If interviews are not conducted, the maximum possible score shall be 110 points.
IX. SELECTION PROCESS
A selection committee appointed by the City will review and evaluate proposals.
The City reserves the right to:
• Request clarifications;
• Conduct interviews;
• Request best and final offers;
• Negotiate scope and fee;
• Reject any or all proposals.
A selection is expected to be made by the end of October 2026, and the City’s Project Manager will facilitate the execution of a mutually acceptable contract between the City and the selected Consultant. The selected team and contract will be presented to the City Council at a regular Council meeting for approval.
X. FEDERAL REQUIREMENTS
The selected consultant shall comply with:
• 2 CFR Part 200;
• Title VI of the Civil Rights Act;
• Americans with Disabilities Act;
• Section 504 of the Rehabilitation Act;
• National Environmental Policy Act;
• Build America Buy America Act;
• Debarment and Suspension Requirements;
• FHWA SS4A Grant Requirements.
XI. PROPOSAL SUBMISSION
One (1) original, two (2) copies, and one (1) electronic copy in PDF format of the proposal in a sealed envelope clearly labeled “Proposal - Contract No. 2026-09-R, Greenbelt Vision Zero Action Plan” shall be submitted to:
Jaime Fearer Acting Director of Planning & Community Development 15 Crescent Road, Suite 200 Greenbelt, MD 20770
Email: jfearer@greenbeltmd.gov mailto:jfearer@greenbeltmd.gov
ATTACHMENT A – SAMPLE PROFESSIONAL SERVICES AGREEMENT
CITY OF GREENBELT, MARYLAND
SAMPLE PROFESSIONAL SERVICES AGREEMENT
CITY OF GREENBELT VISION ZERO ACTION PLAN, HEALTH ANALYSIS, AND
DEMONSTRATION PROJECTS
CONTRACT NO. 2026-09-R
This Professional Services Agreement ("Agreement") is entered into as of the ___ day of __________, 2026, by and between the City of Greenbelt, Maryland ("City"), a municipal corporation organized under the laws of the State of Maryland, and __________________________ ("Consultant").
ARTICLE 1. PURPOSE
The City has received funding through the Federal Highway Administration's Safe Streets and Roads for All (SS4A) Planning and Demonstration Grant Program to develop a Vision Zero Action Plan, conduct a Health Analysis, and implement demonstration projects. The City desires to retain Consultant to perform such services.
ARTICLE 2. SCOPE OF SERVICES
Consultant shall perform all services described in:
• The City's RFP;
• Consultant's Proposal dated ___________;
• Any written amendments executed by the parties.
Services may include:
• Project management;
• Existing conditions analysis;
• Safety analysis and High Injury Network development;
• Health Analysis;
• Public and stakeholder engagement;
• Demonstration project development and evaluation;
• Vision Zero Action Plan preparation;
• Grant reporting support.
ARTICLE 3. CONTRACT TERM
The Agreement shall commence upon execution and issuance of a Notice to Proceed.
The anticipated completion date shall be no later than June 30, 2028, unless extended by written amendment.
ARTICLE 4. COMPENSATION
The City shall pay Consultant an amount not to exceed:
$250,000 without written authorization from the City.
Compensation shall be based upon:
☐ Fixed Fee
☐ Time and Materials with Not-to-Exceed Limit
☒ Task-Based Lump Sum
A detailed fee schedule shall be attached as Exhibit A.
ARTICLE 5. INVOICING
Consultant may submit invoices monthly.
Invoices shall include:
• Task summary;
• Percentage complete by task;
• Labor hours by employee classification;
• Direct expenses;
• Progress achieved during billing period.
The City shall pay approved invoices within thirty (30) days.
The City reserves the right to withhold payment for incomplete or unsatisfactory work.
ARTICLE 6. PROJECT MANAGER
City Project Manager
Jaime Fearer Acting Director of Planning & Community Development City of Greenbelt 15 Crescent Road, Suite 200 Greenbelt, Maryland 20770
Consultant Project Manager
Name: ___________________
Title: ___________________
ARTICLE 7. OWNERSHIP OF DOCUMENTS
All work products developed under this Agreement shall become the property of the City.
This includes:
• Reports;
• GIS files;
• Databases;
• Maps;
• Technical memoranda;
• Survey data;
• Public engagement materials;
• Plans;
• Specifications;
• Graphics;
• Health Analysis materials;
• Vision Zero Action Plan documents.
Consultant may retain copies for archival purposes.
ARTICLE 8. INSURANCE
Consultant shall maintain insurance throughout the term of this Agreement.
Minimum requirements:
Comprehensive General Liability
Personal injury liability insurance with a limit of $1,000,000.00 for each occurrence and $1,000,000.00 aggregate, where insurance aggregates apply.
Property damage liability insurance with limits of $250,000.00 for each occurrence and $500,000.00 aggregate, where aggregates apply. Property damage insurance shall specifically include explosion, collapse, and underground damage (X, C, U).
Automobile Liability
Bodily injury liability with limits of $500,000.00 each person and $1,000,000.00 each incident
Property damage liability with a limit of $100,000 for each incident
Workers’ Compensation
Statutory Limits
Employer's Liability
$500,000
Professional Liability
$1,000,000 per claim
All insurance shall include completed operations and contractual liability coverage, and must name the City as an additional insured, not just a certificate holder.
Certificates of Insurance shall be provided prior to commencing work.
ARTICLE 9. INDEMNIFICATION
Consultant shall indemnify and hold harmless the City, its officers, employees, agents, and elected officials from claims arising from consultant's negligent acts, errors, omissions, or wrongful conduct.
Nothing herein shall be construed as a waiver of governmental immunity.
ARTICLE 10. CHANGES IN SERVICES
The City may order changes within the scope of the work.
Any change affecting schedule, scope, or compensation shall require a written amendment executed by both parties.
ARTICLE 11. SUBCONSULTANTS
No subconsultant may be substituted or added without prior written approval of the City.
Consultant shall remain fully responsible for all work performed by subconsultants.
ARTICLE 12. TERMINATION
Termination for Convenience
The City may terminate this Agreement at any time upon fifteen (15) days written notice.
Consultant shall be paid only for services satisfactorily completed through the termination date.
Termination for Cause
The City may immediately terminate this Agreement if consultant:
• Fails to perform required services;
• Violates applicable laws or regulations;
• Fails to maintain required insurance;
• Breaches material provisions of this Agreement.
ARTICLE 13. LIVING WAGE
Consultant shall comply with all applicable City of Greenbelt Living Wage requirements during contract performance.
ARTICLE 14. NONDISCRIMINATION
Consultant shall not discriminate against any employee, applicant, or participant based upon:
• Race;
• Color;
• National Origin;
• Religion;
• Sex;
• Disability;
• Age;
• Sexual Orientation;
• Gender Identity;
• Any protected classification under applicable law.
FEDERAL REQUIREMENTS EXHIBIT
ARTICLE 15. FEDERAL FUNDING
This project is funded through the U.S. Department of Transportation Safe Streets and Roads for All (SS4A) Program under Federal Award Number 693JJ32540818. Consultant shall comply with all federal requirements applicable to the award.
ARTICLE 16. FEDERAL PROCUREMENT REQUIREMENTS
Consultant shall comply with all applicable portions of:
• 2 CFR Part 200;
• Uniform Administrative Requirements;
• Federal Cost Principles;
• Audit Requirements for Federal Awards.
ARTICLE 17. TITLE VI AND CIVIL RIGHTS
Consultant shall comply with:
• Title VI of the Civil Rights Act of 1964;
• Americans with Disabilities Act;
• Section 504 of the Rehabilitation Act;
• Applicable FHWA civil rights requirements.
ARTICLE 18. DEBARMENT AND SUSPENSION
Consultant certifies that neither it nor its principals:
• Are suspended;
• Are debarred;
• Have been declared ineligible for federally funded contracts.
Consultant shall remain registered and in good standing within the System for Award Management (SAM).
ARTICLE 19. RECORD RETENTION
Consultant shall maintain all project records for a minimum of three (3) years following final grant close-out unless a longer retention period is required by law.
Records shall be made available upon request to:
• City of Greenbelt;
• FHWA;
• U.S. Department of Transportation;
• Federal auditors.
ARTICLE 20. ACCESS TO RECORDS
Consultant agrees to provide access to books, records, documents, papers, and electronic files related to the project for inspection and audit purposes.
ARTICLE 21. CONFLICT OF INTEREST
Consultant shall disclose any actual or potential conflicts of interest that could impair independent judgment or performance.
ARTICLE 22. DEMONSTRATION PROJECTS
Consultant acknowledges that demonstration projects funded under this Agreement are temporary installations intended to evaluate transportation safety strategies.
Recommendations regarding permanent implementation shall be based upon performance evaluations and project findings.
ARTICLE 23. BUILD AMERICA BUY AMERICA
Consultant shall assist the City in determining applicability of Build America, Buy America requirements for demonstration project materials, equipment, and installations when required.
ARTICLE 24. GOVERNING LAW
This Agreement shall be governed by the laws of the State of Maryland.
Venue shall lie in Prince George's County, Maryland.
SIGNATURES
CITY OF GREENBELT
By: __________________________
Name: Josué Salmerón
Title: City Manager
Date: __________________
CONSULTANT
By: __________________________
Name: ________________________
Title: _________________________
Date: __________________
File details come from the government source that posted it. Updated .